GETCO/E/TS – XMER01power/R4 Sept <strong>08</strong><br />

APPENDIX – B<br />

1.0 QUALIFICATION REQUIREMENTS FOR ERECTION, TESTING &<br />

COMMISSIONING<br />

1.1 The bidder should have carried out erecti<strong>on</strong>, testing, commissi<strong>on</strong>ing of<br />

and test charging of at least two nos. of <str<strong>on</strong>g>220</str<strong>on</strong>g> kV or above class<br />

transformers at <str<strong>on</strong>g>220</str<strong>on</strong>g> kV &/or 400 kV switch yard of sub stati<strong>on</strong>s<br />

satisfactory during last five years before date of submissi<strong>on</strong> of the bid.<br />

1.2 The bidder should arrange requisite tools and tackles including adequate<br />

capacity hydraulic crane having suitable adjustable boom length for<br />

erecti<strong>on</strong> of bushing, radiators, c<strong>on</strong>servator, and other associated costly<br />

equipments.<br />

1.3 The bidder should have team of trained pers<strong>on</strong>nel and skilled labour force<br />

and supervising engineers to carry out erecti<strong>on</strong>, commissi<strong>on</strong>ing, testing<br />

and test charging work including laying of c<strong>on</strong>trol cables and wiring of<br />

OLTC gear scheme and inter c<strong>on</strong>necti<strong>on</strong> of RTCC panel with D.M., of<br />

OLTC., wiring of cooler c<strong>on</strong>trol scheme and cooling fans including<br />

automatic operati<strong>on</strong> of cooler c<strong>on</strong>trol etc.<br />

2.0 ERECTION OF POWER TRANSFORMER<br />

2.1 Erecti<strong>on</strong> includes entire vacuum by proper capacity of vacuum pump, for<br />

not less than 48 hours, or more if required as per the instructi<strong>on</strong> of<br />

engineer in charge.<br />

2.2 Filling the oil from tank/drums to the transformer through 6000 ltrs.<br />

Capacity of high quality filter machine and filtrati<strong>on</strong> of the same to get<br />

desired BDV &PPM as specified by engineer in charge and<br />

transformer manual.<br />

2.3 C<strong>on</strong>tractor has to replace all the gaskets by new <strong>on</strong>es if required by<br />

engineer –in –charge.<br />

2.4 Erecti<strong>on</strong> shall include wiring of cooling fans, RTCC panels, terminati<strong>on</strong>s of<br />

alarm and trip c<strong>on</strong>tacts from buchholz relay, WTI, OTI, PRD to M.K. box<br />

and in turn to remote relay panel and RTCC panel in c<strong>on</strong>trol room.<br />

Required cabling <strong>on</strong> the transformer as well as from transformer to c<strong>on</strong>trol<br />

room shall also be included in scope of work. The testing and<br />

commissi<strong>on</strong>ing of OLTC as well as cooler c<strong>on</strong>trol scheme shall be carried<br />

out as per instructi<strong>on</strong> of engineer in charge.<br />

2.5 The c<strong>on</strong>tractor shall arrange nitrogen cylinder required at site for above<br />

work.<br />

2.6 In case of any breakage of any item, c<strong>on</strong>tractor has to follow up with<br />

insurance for the claims and amount for damage /breakage will be with<br />

held from c<strong>on</strong>tractor’s bill till the time claim is finalized by insurance<br />