user's manual - Ana-Digi Systems
user's manual - Ana-Digi Systems
user's manual - Ana-Digi Systems
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CHAPTER 8 INSTALLATION AND STARTUP<br />
CHAPTER 8 INSTALLATION AND STARTUP<br />
8.1 Installation<br />
8.1.1 Notices in installation<br />
• It is available to install max. 4 Pnet communication module in GM1, GM2, GM3, K1000S PLC<br />
main base.<br />
• It is available to install max. 2 Pnet communication module in GM4, K300S PLC main base.<br />
(available to install max. 4 of GM4 CPUB type, max. 8 of GM4 CPUC type.)<br />
• It is available to install max. 2 Pnet communication module in GM6 PLC main base.<br />
• It is available to install max. 1 Pnet communication module in GM7, K80S, K120S PLC main<br />
base.<br />
1) Check the necessary basic elements for configuration and select the proper communication<br />
module.<br />
2) Select the cable to be used for communication module.<br />
3) When installing this communication module, check if there is a foreign material in the base<br />
connector to install or if the connector pin of module is damaged.<br />
4) This communication module should be installed in the base in the state that PLC power is not<br />
applied.<br />
5) All communication module can not be installed in the extended base and is required to select the<br />
slot position close to CPU in the main base to install.<br />
6) When installing this module, insert the protruded part of module in the base groove correctly in<br />
the state not connecting the communication cable and apply the sufficient force until the upper<br />
side is locked completely with lock device of the base. If the lock device is not locked, it may<br />
cause the error in the interface with CPU.<br />
8-1