18.06.2014 Views

IWMP-3 - Commissionerate of Rural Development Gujarat State ...

IWMP-3 - Commissionerate of Rural Development Gujarat State ...

IWMP-3 - Commissionerate of Rural Development Gujarat State ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DWDU, Rajkot<br />

• Introduction to the machinery and equipments used.<br />

• Dough making and the value addition in the form <strong>of</strong> flavour.<br />

• Bringing about variations in shapes and sizes.<br />

• Papad & Chips making – Practical<br />

• Drying and preservation<br />

• Cost considerations and waste reduction.<br />

• Pricing & packaging<br />

Production System-2: Dairy Buffalo Farming<br />

Estimated Project cost for Dairy Buffalo farming <strong>of</strong> one unit<br />

Farming is a complex, multi-component, interactive process that is dependant in land, animal, human and natural resources as well as<br />

capital investment. Sustainable agriculture embraces all such aspects <strong>of</strong> farming system. Small and marginal land holders can reap the<br />

benefit. In this context live stock is an important component.<br />

Dairy farming scheme can be taken up in the semi-urban, village and near highway villages, for the sake on transportation, breeding and<br />

marketing facilities. Since milk is an easily perishable item, it is to be immediately consumed or sold, so the farms needs to be located in<br />

the consuming centre itself. The scheme provides for purchase <strong>of</strong> one milch animal, construction <strong>of</strong> byre, feeding equipments and water<br />

tank. Cost <strong>of</strong> feed for one year and the insurance premium for the first year has also been capitalised. The recurring expenditures include<br />

cost <strong>of</strong> feed and medicines, water and electricity charges and insurance fees. The concentrated feeds will be supplemented with green<br />

grasses and fodder tree leaves.<br />

A. Non – Recurring Expenditure:<br />

1. Construction <strong>of</strong> Byre (Cowshed) and feed Godown @ 50 Sq.ft. floor / Buffalo @ Rs. 100 per Sq.ft : Rs. 10000.00<br />

2. Cost <strong>of</strong> Water Storage Tank L.S.: Rs. 2,000.00<br />

Detailed Project Report: <strong>IWMP</strong>-III 114

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!