<strong>EBN</strong> <strong>Notional</strong> <strong>Field</strong> <strong>Development</strong> Plan<br />

Figure 4-4. Wetlands area<br />

4.2.9.1 Procedure and authority<br />

If an activity, for which an ‘All-in-one’ permit is required, also requires a waiver based on the Flora and<br />

Fauna Act, the nature section becomes part of the ‘All-in-one’ permit for physical aspects (All-in-one<br />

permit). The preparation of the decision is summarized in the section under Wabo, and where<br />

applicable, to the section about the NCR.<br />

This combination can be avoided if a waiver is applied for at an earlier stage. In this case, the Minister of<br />

Economic Affairs, Agriculture and Innovation remains the authority, however the decision period is 16<br />

weeks. Stakeholders protesting the decision on the Flora and Fauna waiver should first file an appeal<br />

with the Department Administrative Law at the Council of State.<br />

4.2.10 Excavations Act<br />

The Excavations Act contains rules relating to all excavations; excavation without a permit is prohibited.<br />

An excavation permit is necessary for the construction of a water basin and/or for the drilling of holes,<br />

dependent on exact measurements.<br />