KRECOMMENDATIONS<br />

<strong>SUNY</strong> <strong>Cobleskill</strong> Facilities Master Plan – Phase 5 Report<br />

November 2011<br />

<strong>SUNY</strong> <strong>Cobleskill</strong> Students<br />

RECOMMENDED STUDIES<br />

In addition to the following initiatives concerning facilities and campus<br />

open space, the FMP recommends a number of technical, programming<br />

and additional studies.<br />

•<br />

•<br />

Programming Studies<br />

• School of Business<br />

• Culinary Arts<br />

• Social Sciences<br />

• Student & Community Center<br />

• Library<br />

• Student Life<br />

Technical Studies<br />

• Analyze and redesign the campus signal conduit and<br />

manhole system<br />

• Assess the cost and risk of implementing VoIP (Voiceover-IP)<br />

• Assess the eletrical distribution system to determine<br />

longevity and develop an approach to switchover the<br />

system from 5kV to 13.8kV<br />

The FMP also recommends the investigation of existing technology<br />

infrastructure, including:<br />

•<br />

•<br />

Documenting all existing Wireless Access Point [WAP] locations<br />

on campus<br />

Evaluating the current level of cooling available to all existing<br />

BDF and IDF rooms to determine if PoE enabled switches can be<br />

properly supported<br />