1.3 Other projects/scheme running in the project villages<br />

(1) MGNREGS: Pond deepening and widening <strong>of</strong> road works completed in Kharachiya Jam, desilting <strong>of</strong> percolation tank in<br />

Panchavda, construction <strong>of</strong> road and desilting <strong>of</strong> thee check dams with a cost <strong>of</strong> 7.6 lakh and in Jasapar desilting <strong>of</strong> percolation tank<br />

with cost <strong>of</strong> 2.10 lakha has been completed till date.<br />

(2) Prehariyali/ Hariyali watershed programme: Under the EAS and DDP project, total area <strong>of</strong> 2500 ha in total project area have<br />

been treated where all activities related to soil and water conservation measures have been taken care. Two solar street-lamps<br />

installed so far under DDP to promote non conventional source <strong>of</strong> energy in each village.<br />

(3) Total Sanitation Campaign (TSC): 360 individual toilets in the project villages and two public toilets in Kharachiya and Jangvad<br />

,has been constructed under TSC programme in the project area. All the remaining house hold will be covered under this scheme.<br />

(4) Indira Awas Yojana: Total 113 house has been constructed in the four villages (13 in Kharachiya Jam, 23 in Pachavda, 31 in<br />

Jangvad and 46 in Jasapar ) under IAY.<br />

(5) SAY: 6 nos <strong>of</strong> beneficiaries have been benefitted with a house under Sardar Awas yojana.<br />

(6) WASMO/Sector reform: In the project villages 75 % <strong>of</strong> the houses get water by tap connection under WASMO programme.<br />

(7) GGY: All the villagers have been benefitted under this programme where new rooms in school, cement concrete road in market,<br />

community hall and renovation <strong>of</strong> bus stop work has been taken.<br />

Detailed Project Report: <strong>IWMP</strong>-III 16