- Page 1 and 2:
DWDU, Rajkot Detailed Project Repor
- Page 3 and 4:
DWDU, Rajkot 3.1. Geography and Geo
- Page 5 and 6:
DWDU, Rajkot Table no. 31.3: Waters
- Page 7 and 8:
DWDU, Rajkot Table No 40.1: Technic
- Page 9 and 10:
DWDU, Rajkot Table no.46: Informati
- Page 11 and 12:
DWDU, Rajkot CHAPTER - 1 PROJECT BA
- Page 13 and 14:
DWDU, Rajkot 1.2 Need of Watershed
- Page 15 and 16:
DWDU, Rajkot been developed/ treate
- Page 17 and 18:
DWDU, Rajkot Table no.4: Developmen
- Page 19 and 20:
DWDU, Rajkot Table no. 5: Previous
- Page 21 and 22:
DWDU, Rajkot 2.1 Project Implementi
- Page 23 and 24:
DWDU, Rajkot 2.3 SWOT Analysis of t
- Page 25 and 26:
DWDU, Rajkot CHAPTER - 3 Basic Info
- Page 27 and 28:
DWDU, Rajkot has increased the vuln
- Page 29 and 30: DWDU, Rajkot The project area is co
- Page 31 and 32: DWDU, Rajkot 3.2.1 Irrigation The i
- Page 33 and 34: DWDU, Rajkot management. Quality o
- Page 35 and 36: DWDU, Rajkot Table no. 20: Details
- Page 37 and 38: DWDU, Rajkot Table no. 23: Migratio
- Page 39 and 40: DWDU, Rajkot Table no. 27: Per capi
- Page 41 and 42: DWDU, Rajkot Watershed Activities W
- Page 43 and 44: DWDU, Rajkot b) Field to field Surv
- Page 45 and 46: DWDU, Rajkot High school was also d
- Page 47 and 48: DWDU, Rajkot been promoted at vario
- Page 49 and 50: DWDU, Rajkot Yes (B) Inputs Yes 1.
- Page 51 and 52: DWDU, Rajkot Table no. 31.2: Waters
- Page 53 and 54: DWDU, Rajkot Table no. 31.4: Waters
- Page 55 and 56: DWDU, Rajkot iii) User Group: These
- Page 57 and 58: DWDU, Rajkot Table no. 33. 3 : UG d
- Page 59 and 60: DWDU, Rajkot Table No. 34.1: Some o
- Page 61 and 62: DWDU, Rajkot Table No. 34.3: Some o
- Page 63 and 64: DWDU, Rajkot 1. Contour Bunds/Trenc
- Page 65 and 66: DWDU, Rajkot 4.3.2.2 Drainage line
- Page 67 and 68: DWDU, Rajkot between June and Septe
- Page 69 and 70: DWDU, Rajkot Table no.36.2: Activit
- Page 71 and 72: DWDU, Rajkot Table no.37: Activitie
- Page 73 and 74: DWDU, Rajkot 3 Jangavad 4 Jasapar V
- Page 75 and 76: DWDU, Rajkot Table no. 40.i: Detail
- Page 77 and 78: DWDU, Rajkot Table no. 40.iii: Deta
- Page 79: DWDU, Rajkot Cost Estimate For Boul
- Page 83 and 84: DWDU, Rajkot Table No 40.4: Technic
- Page 85 and 86: DWDU, Rajkot Table no 40.7. Technic
- Page 87 and 88: DWDU, Rajkot 4 1:2:4 4.1 Body wall
- Page 89 and 90: DWDU, Rajkot 1.8 50.00 90.00 Total
- Page 91 and 92: DWDU, Rajkot Table no.41.1: Details
- Page 93 and 94: DWDU, Rajkot Table no.41.3: Details
- Page 95 and 96: DWDU, Rajkot Bio-Gas The idea is to
- Page 97 and 98: DWDU, Rajkot Feeder Tank 610mm LINE
- Page 99 and 100: DWDU, Rajkot These are the major co
- Page 101 and 102: DWDU, Rajkot programme, veterinary
- Page 103 and 104: DWDU, Rajkot Table no.42.1: Details
- Page 105 and 106: DWDU, Rajkot Table no.42.2: Details
- Page 107 and 108: DWDU, Rajkot Livelihood Interventio
- Page 109 and 110: DWDU, Rajkot The selected productio
- Page 111 and 112: DWDU, Rajkot Process flow chart of
- Page 113 and 114: DWDU, Rajkot 7 Others 100.00 Total
- Page 115 and 116: DWDU, Rajkot 3. Cost of equipments
- Page 117 and 118: DWDU, Rajkot 7. Sale of Manure : Rs
- Page 119 and 120: DWDU, Rajkot Feasibility of Fodder
- Page 121 and 122: DWDU, Rajkot Table no: 42.ii: Cost
- Page 123 and 124: DWDU, Rajkot Production System - 5:
- Page 125 and 126: DWDU, Rajkot Land About 750 square
- Page 127 and 128: DWDU, Rajkot Table No-42.v: Returns
- Page 129 and 130: DWDU, Rajkot 5. Productions 6. Acco
- Page 131 and 132:
DWDU, Rajkot Production System - 7:
- Page 133 and 134:
DWDU, Rajkot Production System - 7:
- Page 135 and 136:
DWDU, Rajkot Activity Flow Chart -
- Page 137 and 138:
DWDU, Rajkot Hand harvesting Manual
- Page 139 and 140:
DWDU, Rajkot Cost Benefit ratio of
- Page 141 and 142:
DWDU, Rajkot Time of sowing: Roses
- Page 143 and 144:
DWDU, Rajkot Waste land/Pasture Fod
- Page 145 and 146:
DWDU, Rajkot Table no. 45: Capacity
- Page 147 and 148:
DWDU, Rajkot Budgeting Table no. 47
- Page 149 and 150:
DWDU, Rajkot Table no.50: Details o
- Page 151 and 152:
DWDU, Rajkot 6.1 Expected Outcomes
- Page 153 and 154:
DWDU, Rajkot 6.1.4: Drinking water
- Page 155 and 156:
DWDU, Rajkot 6.1.7 Vegetative cover
- Page 157 and 158:
DWDU, Rajkot Agro and other Industr
- Page 159 and 160:
DWDU, Rajkot 1.4 Measurement Book 1
- Page 161 and 162:
DWDU, Rajkot Objective 4 To increas
- Page 163 and 164:
DWDU, Rajkot CHAPTER - 7 QUALITY AN
- Page 165 and 166:
DWDU, Rajkot Vigilance and Monitori
- Page 167 and 168:
DWDU, Rajkot Plans For Project mana
- Page 169 and 170:
DWDU, Rajkot CHAPTER - 8 MAPS Detai
- Page 171 and 172:
DWDU, Rajkot Detailed Project Repor
- Page 173 and 174:
DWDU, Rajkot Detailed Project Repor
- Page 175 and 176:
DWDU, Rajkot Detailed Project Repor
- Page 177 and 178:
DWDU, Rajkot Detailed Project Repor
- Page 179 and 180:
DWDU, Rajkot Detailed Project Repor