220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board
220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board
220-66-kv-xmer-on-line-nifes-r4-sept-08 - Gujarat Electricity Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
GETCO/E/TS – XMER01power/R4 Sept <strong>08</strong><br />
or any c<strong>on</strong>nected equipment during installati<strong>on</strong> & commissi<strong>on</strong>ing full recovery therefore<br />
shall be effected from the C<strong>on</strong>tractor / Sub-C<strong>on</strong>tractor, of NIFPES system.<br />
It shall be solely the resp<strong>on</strong>sibility of C<strong>on</strong>tractor / Sub-C<strong>on</strong>tractor to install, carry out<br />
pre-commissi<strong>on</strong>ing tests & commissi<strong>on</strong> NIFPES at the menti<strong>on</strong>ed Sub-Stati<strong>on</strong> in this<br />
specificati<strong>on</strong>, to the entire satisfacti<strong>on</strong> of the GETCO.<br />
Interlocks<br />
It shall be ensured that <strong>on</strong>ce the NIFPES gets activated manually or in auto mode, all the<br />
c<strong>on</strong>nected breakers shall not close until the system is actually put in OFF mode. Also<br />
PRV shall get closed <strong>on</strong>ly if all the c<strong>on</strong>nected breakers are open.<br />
Sign and Seal of Bidder Page 83 of 87