17.01.2015 Views

Strategic Business Plans for Water Supply and Sewerage

Strategic Business Plans for Water Supply and Sewerage

Strategic Business Plans for Water Supply and Sewerage

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Coffs Harbour City Council<br />

<strong>Strategic</strong> <strong>Business</strong> Plan <strong>for</strong><br />

<strong>Water</strong> <strong>Supply</strong> <strong>and</strong> <strong>Sewerage</strong><br />

MAY 2012


Coffs Harbour City Council<br />

Job A350<br />

<strong>Strategic</strong> <strong>Business</strong> Plan <strong>for</strong><br />

<strong>Water</strong> <strong>Supply</strong> <strong>and</strong> <strong>Sewerage</strong><br />

May 2012<br />

HydroScience Consulting<br />

A.B.N. 79 120 716 887<br />

Level 5, 350 Kent Street<br />

Sydney, NSW, 2000<br />

Telephone: 02 9249 5100<br />

Facsimilie: 02 9279 2700<br />

Email: hsc@hydroscience.net.au<br />

Document Control<br />

Approved <strong>for</strong> Issue<br />

Issue Author Reviewer Name Signature Date<br />

4 ARA GAZ Gidi Azar 16 May 2012<br />

© HydroScience Consulting 2012<br />

This document shall remain the property of HydroScience Consulting.<br />

Unauthorised use of this document in any <strong>for</strong>m is prohibited.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 1


Executive Summary<br />

Coffs Harbour <strong>Water</strong> (CHW) is the water branch of Coffs Harbour City Council (CHCC),<br />

responsible <strong>for</strong> the delivery of water supply <strong>and</strong> sewerage services within the Coffs Harbour Local<br />

Government Area. This strategic business plan is a long-term blueprint <strong>for</strong> the planning,<br />

development <strong>and</strong> operation of these services.<br />

Operating Environment Review<br />

Be<strong>for</strong>e establishing a long term strategic planning it is essential to underst<strong>and</strong> the external <strong>and</strong><br />

internal environment within which Coffs Harbour <strong>Water</strong> expects to operate in the future.<br />

CHW operates three water supply systems <strong>and</strong> five sewerage systems. Section 2 provides an<br />

overall description of the existing water supply <strong>and</strong> sewerage facilities.<br />

Section 3 provides an overall assessment of CHW’s current institutional arrangements <strong>and</strong> the<br />

legislative framework that impacts CHW businesses <strong>and</strong> a summary of the major issues which<br />

could affect the provision of water supply <strong>and</strong> sewerage services.<br />

Mission Statement<br />

CHW mission statement <strong>for</strong> water supply <strong>and</strong> sewerage services is:<br />

“To provide long term sustainable <strong>and</strong> reliable water supply <strong>and</strong> sewerage services to the<br />

community, which meets legislative, statutory <strong>and</strong> best-practice management requirements.<br />

These services will protect community, health <strong>and</strong> the environment.”<br />

Levels of Service<br />

Coffs Harbour City Council’s primary objective with water supply <strong>and</strong> sewerage services is to<br />

meet the adopted levels of service, which cover the following areas:<br />

<strong>Water</strong> <strong>Supply</strong> Targets<br />

10 working days to connect water supply in<br />

serviced areas<br />

<strong>Sewerage</strong> Targets<br />

10 working days to connect sewerage in serviced<br />

areas<br />

Domestic Peak Day Dem<strong>and</strong>:<br />

2300L/tenement/day<br />

No system failures<br />

Domestic Annual Dem<strong>and</strong>: 200kL/tenement/year<br />

Consumption restrictions in drought to follow the<br />

5:10:10 rule<br />

2 hrs average time to rectify failure<br />

8 hrs maximum duration of supply interruptions<br />

(planned <strong>and</strong> unplanned)<br />

2 hrs average response time to have staff on site<br />

or answer inquiry<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 2


<strong>Water</strong> <strong>Supply</strong> Targets<br />

100% compliance with Building Code of Australia<br />

<strong>and</strong> NSW Fire Fighting requirements<br />

<strong>Sewerage</strong> Targets<br />

1 odor complaint per year per 1000 properties<br />

100% compliance with nominated ADWG, water<br />

quality requirements<br />

Comply with 100% of effluent discharge licences<br />

2hrs average response time to have staff on site<br />

or answer inquiry<br />

Ratio of Peak Wet Weather Flow to Average Dry<br />

Weather Flow of 7<br />

Reuse 20% of the effluent volume<br />

The full levels of service targets, current per<strong>for</strong>mance, Council’s objectives, strategies <strong>and</strong> actions<br />

with regard to the levels of service are provided in section 5.<br />

Service Delivery Strategy<br />

Some contracting out of services already occurs. Council has adopted resource sharing as a<br />

means of reducing costs of operating the water supply <strong>and</strong> sewerage systems. In<strong>for</strong>mation<br />

about contracting out <strong>and</strong> resource sharing is provided in Section 6.<br />

