24.12.2014 Views

200 - Typhoon Committee

200 - Typhoon Committee

200 - Typhoon Committee

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TCAR<br />

CHAPTER 1 - TYPHOON COMMITTEE ACTIVITIES <strong>200</strong>7<br />

<strong>200</strong>7<br />

Hydrological model for Ca River in the Central Viet Nam Hydraulic model for lower Red River<br />

1 Employ the MARINE and FIRR models to forecast flow in upstream area of Da, Thao, Lo rivers,<br />

Reservoir Flood Routing model for reservoir’s regulation in Da river and create the input for the Hydraulic<br />

model TL2 in lower stream of Red river.<br />

2 Developing the TANK Model for flood forecasting with lead time 120h and time step of 6h since<br />

flood season of <strong>200</strong>5<br />

149

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!