19.11.2014 Views

Part 5: Final Recommendation - SUNY Cobleskill

Part 5: Final Recommendation - SUNY Cobleskill

Part 5: Final Recommendation - SUNY Cobleskill

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>SUNY</strong> <strong>Cobleskill</strong> Facilities Master Plan – Phase 5 Report<br />

November 2011<br />

RECOMMENDATIONS<br />

K<br />

ACADEMIC (FARM) INITIATIVES<br />

Bouck Hall<br />

1H PROVIDE NEW EQUINE ARENA<br />

For equestrian use, a covered arena is provided to replace the covered<br />

ring at the lower facility. The new Equine Arena will be located adjacent<br />

to the existing Arena Center.<br />

1I PROVIDE NEW COVERALL STRUCTURE WITH ROUND PENS<br />

For equestrian use, a simple steel-frame with stretched fabric coverall<br />

structure is provided adjacent to the existing Horse Stalls (Hangar<br />

Building). Two round pens accompanied by observation areas (for up to<br />

25 people) are also provided.<br />

1M PROVIDE NEW CLASS LAB FACILITY AT LOWER QUAD<br />

To support farm and livestock-related instruction, a new classroom facility<br />

to accommodate up to 24 students is provided at the lower facility near<br />

the Equine Training Center. The facility will also include offices, storage<br />

space, and toilets. The classroom will be equipped with a garage door to<br />

the exterior to accommodate large animals. Durable interior finishes will<br />

allow the classroom to be “sprayed down” as needed.<br />

1N REPLACE EXISTING HAY STORAGE STRUCTURE<br />

A simple steel frame structure is provided for hay storage.<br />

1J NOT USED<br />

1K PROVIDE EXERCISER FACILITY FOR EQUINE USE<br />

Located adjacent to the existing Arena Center, a new covered exerciser<br />

(60’ diameter) is provided for equestrian use.<br />

1O PROVIDE NEW LIVESTOCK BUILDING TO REPLACE FARM/HORT.<br />

MACHINERY STRUCTURE<br />

This initiative provides a new livestock building near the new livestock<br />

class lab facility (1M) to replace the existing Farm/Horticulture Machinery<br />

building that will be demolished with the construction of the new student<br />

dormitories adjacent to Curtis Mott.<br />

1L RENOVATE HORSE STALLS (HANGAR BUILDING)<br />

The final FMP proposes to renovate the existing Horse Stalls (Hangar<br />

Building) and repurpose a portion of the space to support phantom/<br />

breeding activities for equestrian instruction.<br />

49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!