Downtown Suffolk Revitalization Plan through Arts - College of ...
Downtown Suffolk Revitalization Plan through Arts - College of ...
Downtown Suffolk Revitalization Plan through Arts - College of ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
78<br />
Implementation: The Public Works department will complete this project<br />
within one year<br />
Strategy 3.6.2: The side parking lot owned by the Main Street United Methodist<br />
Church on 126 Bank Street will be upgraded.<br />
Implementation: The owner will upgrade this lot within two years.<br />
Strategy 3.6.3: The side parking lot on 225 East Washington Street will be<br />
upgraded.<br />
Implementation: The owner will upgrade this lot within two years.<br />
Strategy 3.6.4: The spaces along the southern rail lines will be paved and clearly<br />
marked to distinguish parking spaces from the street.<br />
Implementation: The city public works department and the <strong>Downtown</strong><br />
Development <strong>of</strong>fice will work with the owner to repave, curb, and stripe this parking<br />
area. 75% <strong>of</strong> the funds will come from the Public Works department while 25% from he<br />
owner. This project will be completed within in one year.<br />
Strategy 3.6.5: The rear parking lot on 110 Franklin St. will be upgraded.<br />
Implementation: The owner will upgrade this lot within two years.<br />
Upgraded Parking Facilities<br />
rket<br />
Saratoga<br />
N Main<br />
Washington