user's manual - Ana-Digi Systems
user's manual - Ana-Digi Systems
user's manual - Ana-Digi Systems
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CHAPTER 6 COMMUNICATION FUNCTION<br />
• Master module ‘high speed link 1’ setting completion screen<br />
Point<br />
Communication between LGIS Pnet I/F master and other manufacturer’s slave<br />
1) The basic communication method is the same as the communication example<br />
between LGIS and LGIS.<br />
2) Select the station of slave module as the external switch of other manufacturer’s<br />
slave module.<br />
3) When preparing GMWIN program, designate the I/O size of other manufacturer’s<br />
module when setting high speed link parameter.<br />
4) When opening the communication in SyCon, seek GSD file of other manufacturer’s<br />
module and designate it as slave, and match the station number designated by<br />
external switch of slave module with slave station number when S<br />
5) The size of I/O score in SyCon should be matched with GMWIN program<br />
high speed link parameter setting and size of GMWIN program.<br />
6) When using other manufacturer’s remote module, it is required to carry out by the<br />
same mode as the communication example between LGIS and LGIS, apply GSD<br />
file of the module used when created with SyCon, and designate the same I/O<br />
contact size of the used module for SyCon and GMWIN program.<br />
6-45