18.06.2014 Views

IWMP-3 - Commissionerate of Rural Development Gujarat State ...

IWMP-3 - Commissionerate of Rural Development Gujarat State ...

IWMP-3 - Commissionerate of Rural Development Gujarat State ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DWDU, Rajkot<br />

Table no.36.2: Activities related to Surface water resources in Jangavad (all financial figures in lakh Rs.)<br />

Village<br />

Proposed target<br />

S.<br />

name<br />

Augmentation/ repair <strong>of</strong> existing<br />

No.<br />

Construction <strong>of</strong> new structures<br />

structures<br />

Type <strong>of</strong> structures<br />

No.<br />

Area to<br />

be<br />

irrigated<br />

(ha)<br />

Storage<br />

capacity<br />

(Cumec)<br />

Estimated<br />

cost<br />

(Lac)<br />

No.<br />

Area to<br />

be<br />

irrigated<br />

(ha)<br />

Storage<br />

Estimated<br />

capacity<br />

cost<br />

(Cumec)<br />

Area to<br />

be<br />

irrigated<br />

(ha)<br />

Total target<br />

Storage<br />

capacity<br />

(m 3 )<br />

Estimated<br />

cost<br />

(Lac)<br />

(i) Farm Pond 3 5.35 900 0.33 12 18.86 3240 1.32 24.21 4140 1.65<br />

(ii)Percolation Tank 3 76.42 10500 2.90 1 32.20 12100 4.96 108.62 22600 7.96<br />

1 Jangavad (iii) Check dam &<br />

Causeway cum 11 95.32 66500 8.01 32 224.32 140700 54.46 789.64 207200 62.47<br />

check dam<br />

Total 17 177.09 77900 11.24 45 275.38 156040 60.74 922.47 233940 72.08<br />

Table no.36.3: Activities related to Surface water resources in Jasapar (all financial figures in lakh Rs.)<br />

S. Village<br />

No. name<br />

Type <strong>of</strong> structures<br />

Augmentation/ repair <strong>of</strong> existing<br />

structures<br />

Area to<br />

Storage Estimated<br />

be<br />

No. capacity cost<br />

irrigated<br />

(Cumec) (Lac)<br />

(ha)<br />

Proposed target<br />

Construction <strong>of</strong> new structures<br />

No.<br />

Area to<br />

be<br />

irrigated<br />

(ha)<br />

Storage<br />

Estimated<br />

capacity<br />

cost<br />

(Cumec)<br />

Area to<br />

be<br />

irrigated<br />

(ha)<br />

Total target<br />

Storage<br />

capacity<br />

(m 3 )<br />

Estimated<br />

cost<br />

(Lac)<br />

(i) Farm Pond 2 10.08 1100 0.22 15 16.30 4050 1.65 23.38 5150 1.87<br />

1 Jasapar<br />

(ii)Irrigation/Percolation<br />

2<br />

Tank<br />

59.32 9500 2.36 1 29.36 3950 3.01 88.68 11650 5.37<br />

(iii) Check dam &<br />

Causeway cum check 5 149.54 7500 3.96 24 378.35 22800 38.90 727.89 30300 42.86<br />

dam<br />

Total 9 218.94 18100 6.54 40 422.01 25750 43.56 839.95 47100 50.10<br />

Detailed Project Report: <strong>IWMP</strong>-III 69

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!