24.12.2014 Views

200 - Typhoon Committee

200 - Typhoon Committee

200 - Typhoon Committee

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ESCAP/WMO<br />

<strong>Typhoon</strong> <strong>Committee</strong> Annual Review <strong>200</strong>7<br />

for flood forecasting with lead time 120h<br />

1<br />

2<br />

Developing MIKE-11 Model for flow forecasting with lead time 48h in the lower Red river.<br />

Developing the HydroGIS model for flood forecasting with lead time 5 days in lower Mekong River.<br />

150

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!