03.04.2014 Views

user's manual - Ana-Digi Systems

user's manual - Ana-Digi Systems

user's manual - Ana-Digi Systems

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CHAPTER 6 COMMUNICATION FUNCTION<br />

• Master module ‘high speed link 1’ setting completion screen<br />

Point<br />

Communication between LGIS Pnet I/F master and other manufacturer’s slave<br />

1) The basic communication method is the same as the communication example<br />

between LGIS and LGIS.<br />

2) Select the station of slave module as the external switch of other manufacturer’s<br />

slave module.<br />

3) When preparing GMWIN program, designate the I/O size of other manufacturer’s<br />

module when setting high speed link parameter.<br />

4) When opening the communication in SyCon, seek GSD file of other manufacturer’s<br />

module and designate it as slave, and match the station number designated by<br />

external switch of slave module with slave station number when S<br />

5) The size of I/O score in SyCon should be matched with GMWIN program<br />

high speed link parameter setting and size of GMWIN program.<br />

6) When using other manufacturer’s remote module, it is required to carry out by the<br />

same mode as the communication example between LGIS and LGIS, apply GSD<br />

file of the module used when created with SyCon, and designate the same I/O<br />

contact size of the used module for SyCon and GMWIN program.<br />

6-45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!