03.11.2014 Views

developer policy manual - Grand Strand Water and Sewer Authority

developer policy manual - Grand Strand Water and Sewer Authority

developer policy manual - Grand Strand Water and Sewer Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

____________________________________________________________________<br />

____________________________________________________________________<br />

9. A. WATER AND SEWER EXTENSION REQUIRED: ___YES, ____NO<br />

B. WATER ONLY ___YES, ____NO<br />

C. SEWER ONLY ___YES, ____NO<br />

10. CONSTRUCTION SCHEDULE:<br />

A. Anticipated Start Date: ___________________________________<br />

B Anticipated Completion Date:______________________________<br />

C. If project is to be phased, please list below the number of units to be<br />

constructed for each phase <strong>and</strong> dates planned for the start <strong>and</strong> completion<br />

of each phase.<br />

ADDITIONAL NOTES:<br />

_____________________________________________________________________<br />

_____________________________________________________________________<br />

_____________________________________________________________________<br />

_____________________________________________________________________<br />

11. Signature of <strong>developer</strong>/authorized agent<br />

_________________________________________________________________<br />

Date:____________________________________________________________<br />

Appendices July 2009 <strong>Gr<strong>and</strong></strong> <strong>Str<strong>and</strong></strong> <strong>Water</strong> <strong>and</strong> <strong>Sewer</strong> <strong>Authority</strong><br />

Page 40<br />

Developer Policy Manual

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!