17.01.2015 Views

Strategic Business Plans for Water Supply and Sewerage

Strategic Business Plans for Water Supply and Sewerage

Strategic Business Plans for Water Supply and Sewerage

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

KEY RESULT AREA CURRENT POSITION FUTURE POSITION<br />

• Reclaimed <strong>Water</strong><br />

Coffs Harbour <strong>Water</strong> Reclamation<br />

Plant provides up to 21 megalitres of<br />

reclaimed water daily<br />

Maximise reuse through reclaimed<br />

water where feasible. CHW is in the<br />

process of completing the Reclaimed<br />

<strong>Water</strong> Management Plan. Refer to<br />

Section 7.5.<br />

• Pricing <strong>and</strong><br />

Regulation of<br />

Services<br />

CHW complies with all pricing bestpractice<br />

requirements as stated in<br />

section 3.3.1<br />

CHW intends to meet 100% of bestpractice<br />

pricing requirements<br />

annually. Refer to Section 0.<br />

• Customer<br />

Satisfaction/<br />

Community<br />

Consultation<br />

CHW Community Engagement<br />

Strategy 2030.<br />

CHW’s target is to comply 100% with<br />

Community Engagement Policy<br />

ENVIRONMENT<br />

PROTECTION<br />

CHCC has been working on a<br />

remediation of hydrocarboncontaminated<br />

groundwater affecting<br />

an area in Coramba.<br />

In 2009 Council got a Project<br />

Approval from NSW Minister <strong>for</strong><br />

Planning to construct <strong>and</strong> operate a<br />

groundwater remediation technology<br />

in Martin Street, Coramba.<br />

CHW is developing water <strong>and</strong><br />

sewerage Environmental<br />

Management System<br />

CHW plans to develop <strong>and</strong> maintain<br />

a Due Diligence Program<br />

TOTAL ASSET MANAGEMENT<br />

• Assets<br />

Detail asset condition analyses is not<br />

available<br />

CHW plans to develop assets<br />

condition assessment. Refer to<br />

Section 9.2<br />

• Operation<br />

CHW currently operates the schemes<br />

in accordance with documented<br />

operational procedures<br />

CHW will continue to operate the<br />

schemes in accordance with<br />

documented operational procedures<br />

• Maintenance<br />

CHW maintain the systems in<br />

accordance with maintenance<br />

schedules.<br />

CHW will continue to maintain the<br />

systems in accordance with<br />

maintenance schedules <strong>and</strong><br />

implement asset management<br />

system/plan. Refer to Section 0<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!