<strong>EBN</strong> <strong>Notional</strong> <strong>Field</strong> <strong>Development</strong> Plan<br />

Figure 4-46. Impoundment for storage of water<br />

This siting of these impoundments should be planned in conjunction with the drilling plan / schedule<br />

such that they are located in a centralized area so that water can be transferred to the various well<br />

pads. The water is transferred via pipelines from the source water receiving point (surface water, grey<br />

water provider) to these impoundments and then from the impoundment to the well pad. These<br />

pipelines are typically HDPE or PVC and can above ground or buried. In some instances when the<br />

topography necessitates, pumps may be required to obtain the necessary lift for the water or due to the<br />

distance between the centralized impoundment and the well pad.<br />

Figure 4-47. Installation of liner system for impoundment<br />

© 2011 Halliburton All Rights Reserved<br />

197