CONSTRUCTION PROCEDURES<br />

CHAPTER THREE<br />

3.2.2 Wet Taps<br />

Where the extension of a water main or force main is necessary, the<br />

<strong>Authority</strong> shall make all wet taps unless conditions warrant a waiver of<br />

this requirement by the <strong>Authority</strong>. If the <strong>Authority</strong> elects to allow a<br />

contractor to make a wet tap, the contractor shall coordinate the tap with<br />

the <strong>Authority</strong> for an acceptable time <strong>and</strong> assignment of an inspector to<br />

monitor the tapping procedure.<br />

3.2.3 ACCESS<br />

The <strong>Authority</strong> shall have access to the project premises during reasonable<br />

hours to perform inspections to ensure compliance with construction<br />

requirements.<br />

3.2.4 SEWER EXTENSIONS<br />

Extensions from existing manholes must be performed in the presence of<br />

an <strong>Authority</strong> inspector. Upon completion of the first section of gravity<br />

sewer, the contractor is required to plug the extension. The plug is not to<br />

be removed until service authorization is given. Failure to meet this<br />

provision violates Section 11 of Act 337 of the Acts <strong>and</strong> Joint Resolutions<br />

of the State of South Carolina of 1971, therefore, making the contractor<br />

subject to fines <strong>and</strong>/or imprisonment.<br />

3.2.5 CONSTRUCTION OF A MANHOLE OVER EXISTING GRAVITY<br />

SEWER LINES<br />

Manholes shall be constructed in the presence of the <strong>Authority</strong>'s inspector.<br />

Any manhole constructed on an existing line must be approved by an<br />

<strong>Authority</strong> inspector prior to cutting into the existing operational sewer<br />

line.<br />

3.2.6 FORCE MAIN TIE INS<br />

All tie-ins of force mains into existing manholes must be done in the<br />

presence of an <strong>Authority</strong> inspector.<br />

3.3 WATER USE POLICY<br />

3.3.1 CONSTRUCTION WATER<br />

Filling <strong>and</strong> flushing of new water mains consumes large quantities of nonmetered<br />

water over the period of system construction. The methods for<br />

contractors utilizing water for construction purposes <strong>and</strong> coordination with<br />

<strong>Authority</strong> personnel are the responsibility of the contractor.<br />

Construction Procedures July 2009 <strong>Gr<strong>and</strong></strong> <strong>Str<strong>and</strong></strong> <strong>Water</strong> <strong>and</strong> <strong>Sewer</strong> <strong>Authority</strong><br />

Page 18<br />