<strong>EBN</strong> <strong>Notional</strong> <strong>Field</strong> <strong>Development</strong> Plan<br />

• <strong>Report</strong> the test progress to the Drilling Supervisor.<br />

• Transmit all well test information to the <strong>EBN</strong> or designated office at the stipulated times.<br />

• Ensure that all testing personnel have synchronized watches to the computer used for<br />

programming the downhole memory gauges.<br />

• Determine the flowrates (choke sizes) as per guidelines in the well test program.<br />

• Make sure that all relevant data is collected and checked for validity and quality.<br />

• Make sure that all samplings are carried out as per program.<br />

• Monitor the perforation job to be sure that they are at the correct depth.<br />

Reservoir Engineer - The Reservoir Engineer reports directly to the Drilling Supervisor on the rig and is<br />

responsible for data quality control and analysis of the test data.<br />

OIM and Toolpushers – Responsibilities include the following:<br />

• Make sure that radio silence, flaring and wind directions are advised to the relevant parties.<br />

• Stay informed as to changes in the well program.<br />

• Ensure that the Driller is at ALL times on the rig floor, or at relief periods, the Toolpusher is on<br />

the rig floor. Assistant Drillers will not be left alone on the rig floor.<br />

Drillers- Responsibilities include the following:<br />

• The Driller or Toolpusher will be on the floor at all times.<br />

• All operations concerning the annulus and any operation of rig manifold valves.<br />

• Monitoring of the annulus pressure at all times throughout the testing program.<br />

• Driller must inform all key personnel immediately of any problems on the floor.<br />

• The Driller will be in direct communication with the well testing personnel throughout the test<br />

and he is responsible for maintaining a watch on the test equipment and flowlines on the drill<br />

floor.<br />

• Be aware of the location of all personnel during the test.<br />

Well Test Supervisor - The Well Test Supervisor reports to the Test Engineer as the operator’s<br />

representative with the following responsibilities:<br />

• All operations of the test equipment.<br />

• All actions during the test are conducted safely and as per program.<br />

• Must inform the Test Engineer of any actions taking place with the well test equipment.<br />

• Make sure that all his crew understands their duties and how the test will be conducted.<br />

• <strong>Report</strong> any unusual occurrence IMMEDIATELY to Test Engineer.<br />

• The Well Test Crew only will be responsible for operating the surface test tree at all times.<br />

DST Specialists - The DST Specialist reports to the Test Engineer with the following responsibilities:<br />

• Operations of the down-hole DST Equipment.<br />

• Monitor annulus pressure at all times during the test.<br />