<strong>EBN</strong> <strong>Notional</strong> <strong>Field</strong> <strong>Development</strong> Plan<br />
• <strong>Report</strong> the test progress to the Drilling Supervisor.<br />
• Transmit all well test information to the <strong>EBN</strong> or designated office at the stipulated times.<br />
• Ensure that all testing personnel have synchronized watches to the computer used for<br />
programming the downhole memory gauges.<br />
• Determine the flowrates (choke sizes) as per guidelines in the well test program.<br />
• Make sure that all relevant data is collected and checked for validity and quality.<br />
• Make sure that all samplings are carried out as per program.<br />
• Monitor the perforation job to be sure that they are at the correct depth.<br />
Reservoir Engineer - The Reservoir Engineer reports directly to the Drilling Supervisor on the rig and is<br />
responsible for data quality control and analysis of the test data.<br />
OIM and Toolpushers – Responsibilities include the following:<br />
• Make sure that radio silence, flaring and wind directions are advised to the relevant parties.<br />
• Stay informed as to changes in the well program.<br />
• Ensure that the Driller is at ALL times on the rig floor, or at relief periods, the Toolpusher is on<br />
the rig floor. Assistant Drillers will not be left alone on the rig floor.<br />
Drillers- Responsibilities include the following:<br />
• The Driller or Toolpusher will be on the floor at all times.<br />
• All operations concerning the annulus and any operation of rig manifold valves.<br />
• Monitoring of the annulus pressure at all times throughout the testing program.<br />
• Driller must inform all key personnel immediately of any problems on the floor.<br />
• The Driller will be in direct communication with the well testing personnel throughout the test<br />
and he is responsible for maintaining a watch on the test equipment and flowlines on the drill<br />
floor.<br />
• Be aware of the location of all personnel during the test.<br />
Well Test Supervisor - The Well Test Supervisor reports to the Test Engineer as the operator’s<br />
representative with the following responsibilities:<br />
• All operations of the test equipment.<br />
• All actions during the test are conducted safely and as per program.<br />
• Must inform the Test Engineer of any actions taking place with the well test equipment.<br />
• Make sure that all his crew understands their duties and how the test will be conducted.<br />
• <strong>Report</strong> any unusual occurrence IMMEDIATELY to Test Engineer.<br />
• The Well Test Crew only will be responsible for operating the surface test tree at all times.<br />
DST Specialists - The DST Specialist reports to the Test Engineer with the following responsibilities:<br />
• Operations of the down-hole DST Equipment.<br />
• Monitor annulus pressure at all times during the test.<br />