16.01.2015 Views

Notional Field Development Final Report - EBN

Notional Field Development Final Report - EBN

Notional Field Development Final Report - EBN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>EBN</strong> <strong>Notional</strong> <strong>Field</strong> <strong>Development</strong> Plan<br />

3.5 Well Design<br />

3.5.1 Drilling Design – Central Zone 8C<br />

Zone 8C was centered on the major “Sweet spot” in the proposed acreage with arbitrary boundaries.<br />

Figure 3-49, Zone 8C "Sweet spot"<br />

A preliminary hazard map was created using a number of shape files provided, these included: Buildings,<br />

drill free zone drinking water, drinking water production areas, ecologically sensitive areas EHS, existing<br />

safety zones, groundwater protection areas, natura2000 areas, overhead power lines, railways, roads,<br />

surface water and underground gas pipe lines. In addition a shape file designating the open agricultural<br />

areas was provided but did not differentiate between agricultural areas used for greenhouse usage,<br />

cultivated fields or inner city parks and golf courses. The building file was also out of date with many<br />

areas seen in the satellite imagery as being built up as part of the urban expansion in the area.<br />

Figure 3-50, Hazard Map<br />

© 2011 Halliburton All Rights Reserved<br />

80

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!