07.01.2015 Views

Guidelines for the use of GNSS in surveying and mapping

Guidelines for the use of GNSS in surveying and mapping

Guidelines for the use of GNSS in surveying and mapping

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

values with <strong>the</strong>ir computed precision. It is best<br />

practice to carry out network adjustments <strong>in</strong><br />

ITRS89 be<strong>for</strong>e any co-ord<strong>in</strong>ate trans<strong>for</strong>mations are<br />

made.<br />

7.5.8 Key parameters <strong>for</strong> report<strong>in</strong>g<br />

There will be a host <strong>of</strong> statistical tests <strong>and</strong> quality<br />

control parameters presented by <strong>the</strong> s<strong>of</strong>tware<br />

throughout <strong>the</strong> adjustment process: st<strong>and</strong>ard<br />

deviations <strong>of</strong> adjusted co-ord<strong>in</strong>ates, station error<br />

ellipses, RMS figures, covariant values, histograms<br />

<strong>and</strong> observation residuals. From <strong>the</strong>se, it is<br />

recommended that <strong>the</strong> most important quality<br />

control parameters extracted are <strong>the</strong> station error<br />

ellipses at <strong>the</strong> 95 per cent confidence level (check<br />

<strong>the</strong> sigma values given by <strong>the</strong> s<strong>of</strong>tware) <strong>and</strong> <strong>the</strong><br />

weight<strong>in</strong>g strategy applied. These should be<br />

presented <strong>in</strong> <strong>the</strong> report <strong>in</strong> <strong>the</strong> follow<strong>in</strong>g ways.<br />

For each adjustment:<br />

+ <strong>the</strong> weight<strong>in</strong>g strategy adopted <strong>in</strong>clud<strong>in</strong>g <strong>the</strong> a<br />

priori st<strong>and</strong>ard errors <strong>use</strong>d<br />

+ <strong>the</strong> overall unit variance <strong>for</strong> <strong>the</strong> network (which<br />

should be approximately equal to one).<br />

For each station (given <strong>in</strong> <strong>the</strong> ITRS89 co-ord<strong>in</strong>ate<br />

system):<br />

+ latitude <strong>and</strong> <strong>the</strong> 95 per cent confidence value<br />

+ longitude <strong>and</strong> <strong>the</strong> 95 per cent confidence value<br />

+ ellipsoid height <strong>and</strong> <strong>the</strong> 95 per cent confidence<br />

value.<br />

The manufacturer, type <strong>and</strong> version number <strong>of</strong> <strong>the</strong><br />

network adjustment s<strong>of</strong>tware should also be given<br />

<strong>in</strong> <strong>the</strong> f<strong>in</strong>al survey report.<br />

7.5.9 Post-processed D<strong>GNSS</strong> surveys<br />

The quality control measures outl<strong>in</strong>ed above <strong>in</strong><br />

section 7.3.3 <strong>for</strong> real-time D<strong>GNSS</strong> surveys should<br />

also be computed <strong>for</strong> any post-processed surveys.<br />

Reference should aga<strong>in</strong> be made to <strong>the</strong> IMCA<br />

publication <strong>Guidel<strong>in</strong>es</strong> <strong>for</strong> <strong>the</strong> <strong>use</strong> <strong>of</strong> differential<br />

<strong>GNSS</strong> <strong>in</strong> <strong>of</strong>fshore survey<strong>in</strong>g (www.imca-<strong>in</strong>t.com/<br />

divisions/mar<strong>in</strong>e/publications/199.html). It is<br />

recommended that if post-processed <strong>and</strong> real-time<br />

data is to be comb<strong>in</strong>ed <strong>in</strong> a particular project, some<br />

check po<strong>in</strong>ts are taken <strong>in</strong> both <strong>the</strong> real-time as well<br />

as post-processed modes.<br />

7.5.10 Co-ord<strong>in</strong>ate trans<strong>for</strong>mations <strong>and</strong><br />

projections<br />

Trans<strong>for</strong>mation <strong>of</strong> <strong>the</strong> co-ord<strong>in</strong>ates from <strong>the</strong><br />

network adjustment can also be carried out almost<br />

automatically with<strong>in</strong> <strong>the</strong> same s<strong>of</strong>tware suite or it<br />

may be undertaken manually <strong>in</strong> a completely<br />

different manufacturer’s s<strong>of</strong>tware package. There<br />

are no real statistical confidence values that can be<br />

determ<strong>in</strong>ed from trans<strong>for</strong>mation <strong>of</strong> co-ord<strong>in</strong>ates, as<br />

<strong>of</strong>ten <strong>the</strong> trans<strong>for</strong>mation is a simple ma<strong>the</strong>matical<br />

function; from one ellipsoid def<strong>in</strong>ition to ano<strong>the</strong>r,<br />

<strong>and</strong> <strong>the</strong>nce to a def<strong>in</strong>ed projection <strong>and</strong> local grid.<br />

There<strong>for</strong>e, when trans<strong>for</strong>m<strong>in</strong>g <strong>GNSS</strong> results from<br />

<strong>the</strong> network adjustment, <strong>the</strong> follow<strong>in</strong>g quality<br />

control parameters should be supplied <strong>in</strong> <strong>the</strong><br />

survey report:<br />

+ trans<strong>for</strong>mation technique <strong>use</strong>d (Moledensky,<br />

Helmert, MRE – see section 6)<br />

+ numerical def<strong>in</strong>ition <strong>of</strong> <strong>the</strong> new <strong>and</strong> ITRS89<br />

ellipsoids<br />

+ actual values <strong>of</strong> trans<strong>for</strong>mation parameters<br />

<strong>use</strong>d<br />

+ source <strong>of</strong> trans<strong>for</strong>mation parameters, e.g.<br />

NIMA, self-generated, national mapp<strong>in</strong>g agency<br />

+ accuracy <strong>of</strong> trans<strong>for</strong>mation parameters (see<br />

section 6)<br />

+ projection technique <strong>use</strong>d <strong>and</strong> <strong>the</strong> numeric<br />

def<strong>in</strong>ition <strong>of</strong> <strong>the</strong> projection<br />

+ manufacturer, type <strong>and</strong> version <strong>of</strong> s<strong>of</strong>tware<br />

+ new co-ord<strong>in</strong>ates <strong>and</strong> f<strong>in</strong>al accuracy values <strong>in</strong><br />

local datum or projection.<br />

7.5.11 Data management<br />

All recorded data should be compatible with<br />

National Spatial Data Infrastructures (NSDIs).<br />

New co-ord<strong>in</strong>ates <strong>and</strong> f<strong>in</strong>al accuracy values <strong>in</strong> local<br />

datum or projection should be managed <strong>and</strong><br />

ma<strong>in</strong>ta<strong>in</strong>ed by surveyors <strong>in</strong> support <strong>of</strong> NSDI<br />

<strong>in</strong>itiatives.<br />

58 | GUIDELINES FOR THE USE OF <strong>GNSS</strong> IN LAND SURVEYING AND MAPPING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!