<strong>EBN</strong> <strong>Notional</strong> <strong>Field</strong> <strong>Development</strong> Plan<br />

4.2.6.3 Procedure and authority<br />

The ‘All-In-One’ permit must be submitted to the Minister of Economic Affairs, Agriculture, and<br />

Innovation. Both with and without the application of the NCR, the permit is prepared with the uniform<br />

public preparation procedure of Section 3.4 of the General Administrative Law. This means a draft of<br />

the environmental permit should be made available for public review and the Minister shall grant or<br />

reject the application within six months (+ one extension of six weeks).<br />

Where the NCR is applicable, an appeal of the final decision should be made through the Department of<br />

Administrative Law at the Council of State. Where the NCR is not applicable, first appeal has to be<br />

brought before court, administrative law, and after that, it is possible to appeal to the Department.<br />

4.2.7 Water Act<br />

The Water Act (WA) is formed by the integration of eight historic water laws. The main purpose of the<br />

WA is the instrumentation of integrated water management. The WA covers quality and quantity of<br />

surface water, groundwater and the protection of water management works, such as dams.<br />