IWMP-3 - Commissionerate of Rural Development Gujarat State ...
IWMP-3 - Commissionerate of Rural Development Gujarat State ...
IWMP-3 - Commissionerate of Rural Development Gujarat State ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
DWDU, Rajkot<br />
Machinery<br />
Farm machinery and implements are required for cutting the raw material in small pieces, conveying shredded raw material to the vermisheds,<br />
loading, unloading, collection <strong>of</strong> compost, loosening <strong>of</strong> beds for aeration, shifting <strong>of</strong> the compost. Costs <strong>of</strong> providing necessary<br />
implements and the machinery have to be included in the project cost.<br />
Table: 42.iv Model <strong>of</strong> a Vermi-compost Unit for 40 beds <strong>of</strong> Dimension (10mt*1mt*0.3mt)<br />
S. No Particulars Quantity Rate (Rs.) Amount (Rs.)<br />
1 Super Structure construction with truss with fencing 128750<br />
2 Shade net for covering the ro<strong>of</strong> 750 sqrt mt. 25 18750<br />
3 Binding wire for tying 200 Kg 50 10000<br />
4 Labour charges for erection <strong>of</strong> sheds 100 100 10000<br />
5 Shovels, spades, crowbars, iron baskets etc 15000<br />
6 Weighing scale (100 kg capacity) 1 2500 2500<br />
7 Cow dung @ 80kg/m3 96 qtl 250 24000<br />
8 Worms 200 kg 70 14000<br />
9 Formation <strong>of</strong> vermin bed with agro-waste, cow dung and worms 50000<br />
10 Miscellaneous - - 3000<br />
11 Training 5000<br />
12 Total cost - - Rs. 281000<br />
Detailed Project Report: <strong>IWMP</strong>-III 126