SERVICE AUTHORIZATION AND FINAL ACCEPTANCE<br />
CHAPTER FOUR<br />
Department. No work orders to install water meters nor inspect sewer<br />
connections will be issued without service authorization.<br />
Engineer<br />
1. The engineer's construction certification <strong>and</strong> test results. Test results<br />
must include two (2) consecutive satisfactory bacteriological samples<br />
from a DHEC approved testing lab.<br />
2. An executed <strong>Authority</strong> Certificate of Non-Litigation form. Should the<br />
<strong>developer</strong> not be able to provide the Non-Litigation Form, then a Hold<br />
Harmless Agreement or Cash Bond will be required<br />
3. Letter of approval from SC DOT <strong>and</strong>/or Horry County Public Works for<br />
work performed under encroachment permit.<br />
4. Certified cost of the water system <strong>and</strong> certified cost of the sewer system<br />
with quantities of new service lift stations to be itemized separately, i.e.<br />
fence, wetwell, pumps, <strong>and</strong> electrical/control panel.<br />
5. Contractor's one year guarantee on materials <strong>and</strong> workmanship.<br />
6. The Department of Health & Environmental Control's Approval to Place<br />
into Operation for the project.<br />
<strong>Authority</strong>:<br />
1. Project As-Builts approved by the GSWSA Project Inspector.<br />
2. Satisfactory confirmation bacteriological sample result report from the<br />
<strong>Authority</strong>'s <strong>Water</strong> Operations Department for the water system<br />
constructed.<br />
3. The <strong>Authority</strong>’s inspector report indicating all punch list items noted<br />
during the final inspection have been corrected, or if the system is<br />
approved conditioned upon the posting of a maintenance bond.<br />
Developer:<br />
1. Properly executed deed conveying the water <strong>and</strong>/or sewer system(s) as<br />
constructed to the <strong>Authority</strong> along with partial release of mortgage (as<br />
applicable).<br />
Service Authorization <strong>and</strong> Final Acceptance July 2009 <strong>Gr<strong>and</strong></strong> <strong>Str<strong>and</strong></strong> <strong>Water</strong> <strong>and</strong> <strong>Sewer</strong> <strong>Authority</strong><br />
Page 34<br />
Developer Policy Manual