03.11.2014 Views

developer policy manual - Grand Strand Water and Sewer Authority

developer policy manual - Grand Strand Water and Sewer Authority

developer policy manual - Grand Strand Water and Sewer Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SERVICE AUTHORIZATION AND FINAL ACCEPTANCE<br />

CHAPTER FOUR<br />

on, lag pump on, lead pump on, pump off, pump model,<br />

pump impeller, discharge pipe size, check valve size, plug<br />

valve size, design flow, design head (TDH), voltage, phase,<br />

horsepower, <strong>and</strong> rpm (pump/motor).<br />

e. Relevant construction <strong>and</strong> component details.<br />

f. When more than one sheet is required, items (a), (b), (c),<br />

<strong>and</strong> (d) shall appear on the same sheet.<br />

NOTE: CAD drawings that may be modified by the<br />

engineer to fit his particular project are available from<br />

GSWSA upon request.<br />

12. The following certification statement must appear on all as-built<br />

drawings <strong>and</strong> shall be signed by the engineer <strong>and</strong> show his<br />

registration number: I hereby certify that the sewer utilities as<br />

shown have been installed in accordance with the approved<br />

construction drawings <strong>and</strong> specifications <strong>and</strong> are, to the best of my<br />

knowledge, as shown on these plans.<br />

________________________________<br />

Engineer<br />

Date<br />

________________________________<br />

Registration Number<br />

4.1.4 FINAL AS-BUILT DIGITAL DATA SUBMISSION<br />

In addition to the mylar drawings, the engineer shall provide all drawings<br />

in CAD form showing facilities that are dedicated to GSWSA. The CAD<br />

files submitted shall be identical to those plotted in mylar form, except for<br />

signatures <strong>and</strong> seals placed by h<strong>and</strong>. <strong>Water</strong> <strong>and</strong> sewer services shall be<br />

located <strong>and</strong> South Carolina coordinate value (to the nearest foot) shall be<br />

shown. Overall project boundary (new plan, PUD, boundary survey, etc.)<br />

is required in CAD form upon submission of the first phase in multi-phase<br />

projects. All drawing elements shall be submitted referencing South<br />

Carolina State Plane (SCSP) Coordinates. Features in drawing files that<br />

are stored in drawing units must be translated to represent real world<br />

locations as referenced by SCSP coordinates. As specified in the SC Code<br />

of Laws Chapter 2, Title 27 (The South Carolina Coordinate Act, amended<br />

31 Mar89), elements referencing SCSP (formally identified as the South<br />

Carolina Coordinate System) will utilize the North American Datum of<br />

1983-1986 Adjustment (NAD83 [1986]) for horizontal control <strong>and</strong> be<br />

measured in International Feet (not US Survey Foot). Vertical control will<br />

reference the North America Vertical Datum of 1988 (NAVD88) <strong>and</strong> shall<br />

include measures using the US Survey Foot. The SCSP system includes a<br />

Service Authorization <strong>and</strong> Final Acceptance July 2009 <strong>Gr<strong>and</strong></strong> <strong>Str<strong>and</strong></strong> <strong>Water</strong> <strong>and</strong> <strong>Sewer</strong> <strong>Authority</strong><br />

Page 30<br />

Developer Policy Manual

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!