<strong>EBN</strong> <strong>Notional</strong> <strong>Field</strong> <strong>Development</strong> Plan<br />

When both plan and project EIA are required, both EIAs may be combined. If this is the case, the<br />

extensive EIA procedure is followed for the combined EIA.<br />

4.2.13 Summary<br />

Extraction permit<br />

(Mining Act)<br />

Grievance<br />

procedure<br />

Appeal procedure (Council of<br />

State)<br />

All permits are<br />

irrevocable<br />

Spatial zoning procedure<br />

(via NCR)<br />

Extraction plan (Mining Act)<br />

Preparation / EIA<br />

}<br />

All in one permit for<br />

physical aspects<br />

Water Permit<br />

}<br />

Appeal procedure<br />

(Council of State)<br />

Excavation Permit<br />

2 year 34 weeks 32 weeks<br />

Total:<br />

170 weeks<br />

Figure 4-6. Procedures and Permits via NCR<br />