KRECOMMENDATIONS<br />
<strong>SUNY</strong> <strong>Cobleskill</strong> Facilities Master Plan – Phase 5 Report<br />
November 2011<br />
4M IMPROVE OPEN SPACE QUALITY BY PROVIDING NEW LIBRARY<br />
PLAZA<br />
4O IMPROVE OPEN SPACE QUALITY AND ACCESSIBILITY BY CREATING<br />
LANDSCAPED COLLEGE YARD<br />
4R PROVIDE ADDITIONAL GRAZING AND CROP LAND<br />
Graphic K40<br />
Library Plaza<br />
(at left)<br />
Graphic K41<br />
College Yard (at center)<br />
This initiative provides an allowance for the acquisition of approximately<br />
200-acres to support the School of Agriculture & Natural Resources. It is<br />
expected that the majority of this land will be for the production of livestock<br />
feed. Some of this need, however, is for additional pasture land in order for<br />
the College to meet confined animal feed operation [CAFO] guidelines.<br />
Such additional pasture acreage does not need to be contiguous and<br />
the College will support animal transport to non-contiguous locations.<br />
While the FMP only provided an allowance for 200-acres at the College’s<br />
request, the need is far in excess and the College could realistically utilize<br />
over 450-acres of additional land should funding become available.<br />
4S RECONSTRUCT PARKING LOT AT NEW EQUINE ARENA<br />
The final FMP proposes a new landscaped plaza adjacent to Van Wagenen<br />
Library. This initiative includes:<br />
•<br />
•<br />
•<br />
New plaza with walkways and ADA ramps<br />
Street furniture and lighting<br />
Plantings<br />
This initiative provides a landscaped open space at the south end of the<br />
campus, between the new Student & Community Center and the F-Lot. The<br />
new College Yard will include paved walkways, plantings, and lighting,<br />
and will serve as an open space for the nearby dormitories. It will also<br />
create an attractive entrance to the Student & Community Center from the<br />
F-Lot parking area.<br />
The final FMP proposes a new Equestrian Arena to be located on the site<br />
of an existing parking lot (1I); this initiative provides a replacement for the<br />
existing parking lot.<br />
4T CONSTRUCT NEW PARKING LOT AT UPPER EQUINE FACILITY<br />
This initiative provides a new parking lot for trailers and RVs at the upper<br />
equine facility, adjacent to the existing Horse Stalls (Hangar Building).<br />
4N RECONSTRUCT SERVICE COMPLEX PARKING AND IMPROVE<br />
ADJACENT OPEN SPACE<br />
The aim of this initiative is to improve the parking lot, paving, and open<br />
spaces adjacent to the Mackey Service Complex.<br />
4P UPGRADE EXISTING WALKWAYS CAMPUS-WIDE<br />
This initiative provides an allowance for the demolition and replacement<br />
of sidewalks campus-wide to improve pedestrian circulation and ADA<br />
accessibility. Lighting and minor plantings are also included.<br />
4U PROVIDE STAIRWAY AND PEDESTRIAN CONNECTION FROM<br />
BOUCK HALL TO NEW FIELDHOUSE<br />
This initiative provides a new staircase between Bouck Hall and the<br />
Fieldhouse.<br />
4Q PROVIDE TREE BUFFER ALONG ROUTE 7<br />
This initiative provides an allowance to plant trees along the east side of<br />
Route 7.<br />
4V UPGRADE PARKING LOTS CAMPUS-WIDE<br />
This initiative provides an allowance to replace and repair existing parking<br />
lots throughout the campus.<br />
66