SERVICE AUTHORIZATION AND FINAL ACCEPTANCE<br />

CHAPTER FOUR<br />

CHAPTER 4<br />

SERVICE AUTHORIZATION AND FINAL ACCEPTANCE<br />

4.1 FINAL AS-BUILTS<br />

4.1.1 GENERAL<br />

A field survey will be performed <strong>and</strong> drawings will be created showing all<br />

items that will be transferred to the <strong>Authority</strong>. This field survey will be<br />

based on the SC Grid Coordinate System (NAD ’83) <strong>and</strong> the construction<br />

drawings will be modified to reflect the field as-built survey. This field<br />

survey can be performed by GPS to “Mapping Grade” st<strong>and</strong>ards (1-meter<br />

±). All “survey” points shall become a part of the as-built CAD file (on a<br />

separate layer or level) (See Section 4.1.4).<br />

As-built drawings should be produced in a clear <strong>and</strong> legible manner. Only<br />

information pertinent to the water <strong>and</strong>/or sewer systems facilities being<br />

dedicated to the <strong>Authority</strong> should be shown. No reference shall be made<br />

to any future or proposed facilities. The information noted below is<br />

required to be on all as-builts submitted to the <strong>Authority</strong> for approval:<br />

1. Project name, location, parent tax map number, <strong>and</strong> adjacent<br />

property owners.<br />

2. Delineation of project boundaries.<br />

3. All lot <strong>and</strong>/or building numbers. Tax map number of all<br />

subdivided lots.<br />

4. North arrow, vicinity/location map.<br />

5. Name of <strong>developer</strong>, engineer, <strong>and</strong> contractor with each group’s<br />

associated information (i.e. address, telephone number).<br />

6. Title block must contain: project name, as-built preparer’s<br />

information (i.e. address, telephone number), graphic scale, date of<br />

as-built <strong>and</strong> latest revision description/date (if applicable).<br />

7. Sheet number in consecutive order. <strong>Water</strong> as-built drawings must<br />

precede sewer as-built drawings.<br />

8. All street/road names <strong>and</strong> road/highway numbers.<br />

<strong>Gr<strong>and</strong></strong> <strong>Str<strong>and</strong></strong> <strong>Water</strong> <strong>and</strong> <strong>Sewer</strong> <strong>Authority</strong> July 2009 Service Authorization <strong>and</strong> Final Acceptance<br />

Developer Policy Manual Page 25