04.01.2014 Views

220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board

220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board

220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GETCO/E/TS – XMER01power/R4 Sept <strong>08</strong><br />

or any c<strong>on</strong>nected equipment during installati<strong>on</strong> & commissi<strong>on</strong>ing full recovery therefore<br />

shall be effected from the C<strong>on</strong>tractor / Sub-C<strong>on</strong>tractor, of NIFPES system.<br />

It shall be solely the resp<strong>on</strong>sibility of C<strong>on</strong>tractor / Sub-C<strong>on</strong>tractor to install, carry out<br />

pre-commissi<strong>on</strong>ing tests & commissi<strong>on</strong> NIFPES at the menti<strong>on</strong>ed Sub-Stati<strong>on</strong> in this<br />

specificati<strong>on</strong>, to the entire satisfacti<strong>on</strong> of the GETCO.<br />

Interlocks<br />

It shall be ensured that <strong>on</strong>ce the NIFPES gets activated manually or in auto mode, all the<br />

c<strong>on</strong>nected breakers shall not close until the system is actually put in OFF mode. Also<br />

PRV shall get closed <strong>on</strong>ly if all the c<strong>on</strong>nected breakers are open.<br />

Sign and Seal of Bidder Page 83 of 87

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!