<strong>SUNY</strong> <strong>Cobleskill</strong> Facilities Master Plan – Phase 5 Report<br />
November 2011<br />
RECOMMENDATIONS<br />
K<br />
ACADEMIC (FARM) INITIATIVES<br />
Bouck Hall<br />
1H PROVIDE NEW EQUINE ARENA<br />
For equestrian use, a covered arena is provided to replace the covered<br />
ring at the lower facility. The new Equine Arena will be located adjacent<br />
to the existing Arena Center.<br />
1I PROVIDE NEW COVERALL STRUCTURE WITH ROUND PENS<br />
For equestrian use, a simple steel-frame with stretched fabric coverall<br />
structure is provided adjacent to the existing Horse Stalls (Hangar<br />
Building). Two round pens accompanied by observation areas (for up to<br />
25 people) are also provided.<br />
1M PROVIDE NEW CLASS LAB FACILITY AT LOWER QUAD<br />
To support farm and livestock-related instruction, a new classroom facility<br />
to accommodate up to 24 students is provided at the lower facility near<br />
the Equine Training Center. The facility will also include offices, storage<br />
space, and toilets. The classroom will be equipped with a garage door to<br />
the exterior to accommodate large animals. Durable interior finishes will<br />
allow the classroom to be “sprayed down” as needed.<br />
1N REPLACE EXISTING HAY STORAGE STRUCTURE<br />
A simple steel frame structure is provided for hay storage.<br />
1J NOT USED<br />
1K PROVIDE EXERCISER FACILITY FOR EQUINE USE<br />
Located adjacent to the existing Arena Center, a new covered exerciser<br />
(60’ diameter) is provided for equestrian use.<br />
1O PROVIDE NEW LIVESTOCK BUILDING TO REPLACE FARM/HORT.<br />
MACHINERY STRUCTURE<br />
This initiative provides a new livestock building near the new livestock<br />
class lab facility (1M) to replace the existing Farm/Horticulture Machinery<br />
building that will be demolished with the construction of the new student<br />
dormitories adjacent to Curtis Mott.<br />
1L RENOVATE HORSE STALLS (HANGAR BUILDING)<br />
The final FMP proposes to renovate the existing Horse Stalls (Hangar<br />
Building) and repurpose a portion of the space to support phantom/<br />
breeding activities for equestrian instruction.<br />