user's manual - Ana-Digi Systems
user's manual - Ana-Digi Systems
user's manual - Ana-Digi Systems
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CHAPTER 6 COMMUNICATION FUNCTION<br />
6.1.2 Operation procedure by high speed link<br />
• If master module is a product of LGIS (G3/4/6L-PUEA, G3/4/6L-PUEB), make a<br />
configuration of Pnet by using SyCon.<br />
• Download the Pnet Configuration by master module.<br />
• Set and download the high speed link parameter of master module in GMWIN/KGLWIN.<br />
• Set ‘high speed link allowable’.<br />
• If the product of other manufacturer is used as master, make a configuration of Pnet by using<br />
a Configuration Tool of the relevant product.<br />
• Set and download the high speed link parameter of slave module in GMWIN/KGLWIN.<br />
• Convert the operation mode to RUN.<br />
6.1.3 SyCon<br />
If you use the master module of LGIS (G3/4/6L-PUEA, G3/4/6L-PUEB), it is required to make a<br />
configuration of Pnet by using a SyCon and download that information to the relevant master<br />
module. As Pnet Configuration Tool is different per master module, if you use the master module of<br />
LGIS (G3/4/6L-PUEA, G3/4/6L-PUEB), you should use a SyCon.<br />
Execute a SyCon as shown on Figure 6.1.<br />
Figure 6.1 Execution of SyCon<br />
If there is no project used before, the screen like Figure 6.2 will appear. If you have been using the<br />
project already, the latest used project will appear.<br />
6-2