IWMP-3 - Commissionerate of Rural Development Gujarat State ...
IWMP-3 - Commissionerate of Rural Development Gujarat State ...
IWMP-3 - Commissionerate of Rural Development Gujarat State ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
DWDU, Rajkot<br />
Land<br />
About 750 square meter <strong>of</strong> land is required to set up a vermi compost production unit in each village. It should have at least one super<br />
structure to cover the 40 beds. It should have an arrangement for watering and other equipments as required because moisture is very<br />
essential for compost production. Land can be taken from Gram panchayat on lease <strong>of</strong> at least 10-15 years.<br />
Seed Stock<br />
This is very important thing because worms multiply at the rate <strong>of</strong> 350 worms per m 3 <strong>of</strong> bed space over a period <strong>of</strong> 6 month to a year.<br />
Fencing<br />
The entire area has to be fenced to prevent the stray animals and other unwanted elements. These could be estimated based on the length<br />
<strong>of</strong> the periphery <strong>of</strong> the farm.<br />
Water Supply System<br />
We have to maintain always 50% moisture content, there is need to plan for a water source, lifting mechanism and a system <strong>of</strong> conveying<br />
and applying the water to vermi-beds. Drippers with round the clock flow arrangement would be quite handy for continuous supply and<br />
saving on water. Such a water supply/application system requiring considerable initial investment, however, reduces the operational costs<br />
on hand watering and proves economical in the long run. The cost <strong>of</strong> these items depends on the capacity <strong>of</strong> the unit and the type <strong>of</strong> water<br />
supply chosen.<br />
Detailed Project Report: <strong>IWMP</strong>-III 125