developer policy manual - Grand Strand Water and Sewer Authority
developer policy manual - Grand Strand Water and Sewer Authority
developer policy manual - Grand Strand Water and Sewer Authority
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
underst<strong>and</strong> that the <strong>Authority</strong> reserves the right to withhold or to<br />
discontinue service whenever any such adverse action is used or any<br />
deviation of <strong>Authority</strong> <strong>policy</strong> is discovered.<br />
E. Requirements: I agree that I will meet all requirements as defined in the<br />
<strong>Gr<strong>and</strong></strong> <strong>Str<strong>and</strong></strong> <strong>Water</strong> & <strong>Sewer</strong> <strong>Authority</strong> Policy Manuals <strong>and</strong> that I will<br />
deed free <strong>and</strong> clear legal title for all facilities <strong>and</strong> real property required<br />
utility service to the <strong>Gr<strong>and</strong></strong> <strong>Str<strong>and</strong></strong> <strong>Water</strong> & <strong>Sewer</strong> <strong>Authority</strong>. I underst<strong>and</strong><br />
the <strong>Authority</strong> shall assume responsibility for the operation <strong>and</strong><br />
maintenance of those facilities only upon final acceptance by the<br />
<strong>Authority</strong>.<br />
F. Contractor of Record: I will provide <strong>Gr<strong>and</strong></strong> <strong>Str<strong>and</strong></strong> <strong>Water</strong> <strong>and</strong> <strong>Sewer</strong><br />
<strong>Authority</strong> the contractor of record prior to the pre-construction meeting. I<br />
will notify <strong>Gr<strong>and</strong></strong> <strong>Str<strong>and</strong></strong> <strong>Water</strong> <strong>and</strong> <strong>Sewer</strong> <strong>Authority</strong> of any changes made<br />
in the contractor of record during construction.<br />
G. Installation Changes: I agree not to make any alterations or<br />
modifications which will materially affect the proper operation of the<br />
pipes, mains, or stations of the <strong>Authority</strong> unless given prior written<br />
consent by the <strong>Authority</strong>.<br />
H. Parking/Paved Areas: I agree that, should I choose to locate parking or<br />
paved areas over utility lines <strong>and</strong>/or easements granted to <strong>Gr<strong>and</strong></strong> <strong>Str<strong>and</strong></strong><br />
<strong>Water</strong> & <strong>Sewer</strong> <strong>Authority</strong>, <strong>and</strong> in the event repairs maintenance<br />
necessitates the excavation of such utility lines, I or my assigns shall be<br />
responsible for pavement restoration <strong>and</strong> further hold <strong>Gr<strong>and</strong></strong> <strong>Str<strong>and</strong></strong> <strong>Water</strong><br />
& <strong>Sewer</strong> <strong>Authority</strong> harmless for such restoration. This does not apply to<br />
public roads or streets.<br />
I. Final Inspection: I agree that <strong>Gr<strong>and</strong></strong> <strong>Str<strong>and</strong></strong> <strong>Water</strong> <strong>and</strong> <strong>Sewer</strong> <strong>Authority</strong><br />
has the right to withhold a final inspection of the water <strong>and</strong> sewer lines<br />
until all other utility lines have been installed.<br />
J. Accessibility: I underst<strong>and</strong> <strong>and</strong> agree that permanent <strong>and</strong> adequate access<br />
must be made available to the water <strong>and</strong>/or sewer systems at all times so<br />
that GSWSA personnel can perform necessary functions for the operation,<br />
maintenance, repair, <strong>and</strong> replacement of the water <strong>and</strong> sewer utilities to<br />
ensure the successful operation of these systems.<br />
Appendices July 2009 <strong>Gr<strong>and</strong></strong> <strong>Str<strong>and</strong></strong> <strong>Water</strong> <strong>and</strong> <strong>Sewer</strong> <strong>Authority</strong><br />
Page 50<br />
Developer Policy Manual