Customer Service Plan<br />

The customer service plan covers negotiating the levels of service with customers, determines the<br />

areas serviced, analyses dem<strong>and</strong> management, infiltration management <strong>and</strong> reclaimed water.<br />

It also establishes the pricing structure, determines customer satisfaction system <strong>and</strong> establishes<br />

customer/community involvement in decision making. These are provided in Section 7.<br />

Total Asset Management Plan<br />

The Total Asset Management Plan includes operation, maintenance <strong>and</strong> capital works. Council<br />

identified that the critical issue is the lack of knowledge of the condition of existing assets.<br />

Council is planning significant investment in capital works. The estimated investment over the<br />

next 30 years is $106 million <strong>and</strong> $151 million in water supply <strong>and</strong> sewerage respectively.<br />

Approximately half of these amounts would be <strong>for</strong> new assets, <strong>and</strong> one quarter <strong>for</strong> renewal of<br />

exiting assets. See Section 9 <strong>for</strong> detailed in<strong>for</strong>mation.<br />

Work Force Plan<br />

Employment per<strong>for</strong>mance at all levels in the organisation <strong>and</strong> skills necessary <strong>for</strong> the operation<br />

<strong>and</strong> management of the systems are crucial to the success of the organisation. Section 10<br />

describes the work <strong>for</strong>ce planning to be adopted by CHW.<br />

Financial Plan<br />

30 year financial plans <strong>for</strong> water supply <strong>and</strong> sewerage are included in Appendix D. The plans<br />

indicate that typical residential bill <strong>for</strong> water supply will need to gradually increase in the next<br />

5 years to $550 (CPI adjusted) <strong>and</strong> then be maintained <strong>for</strong> the rest of the financial planning<br />

horizon (adjusted annually <strong>for</strong> CPI). The sewerage typical residential bill will need to gradually<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 3


increase in the next 10 years to $890 (CPI adjusted) <strong>and</strong> then be maintained <strong>for</strong> the rest of the<br />

financial planning horizon (adjusted annually <strong>for</strong> CPI). These values are in 20011/12 dollars <strong>and</strong><br />

will be indexed annually in accordance with CPI movements.<br />

Figure 1 <strong>and</strong> Figure 2 provide a summary of the results showing the water supply <strong>and</strong> sewerage<br />

typical residential bills, cash <strong>and</strong> investment, <strong>and</strong> borrowing projections.<br />

Base Case 1<br />

600<br />

100000<br />

90000<br />

500<br />

80000<br />

400<br />

300<br />

70000<br />

60000<br />

50000<br />

40000<br />

200<br />

30000<br />

100<br />

0<br />

20000<br />

10000<br />

0<br />

Typical Residential Bills (2011/12$) Borrowing Outst<strong>and</strong>ing Cash <strong>and</strong> Investments<br />

Figure 1: <strong>Water</strong> <strong>Supply</strong> Base Case Results<br />

Base Case 1<br />

900<br />

120000<br />

800<br />

700<br />

600<br />

500<br />

100000<br />

80000<br />

60000<br />

400<br />

300<br />

200<br />

100<br />

40000<br />

20000<br />

0<br />

0<br />

-20000<br />

Typical Residential Bills (2011/12$) Borrowing Outst<strong>and</strong>ing Cash <strong>and</strong> Investments<br />

Figure 2: <strong>Sewerage</strong> Base Case Results<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 4


Other Key Activities Overview<br />

The <strong>Strategic</strong> <strong>Business</strong> Plan is the LWU primary planning document <strong>and</strong> it lists a summary of CHW<br />

other key activities <strong>and</strong> plans in place; this is provided in Section 12.<br />

Action Plan Summary<br />

Current services are generally satisfactory. There are however, some issues, which need to be<br />

addressed in order to provide the water supply <strong>and</strong> sewerage services according to Council’s<br />

levels of service. These are:<br />

Issue<br />

Number of water quality complaints<br />

Addressed in Objective<br />

1 – Levels of Service<br />

Potential water source contamination at the Nymboida <strong>and</strong> Orara River<br />

from mines in the Nymboida <strong>and</strong> Orara catchments, respectively.<br />

