Xstrata Copper North Queensland.pdf - Mount Isa Mines
Xstrata Copper North Queensland.pdf - Mount Isa Mines
Xstrata Copper North Queensland.pdf - Mount Isa Mines
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Environmental performance<br />
Recycled water is pumped to a spraying unit<br />
to suppress dust on the Run Of Mine (ROM)<br />
pad at Ernest Henry Mining<br />
The Division’s energy consumption by source<br />
can be found in the table below.<br />
Energy intensity was 29 gigajoules (GJ) per<br />
tonne of contained metal in 2010 consistent<br />
with the result achieved in 2009.<br />
Energy Efficiency<br />
Opportunities Program<br />
<strong>Xstrata</strong> Holdings Pty Ltd is a participant in the<br />
Australian Government’s Energy Efficiency<br />
Opportunities (EEO) Program. Participants are<br />
required to assess their operations for energy<br />
saving opportunities and to publicly report on<br />
initiatives where the payback period for an<br />
initiative is less than four years.<br />
The report for the 2009–10 reporting period,<br />
including details of the <strong>Xstrata</strong> <strong>Copper</strong><br />
<strong>North</strong> <strong>Queensland</strong> Division’s EEO initiatives,<br />
is located on the <strong>Xstrata</strong> <strong>Mount</strong> <strong>Isa</strong> <strong>Mines</strong><br />
website at www.mountisamines.com.au.<br />
As part of the 2010 EEO program, we<br />
continued to engage the workforce in<br />
identifying and evaluating energy saving<br />
opportunities. <strong>Xstrata</strong> <strong>Copper</strong>’s north<br />
<strong>Queensland</strong> operations have identified<br />
a number of energy saving initiatives.<br />
These include the Parkside Solar Project<br />
at <strong>Mount</strong> <strong>Isa</strong> (see case study on page 85),<br />
diesel fuel filtering at Ernest Henry Mining<br />
and the optimisation of ventilation and<br />
refrigeration systems servicing underground<br />
copper mining at <strong>Mount</strong> <strong>Isa</strong> <strong>Mines</strong>. Details on<br />
each of these are included in the EEO public<br />
report referenced above. Work will continue<br />
to evaluate and develop business cases for<br />
cost effective and technically feasible EEO<br />
opportunities in 2011.<br />
Energy use by source (GJ) – <strong>Xstrata</strong> <strong>Copper</strong> <strong>North</strong> <strong>Queensland</strong><br />
Consumption 2010<br />
Direct<br />
Coal 318,700<br />
Coke 22,800<br />
Diesel 2,264,000<br />
Natural gas 2,655,800*<br />
Other sources (other energy sources such as LPG, petrol, and oils and greases) 121,200<br />
Indirect<br />
Electricity 3,049,500<br />
Total 8,431,900<br />
* The increase in natural gas use from the figure reported in 2009 (1.4 million GJ) is a result of the 2010 figure<br />
now including the gas used to generate electricity on site. Prior to 2010, only the natural gas used in the<br />
processes (i.e. the smelters) was included in the reported figure.<br />
Carbon intensity –<br />
<strong>Xstrata</strong> <strong>Copper</strong> <strong>North</strong> <strong>Queensland</strong>^<br />
tonnes CO 2 -e per tonne contained metal<br />
6<br />
Energy use –<br />
<strong>Xstrata</strong> <strong>Copper</strong> <strong>North</strong> <strong>Queensland</strong>^<br />
‘000s GJ<br />
12,000<br />
Energy intensity –<br />
<strong>Xstrata</strong> <strong>Copper</strong> <strong>North</strong> <strong>Queensland</strong>^<br />
GJ per tonne contained metal<br />
60<br />
5<br />
4<br />
10,000<br />
8,000<br />
7,400<br />
7,300<br />
8,100<br />
7,900<br />
8,400<br />
50<br />
40<br />
3.2<br />
3.0<br />
2.9<br />
2.9<br />
3.0<br />
3.0<br />
30<br />
29<br />
29<br />
29<br />
29<br />
3<br />
6,000<br />
30<br />
27<br />
2<br />
4,000<br />
20<br />
1<br />
2,000<br />
10<br />
0<br />
2006 2007 2008 2009 2010 2011*<br />
0<br />
2006 2007 2008 2009 2010<br />
0<br />
2006 2007 2008 2009 2010 2011*<br />
*Target<br />
*Target<br />
^ 2007–09 figures have been restated to account for a<br />
change in the reporting methodology related to the<br />
on-site generation of electricity.<br />
Sustainability Report 2010 81