24.12.2014 Views

200 - Typhoon Committee

200 - Typhoon Committee

200 - Typhoon Committee

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ESCAP/WMO<br />

<strong>Typhoon</strong> <strong>Committee</strong> Annual Review <strong>200</strong>7<br />

• 1 staff from NHMS attended the WMO’s Training course<br />

on Tropical storms’ damage reduction in China from 26<br />

to 31 March <strong>200</strong>6.<br />

• 1 staff from NHMS attended the Training program on<br />

Disaster Prevention and Preparedness in Taiwan from 5<br />

– 11 May, <strong>200</strong>7.<br />

• 1 staff from NHMS attended Climate Prediction and<br />

application in Asia -Pacific at Singapore, from 21 to 31<br />

May <strong>200</strong>7.<br />

• 2 staffs from NHMS attended Integrated Workshop<br />

on Social – Economic Impacts of Extreme <strong>Typhoon</strong> –<br />

related Events in Thailand from 10 – 14 Sep <strong>200</strong>7.<br />

• 1 staff from NHMS attended to work on the project<br />

“Using ensemble prediction system (EPS) information in<br />

tropical cyclone forecasting: under the fellowship scheme<br />

in Hong Kong Observatory from Sep to Nov <strong>200</strong>7.<br />

• 3 staffs attended The <strong>Typhoon</strong> <strong>Committee</strong> Roving<br />

Seminar <strong>200</strong>7: Doppler radar analysis (rain and wind),<br />

Satellite Analysis (Quikscat and Microwave Imageries),<br />

Interaction of Tropical Cyclones with Monsoon Systems<br />

in Philippines from 5 – 8 Sep <strong>200</strong>7<br />

• Research Progress: NIL<br />

• Other Cooperative Progress: NIL<br />

2. Progress in Member’s Important, High-<br />

Priority Goals and Objectives<br />

a. Hardware and Software Progress<br />

a.1 Observation network<br />

• Complement 47 Young wind measurement for coastal<br />

and island stations.<br />

• Installed 3 barometers for island stations<br />

Mean Error (km)<br />

24h 48h<br />

DPE 135.4 281.2<br />

No.Cases 128 53<br />

• Add 11 flow measurements for 11 stations in the whole<br />

country<br />

a.2 Software for interactive operational forecasting<br />

• The GEMPAK/N-AWIPS package from UNIDATA/UCAR<br />

has been installed, studied and undergone the adaptation<br />

to be used with the data feed from local sources at<br />

NCHMF.<br />

• New tropical storms forecast supporting software,<br />

TCAids, was designed and installed for operational<br />

works.<br />

100

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!