03.04.2014 Views

user's manual - Ana-Digi Systems

user's manual - Ana-Digi Systems

user's manual - Ana-Digi Systems

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CHAPTER 8 INSTALLATION AND STARTUP<br />

CHAPTER 8 INSTALLATION AND STARTUP<br />

8.1 Installation<br />

8.1.1 Notices in installation<br />

• It is available to install max. 4 Pnet communication module in GM1, GM2, GM3, K1000S PLC<br />

main base.<br />

• It is available to install max. 2 Pnet communication module in GM4, K300S PLC main base.<br />

(available to install max. 4 of GM4 CPUB type, max. 8 of GM4 CPUC type.)<br />

• It is available to install max. 2 Pnet communication module in GM6 PLC main base.<br />

• It is available to install max. 1 Pnet communication module in GM7, K80S, K120S PLC main<br />

base.<br />

1) Check the necessary basic elements for configuration and select the proper communication<br />

module.<br />

2) Select the cable to be used for communication module.<br />

3) When installing this communication module, check if there is a foreign material in the base<br />

connector to install or if the connector pin of module is damaged.<br />

4) This communication module should be installed in the base in the state that PLC power is not<br />

applied.<br />

5) All communication module can not be installed in the extended base and is required to select the<br />

slot position close to CPU in the main base to install.<br />

6) When installing this module, insert the protruded part of module in the base groove correctly in<br />

the state not connecting the communication cable and apply the sufficient force until the upper<br />

side is locked completely with lock device of the base. If the lock device is not locked, it may<br />

cause the error in the interface with CPU.<br />

8-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!