20.11.2014 Views

Building automation – impact on energy efficiency - Siemens ...

Building automation – impact on energy efficiency - Siemens ...

Building automation – impact on energy efficiency - Siemens ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project workflow<br />

<str<strong>on</strong>g>Building</str<strong>on</strong>g> owner / operator<br />

Declarati<strong>on</strong> of intent C<strong>on</strong>tract signing C<strong>on</strong>tract c<strong>on</strong>firmati<strong>on</strong> /<br />

signing<br />

Change in use, c<strong>on</strong>sumpti<strong>on</strong>,<br />

accounting, c<strong>on</strong>clusi<strong>on</strong><br />

Rough analysis Detailed analysis Executi<strong>on</strong><br />

Guarantee<br />

phase<br />

Pre-study<br />

Engineering, assembly,<br />

adjustments,<br />

Detailed study project management<br />

<strong>Siemens</strong> BT<br />

Savings guarantee,<br />

c<strong>on</strong>trol, service, m<strong>on</strong>itoring<br />

Together with us, the customer defines the project workflow. After determining<br />

the suitable buildings, we estimate the savings potential in a pre-study. A detailed<br />

study clarifies the potential, determines measures and calculates the ec<strong>on</strong>omic<br />

viability. After the performance c<strong>on</strong>tract is signed, we commence with<br />

planning, delivery and installati<strong>on</strong>. Securing the <strong>efficiency</strong> guarantee begins as<br />

so<strong>on</strong> as the project is completed, in other words ensuring guaranteed savings.<br />

Regular reports <strong>on</strong> achieved savings are provided during this phase.<br />

123

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!