19.11.2014 Views

Part 5: Final Recommendation - SUNY Cobleskill

Part 5: Final Recommendation - SUNY Cobleskill

Part 5: Final Recommendation - SUNY Cobleskill

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BUILDINGS-ST<br />

KRECOMMENDATIONS<br />

<strong>SUNY</strong> <strong>Cobleskill</strong> Facilities Master Plan – Phase 5 Report<br />

November 2011<br />

COLOR BY ACCO<br />

CUSTODIAL S<br />

CUSTODIAL S<br />

1G RENOVATE WARNER-HOLMES TO SUPPORT NEW AND EXISTING<br />

PROGRAMS<br />

HUMANITIES<br />

IT<br />

SOCIAL SCIEN<br />

Graphic K22<br />

Warner-Holmes per FMP -<br />

Lower Floor<br />

General Instruction<br />

School of Arts & Science<br />

School of Business<br />

School of Agriculture &<br />

Natural Resources<br />

President<br />

Institutional Advancement<br />

Administration<br />

Academic Affairs<br />

Student Affairs<br />

Library & Information Services<br />

Other<br />

Outline of Existing Building<br />

Outline of New Construction<br />

ALBANY AVE<br />

Warner-Holmes<br />

Warner-Holmes is comprised of two separate structures that are connected<br />

on the second level by an enclosed elevated walkway. The building is<br />

largely made up of Campus IT and the School of Business on one side, and<br />

Early Childhood Education on the other. While the building is generally<br />

General suitable Instruction for its purpose, it is in need of a medium-level renovation. The<br />

final FMP proposes a medium-level renovation of Warner-Holmes with<br />

School of Arts & Science<br />

the building being devoted primarily to Early Childhood Education and<br />

School of Business<br />

Humanities/Social Sciences. Other programmatic changes include:<br />

School of Agriculture &<br />

Natural Resources<br />

President • Computer Technology instruction relocated to Alumni Hall<br />

Institutional • Advancement International Education located in Warner-Holmes<br />

Administration • Satellite café with double-height space added to Warner-<br />

Academic Affairs Holmes<br />

Student Affairs<br />

Table K8<br />

Library & Information Services<br />

No. 005 Warner-Holmes<br />

Other<br />

2009 Per FMP<br />

Outline of Existing Building<br />

33,070 nasf 32,166 nasf<br />

Outline Campus of New IT Construction<br />

5,709 nasf 5,709 nasf<br />

School of Arts & Sciences 9,398 nasf 22,097 nasf<br />

Early Childhood Education 8,877 nasf 8,413 nasf<br />

Humanities 521 nasf 8,286 nasf<br />

Social Sciences 0 nasf 5,398 nasf<br />

School of Business 3,993 nasf 0 nasf<br />

Business & Accounting (to Home Ec) 1,657 nasf 0 nasf<br />

Computer Technology (to Alumni) 2,336 nasf 0 nasf<br />

Dean’s Office (to Home Ec) 744 nasf 0 nasf<br />

General Instruction 11,962 nasf 2,220 nasf<br />

Collaboration 0 nasf 432 nasf<br />

Food Service 950 nasf 1,708 nasf<br />

Other/Unassigned 1,058 nasf 0 nasf<br />

General instruction<br />

classrooms<br />

Existing egress stair<br />

Building entrance<br />

General instruction<br />

classrooms<br />

Existing main server<br />

location to remain<br />

ITS<br />

New toilets<br />

L00<br />

(HOLMES HALL)<br />

Building entrance<br />

Existing stair<br />

Existing elevator to be<br />

refurbished<br />

Campus Information<br />

Technology Services (ITS) to<br />

remain, with appropriate<br />

equipment upgrades<br />

Wieting<br />

Van<br />

Wagenen<br />

Frisbie<br />

46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!