Building automation â impact on energy efficiency - Siemens ...
Building automation â impact on energy efficiency - Siemens ...
Building automation â impact on energy efficiency - Siemens ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Project workflow<br />
<str<strong>on</strong>g>Building</str<strong>on</strong>g> owner / operator<br />
Declarati<strong>on</strong> of intent C<strong>on</strong>tract signing C<strong>on</strong>tract c<strong>on</strong>firmati<strong>on</strong> /<br />
signing<br />
Change in use, c<strong>on</strong>sumpti<strong>on</strong>,<br />
accounting, c<strong>on</strong>clusi<strong>on</strong><br />
Rough analysis Detailed analysis Executi<strong>on</strong><br />
Guarantee<br />
phase<br />
Pre-study<br />
Engineering, assembly,<br />
adjustments,<br />
Detailed study project management<br />
<strong>Siemens</strong> BT<br />
Savings guarantee,<br />
c<strong>on</strong>trol, service, m<strong>on</strong>itoring<br />
Together with us, the customer defines the project workflow. After determining<br />
the suitable buildings, we estimate the savings potential in a pre-study. A detailed<br />
study clarifies the potential, determines measures and calculates the ec<strong>on</strong>omic<br />
viability. After the performance c<strong>on</strong>tract is signed, we commence with<br />
planning, delivery and installati<strong>on</strong>. Securing the <strong>efficiency</strong> guarantee begins as<br />
so<strong>on</strong> as the project is completed, in other words ensuring guaranteed savings.<br />
Regular reports <strong>on</strong> achieved savings are provided during this phase.<br />
123