developer policy manual - Grand Strand Water and Sewer Authority
developer policy manual - Grand Strand Water and Sewer Authority
developer policy manual - Grand Strand Water and Sewer Authority
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
____________________________________________________________________<br />
____________________________________________________________________<br />
9. A. WATER AND SEWER EXTENSION REQUIRED: ___YES, ____NO<br />
B. WATER ONLY ___YES, ____NO<br />
C. SEWER ONLY ___YES, ____NO<br />
10. CONSTRUCTION SCHEDULE:<br />
A. Anticipated Start Date: ___________________________________<br />
B Anticipated Completion Date:______________________________<br />
C. If project is to be phased, please list below the number of units to be<br />
constructed for each phase <strong>and</strong> dates planned for the start <strong>and</strong> completion<br />
of each phase.<br />
ADDITIONAL NOTES:<br />
_____________________________________________________________________<br />
_____________________________________________________________________<br />
_____________________________________________________________________<br />
_____________________________________________________________________<br />
11. Signature of <strong>developer</strong>/authorized agent<br />
_________________________________________________________________<br />
Date:____________________________________________________________<br />
Appendices July 2009 <strong>Gr<strong>and</strong></strong> <strong>Str<strong>and</strong></strong> <strong>Water</strong> <strong>and</strong> <strong>Sewer</strong> <strong>Authority</strong><br />
Page 40<br />
Developer Policy Manual