<strong>EBN</strong> <strong>Notional</strong> <strong>Field</strong> <strong>Development</strong> Plan<br />

o de Zoom and de Bleekloop (nr 15)<br />

· On 9 June, the ban was extended to the area de WouwseGronden (nr 13)<br />

Prior to making a long-term investment into the infrastructure required to use surface water as a water<br />

source for the development of shale gas, the potential limitations on reliable water withdrawals<br />

warrants further investigation.<br />

Figure 4-13. Area of the De Dommel Water Board, including the location of WWTP facilities: 1) Boxtel WWTP, 5) Tilburg<br />

WWTP, 6) Eindhoven WWTP, 7) Hapert WWTP, 9) Biest-Houtakker WWTP, 10) Haaren WWTP, 11) Sint-Oedenrode WWTP<br />

The capacities of each of these facilities are shown in Table 4-3.<br />

4.3.3 Wastewater Treatment Plant Effluent<br />

Water Boards are also responsible for management and operation of Waste Water Treatment Plants<br />

(WWTP). The WWTPs are summarized in Table 4-3, which includes quality figures about the maximum<br />