VTS Manual - Belfast Harbour
VTS Manual - Belfast Harbour
VTS Manual - Belfast Harbour
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Section: 6 Rev No. 02<br />
Title: Watch Keeping Responsibilities Issue No. a<br />
6.6.1 Routine<br />
As soon as practicable after the beginning of each watch:<br />
<br />
<br />
<br />
<br />
Perform checks on each main and backup VHF transmitter/receiver frequency<br />
for signal strength and modulation.<br />
Check workstation lighting.<br />
Check the electronic logging system.<br />
Check the VTMIS.<br />
6.6.2 Special Check<br />
If at any time the electronic equipment controlled by the centre is believed to be<br />
malfunctioning or below standard, conduct a special equipment check. The results of<br />
this check shall be logged and reported to maintenance staff if the equipment is not<br />
operating to required specifications.<br />
6.6.3 Navigation aid check<br />
All navigation aids (buoys) in the vicinity of the Port Control Centre shall have their<br />
status monitored either continuously or at prescribed times.<br />
PCOs are required to forward any information regarding Navigations Aids to HM and<br />
Civil Works Department.<br />
6.6.4 Time Check<br />
Clocks in the Port Control Centre shall be checked and synchronized if necessary at<br />
the beginning of each watch.<br />
Any adjustments made shall be recorded in the log.<br />
6.7 Equipment Shutdowns<br />
Ensure that all equipment associated with workstation meets the operational<br />
requirements or is reported to maintenance staff.<br />
Date: 18.08.2008 Page: 6-3<br />
Doc: <strong>VTS</strong> <strong>Manual</strong>