24.12.2014 Views

200 - Typhoon Committee

200 - Typhoon Committee

200 - Typhoon Committee

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ESCAP/WMO<br />

<strong>Typhoon</strong> <strong>Committee</strong> Annual Review <strong>200</strong>7<br />

hydrological data, quality management system, and<br />

improvement of the related technology.<br />

In the quality control system, it is impossible to construct<br />

the fully perfect automatic system by mathematical<br />

algorithms or methods. Although the fully perfect<br />

automatic system is constructed, it can be undesirable<br />

because this system can not treat all outlier data.<br />

Therefore, it is required that quality control system should<br />

include the manual procedure and treatment procedure.<br />

Also, before the construction of the system, all guideline<br />

which deals with outlier data and its treatment procedure<br />

should be determined. Figure 2.2 shows the procedure<br />

of quality control system. Figure 2.3 and 2.4 represents<br />

graphic user interface of the quality system for rainfall<br />

data and stage data.<br />

It is very important to confirm and check out the<br />

hydrological data because the hydrological data have<br />

many margins occurred error caused by environmental<br />

change in the field, miss-operation of observation<br />

instrument, mistake of person observing in field and any<br />

other factor. Therefore observed record(original data)<br />

that is acquired from field observation, magnetic record,<br />

data logger, telemeter and so on must be confirmed and<br />

checked out to use it.<br />

Figure 2.2 Procedure of quality control system Figure 2.3 Quality control of rainfall data Figure 2.4 Quality control of<br />

stage data<br />

132

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!