04.01.2014 Views

220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board

220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board

220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GETCO/E/TS – XMER01power/R4 Sept <strong>08</strong><br />

2.1 Microprocessor based Intelligent Electr<strong>on</strong>ic Device (IED), as required, to be <strong>on</strong> a<br />

single open bore ball or gate valve mounted <strong>on</strong> transformer al<strong>on</strong>g with all<br />

required fittings and accessories.<br />

2.2 One set of centralized m<strong>on</strong>itoring system with suitable software for<br />

communicating with IEDs simultaneously with a provisi<strong>on</strong> for communicating to<br />

two or more IEDs if required in future. The required software shall be loaded in<br />

GETCO system at desired locati<strong>on</strong> such that all the data/display associated with<br />

the system can be visualized and all archiving / trending can be achieved.<br />

Successful Bidder shall also be resp<strong>on</strong>sible for coordinati<strong>on</strong> with supplier of this<br />

<strong>on</strong> <strong>line</strong> system & SAS /GETCO system and ensure for proper interfacing with all<br />

required devices, cabling, software, hard ware, services, etc. It shall also give<br />

printouts of all required data as desired.<br />

2.3 All required interc<strong>on</strong>necti<strong>on</strong>, wiring, cabling with fiber optic cables/RS485<br />

cables etc., including all required accessories for successful operati<strong>on</strong> of the<br />

system.<br />

2.4 Required earthing & c<strong>on</strong>necti<strong>on</strong> for the system at required locati<strong>on</strong>.<br />

2.5 Necessary tools, tackles, calibrati<strong>on</strong> equipments, installati<strong>on</strong> Material, required<br />

for successful operati<strong>on</strong> of the system.<br />

2.6 To supply installati<strong>on</strong>, commissi<strong>on</strong>ing and O&M manuals and procedures, etc., in<br />

hard and soft form.<br />

2.7 To supply standard HOST/User Interface Software in ENGLISH, <strong>on</strong>e with each<br />

unit <strong>on</strong> a CD – ROM.<br />

2.8 The system interface shall also include required field cable, patch cable, patch<br />

box, associated accessories & hardware’s to c<strong>on</strong>nect to the GETCO system.<br />

2.9 Training to GETCO Engineers.<br />

3.0 SPECIFIC TECHNICAL REQUIREMENT:<br />

3.1 Intelligent Electr<strong>on</strong>ic Device (IED):<br />

The IEDs shall be suitable for outdoor heavily polluted atmosphere, ambient<br />

temperature of 50 o C and relative humidity of 100 % and shall have minimum<br />

degree of protecti<strong>on</strong> of IP-55. Necessary type test reports shall be submitted with<br />

the bid. Each IED shall be provided with additi<strong>on</strong>al canopy.<br />

The IED shall be suitable for mounting <strong>on</strong> offered transformer. The best single<br />

point of mounting locati<strong>on</strong> to ensure optimum flow of oil in the IED without any<br />

external / additi<strong>on</strong>al pump & piping shall be decided in co ordinati<strong>on</strong> with <strong>on</strong> <strong>line</strong><br />

moisture and gas in oil analyzer system manufacturer. The system shall operate<br />

satisfactorily for oil temperature range of -5 to 100 o C with heat fin adapter and<br />

shall be suitable for oil pressure of 100 psi. Provisi<strong>on</strong> shall be made available for<br />

Sign and Seal of Bidder Page 73 of 87

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!