<strong>EBN</strong> <strong>Notional</strong> <strong>Field</strong> <strong>Development</strong> Plan<br />

Figure 3-61, Scenario 1 3D View of Wells<br />

CWP Scenario #1 Results are indicated in Figure 3-62, Scenario 1 - 1500m Laterals.<br />

Figure 3-62, Scenario 1 - 1500m Laterals<br />

The wells were planned in 100m reach increments from 200m to a maximum of 800m. Each result<br />

shows how many wells were created at each point.<br />

CWP Scenario 2 – 420 x 2500m Laterals were planned (1,050,000m)<br />

© 2011 Halliburton All Rights Reserved<br />