Part 5: Final Recommendation - SUNY Cobleskill
Part 5: Final Recommendation - SUNY Cobleskill
Part 5: Final Recommendation - SUNY Cobleskill
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
KRECOMMENDATIONS<br />
<strong>SUNY</strong> <strong>Cobleskill</strong> Facilities Master Plan – Phase 5 Report<br />
November 2011<br />
GROUP 2 – SHARED INITIATIVES<br />
2A RENOVATE AND CONTEMPORIZE BOUCK HALL<br />
As part of the final FMP, Bouck Hall receives low- and medium-level<br />
renovations of its health and physical education spaces (with the exception<br />
of the gymnasium), athletic support spaces, and theater. Basement space<br />
in Bouck is repurposed to support campus printing services.<br />
•<br />
•<br />
•<br />
Repurposing of “multi-purpose” room as recreation space for<br />
intramural sports<br />
Addition of new enclosed glass pedestrian gallery<br />
Construction of skylights to allow natural light into the building<br />
This initiative includes:<br />
• Replacement of building mechanical systems<br />
• Refreshment of interior finishes<br />
• Repurposing of space on the basement floor to support printing<br />
services<br />
The new addition will be a striking 18’ -high enclosed glass gallery with new<br />
escalators and refurbished elevators. The pedestrian gallery will laminate<br />
the northwest face of Bouck Hall, defining one edge of the Middle Quad.<br />
In addition to providing new student activity and collaboration space,<br />
the gallery will provide climatized, ADA-compliant access across a major<br />
portion of the campus.<br />
Rendering of Middle<br />
Quad and new glass front of<br />
Bouck Gallery Addition<br />
50