1 – Levels of Service<br />

Ensure acceptable pH levels in the potable water<br />

1 – Levels of Service<br />

Dem<strong>and</strong> management measures should be reviewed every 2 years to<br />

ensure the measures in place are appropriate<br />

3 – Dem<strong>and</strong> Management<br />

CHW does not have a completed reclaimed water management plan.<br />

CHW’s Section 60 approval requires updating<br />

5 – Reclaimed <strong>Water</strong><br />

Recycled water agreements are out of date.<br />

5 – Reclaimed <strong>Water</strong><br />

If the contractor resolves to terminate the water reclamation plant<br />

biosolids management contract with CHW, Council does not have a<br />

back-up plan to manage the biosolids<br />

5 – Reclaimed <strong>Water</strong><br />

Increase in water usage charges has caused reduced dem<strong>and</strong> <strong>and</strong><br />

consequently reduced sales (less income)<br />

6 - Pricing<br />

Lack of detailed asset condition assessment<br />

10 - Operations<br />

CVC <strong>and</strong> CHW agreement needs to be reviewed in order to address the<br />

new infrastructure situation<br />

11 - Maintenance<br />

Ageing reticulation systems needs constant maintenance<br />

12 – Capital Works<br />

<strong>Water</strong> mains ageing<br />

12 – Capital Works<br />

A summary of how these are being addressed is included in Section 3.4.<br />

In addition, reviewing the per<strong>for</strong>mance of CHW water supply <strong>and</strong> sewerage as reported by the<br />

NSW Office of <strong>Water</strong> triple bottom line (TBL) reports, a number of additional issues were raised.<br />

These are discussed in Section 14.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 5


Contents<br />

Executive Summary ..................................................................................................... 2<br />

Abbreviations ................................................................................................................. 9<br />

1 Introduction ........................................................................................................ 10<br />

1.1 This <strong>Strategic</strong> <strong>Business</strong> Plan ............................................................................................. 10<br />

1.2 Context .............................................................................................................................. 10<br />

1.3 Benefits of <strong>Strategic</strong> <strong>Business</strong> <strong>Plans</strong> ............................................................................... 10<br />

1.4 The <strong>Strategic</strong> <strong>Business</strong> Planning Process ....................................................................... 11<br />

2 Existing Facilities ............................................................................................. 12<br />

2.1 <strong>Water</strong> <strong>Supply</strong> ..................................................................................................................... 12<br />

2.1.1 <strong>Water</strong> Resources ..................................................................................................... 12<br />

2.1.2 Coffs Harbour .......................................................................................................... 13<br />

2.1.3 Coramba ................................................................................................................. 13<br />

2.1.4 Nana Glen ............................................................................................................... 14<br />

2.1.5 Bulk Regional <strong>Water</strong> <strong>Supply</strong> Scheme (RWSS) .................................................... 14<br />

2.2 <strong>Sewerage</strong> .......................................................................................................................... 18<br />

3 Operating Environment Review ................................................................ 19<br />

3.1 Institutional Arrangements .............................................................................................. 19<br />

3.1.1 <strong>Water</strong> <strong>Supply</strong> Agreements .................................................................................... 19<br />

3.1.2 <strong>Sewerage</strong> Agreements ......................................................................................... 19<br />

3.2 Legislative Framework ..................................................................................................... 20<br />

3.3 Situation Analyses ............................................................................................................. 20<br />

3.3.1 Best-Practice Management ................................................................................. 20<br />

3.3.2 Key Result Areas ..................................................................................................... 22<br />

3.4 Summary of Major Issues ................................................................................................. 24<br />

4 Mission Statement ........................................................................................... 26<br />

5 Levels of Service ............................................................................................... 27<br />

6 Service Delivery ................................................................................................ 32<br />

6.1 Private Sector Resources................................................................................................. 32<br />

6.1.1 Contracting Out ..................................................................................................... 32<br />

6.1.2 Private Sector Involvement in Scheme Development .................................... 32<br />

6.2 Resource Sharing .............................................................................................................. 34<br />

6.3 Impact on Planning ......................................................................................................... 34<br />

7 Customer Service Plan ................................................................................... 35<br />

7.1 Review of Levels of Service ............................................................................................ 35<br />

7.2 Areas Serviced .................................................................................................................. 35<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 6


7.3 Dem<strong>and</strong> Management .................................................................................................. 37<br />

7.4 Infiltration Management ................................................................................................. 39<br />

7.5 Reclaimed <strong>Water</strong> ............................................................................................................. 40<br />

7.6 Pricing ................................................................................................................................. 41<br />

7.6.1 <strong>Water</strong> <strong>Supply</strong> Pricing .............................................................................................. 42<br />

7.6.2 <strong>Sewerage</strong> Pricing ................................................................................................... 43<br />

7.7 Customer Satisfaction...................................................................................................... 44<br />

7.8 Community Consultation ................................................................................................ 45<br />

