DEVELOPERS’ PROCEDURES<br />

CHAPTER TWO<br />

b. <strong>Water</strong> treatment plant facilities (new, modifications, or<br />

expansions),<br />

c. Raw water intake structures,<br />

d. Chemical treatment of any type,<br />

e. Any bottled water source <strong>and</strong>/or distributor,<br />

f. Elevated storage facilities, or<br />

g. Any new technology.<br />

3. <strong>Sewer</strong> projects that qualify for the Delegated Review program are<br />

as follows:<br />

a. All gravity sewer line extensions for 16 inch diameter lines<br />

or smaller.<br />

b. All pump station projects with a design size of 2,000 GPM<br />

or smaller.<br />

In the event the <strong>Authority</strong> is not to operate <strong>and</strong> maintain a<br />

sewer system, e.g. pump station/force main, then the<br />

<strong>developer</strong> is required to provide the <strong>Authority</strong> a<br />

certification as to who is to have operational <strong>and</strong><br />

maintenance responsibility for the system.<br />

c. All 16 inch diameter or smaller force mains.<br />

4. The DRP program does not include the following sewer projects.<br />

a. pressure sewers<br />

b. STEP systems<br />

c. small diameter sewer systems<br />

d. wastewater treatment facilities (New modifications or<br />

expansions)<br />

e. effluent outfall construction (gravity, force main or pump<br />

stations) from wastewater treatment facilities.<br />

Incomplete submittals will delay processing of the project. Please ensure<br />

that the submittal package contains all required items in the necessary<br />

quantity. The Delegated Review Program is only for the issuance of the<br />

SCDHEC permit to construct. Final operating approval must be issued by<br />

the Region 6, Myrtle Beach District Office prior to the project being<br />

placed into operation.<br />

Developers’ Procedures July 2009 <strong>Gr<strong>and</strong></strong> <strong>Str<strong>and</strong></strong> <strong>Water</strong> <strong>and</strong> <strong>Sewer</strong> <strong>Authority</strong><br />

Page 12<br />

Developer Policy Manual

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!