page 7<br />

Mock Bedroom and<br />

Operating Theatre<br />

The construction of a mock bedroom and<br />

operating theatre was a unique opportunity for<br />

staff members to have a good look and to see<br />

and touch the real life layout, including fittings<br />

and furnishings of the single, inpatient rooms<br />

with ensuites and theatre units to be included in<br />

the redevelopment.<br />

The staff that will be working in these rooms had<br />

Fletcher Construction<br />

Announced as Main<br />

Contractor<br />

Fletcher Construction has been announced<br />

as the preferred main contractor for Project<br />

Maunga.<br />

“It’s really exciting to be able to announce<br />

another major milestone allowing us to<br />

progress according to our timeline,” said<br />

Tony Foulkes.<br />

“Having completed the building design,<br />

the hard work will continue over the next<br />

two years as we re-design our services to<br />

get the maximum benefit for our patients”.<br />

input that was vital to the design phase. Allied<br />

<strong>Health</strong> members were able to test equipment in<br />

the room, and the Ambulance Service brought<br />

in stretchers. The Community Advisory Groups,<br />

Disability and Older Person’s Group also offered<br />

their feedback on the room and an open day<br />

for the public was held.<br />

Positive feedback and suggestions for<br />

improvement were well received by the<br />

Project Maunga team with some valuable<br />

changes being made to the final design.<br />

Releasing Time to Care<br />

The DHB has adopted this process to<br />

ensure that Project Maunga is not just<br />

about a new building but also about a<br />

new way of doing things.<br />

The programme is based on the lean<br />

thinking concept and aims to free up<br />

time in our nurses’ day so they can<br />

increase the amount of time they have<br />

for direct patient care and improve the<br />

safety, reliability and efficiency of the care<br />

delivered to the patient.