8 Environment Protection <strong>and</strong> Sustainable Development ............... 47<br />

8.1 Environment Protection ................................................................................................... 47<br />

8.2 Due Diligence Requirements ......................................................................................... 47<br />

9 Total Asset Management Plan ................................................................... 49<br />

9.1 Introduction ....................................................................................................................... 49<br />

9.2 Operation Plan ................................................................................................................. 50<br />

9.3 Maintenance Plan ........................................................................................................... 52<br />

9.4 Capital Works Plan ........................................................................................................... 52<br />

10 Work Force Plan ................................................................................................ 54<br />

11 Financial Plan ..................................................................................................... 55<br />

12 Summary of Extra Costs ............................................................................... 56<br />

13 Summary of Other Key Activities ............................................................. 56<br />

13.1 Integrated <strong>Water</strong> Cycle Management........................................................................ 56<br />

13.2 Drinking <strong>Water</strong> Quality Management .......................................................................... 56<br />

13.3 Environmental Management ......................................................................................... 56<br />

13.4 Dem<strong>and</strong> Management .................................................................................................. 57<br />

13.5 Drought Management .................................................................................................... 57<br />

13.6 Community Consultation ................................................................................................ 57<br />

13.7 Occupational Health & Safety ...................................................................................... 57<br />

13.8 Other Risk Management Measures ............................................................................... 57<br />

14 Reporting <strong>and</strong> Monitoring ........................................................................... 59<br />

14.1 <strong>Water</strong> <strong>Supply</strong> Per<strong>for</strong>mance Indicators ......................................................................... 59<br />

14.2 <strong>Sewerage</strong> Per<strong>for</strong>mance Indicators ............................................................................... 60<br />

15 Integrated Planning <strong>and</strong> Reporting ........................................................ 61<br />

Appendix A .................................................................................................................... 62<br />

Areas Serviced Maps .................................................................................................................. 62<br />

Appendix B .................................................................................................................... 70<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 7


Capital Works Program ............................................................................................................... 70<br />

Appendix C .................................................................................................................... 83<br />

Organizational Charts ................................................................................................................. 83<br />

Appendix D .................................................................................................................... 86<br />

Financial <strong>Plans</strong> .............................................................................................................................. 86<br />

Appendix E ................................................................................................................. 106<br />

Integrated <strong>Water</strong> Cycle Management Plan ........................................................................ 106<br />

Appendix F .................................................................................................................. 110<br />

State of the Environment Report ............................................................................................ 110<br />

Appendix G ................................................................................................................. 113<br />

Dem<strong>and</strong> Management Plan ................................................................................................... 113<br />

Appendix H ................................................................................................................. 116<br />

Drought Management Plan .................................................................................................... 116<br />

Appendix I ................................................................................................................... 122<br />

Community Engagement Strategy ........................................................................................ 122<br />

Appendix J .................................................................................................................. 125<br />

Health, Safety, Environment <strong>and</strong> Quality Policy .................................................................. 125<br />

Appendix K ................................................................................................................. 130<br />

TBL Per<strong>for</strong>mance Reports <strong>and</strong> Action <strong>Plans</strong>.......................................................................... 130<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 8


Abbreviations<br />

The following abbreviations have been used in this plan.<br />

AC Access Charge<br />

BOOT Build, own operate <strong>and</strong> transfer<br />

CHCC Coffs Harbour City Council<br />

CHW Coffs Harbour <strong>Water</strong><br />

COAG Council of Australian Governments<br />

CRC Current replacement cost. The cost to replace existing assets with new assets that will<br />

provide the same service function<br />

CVC Clarence Valley Council<br />

CWP Capital Works Program<br />

DA Development Application<br />

DBO Design, build <strong>and</strong> operate<br />

DCP Development Control Plan<br />

DCS Director of City Services<br />

DLWC Department of L<strong>and</strong> <strong>and</strong> <strong>Water</strong> Conservation<br />

EMF Executive Manager of Finance<br />

EMO Executive Manager Operations<br />

EP Environment Protection<br />

ET Equivalent Tenements<br />

HR Human Resources<br />

KLS Volume of <strong>Water</strong> Used<br />

LEP Local Environment Plan<br />

LWU Local <strong>Water</strong> Utility<br />

MF Meter factor<br />

MSI Manager <strong>Strategic</strong> Infrastructure<br />

MLUP Manager L<strong>and</strong> Use Planning<br />

MD Manager Distribution<br />

MWT Manager <strong>Water</strong> Treatment<br />

O&M Operation <strong>and</strong> Maintenance<br />

POEO Protection of the Environment Operations<br />

PRP Pollution Reduction Program<br />

RWSS Regional <strong>Water</strong> <strong>Supply</strong> Scheme<br />

SDF Sewer Discharge Factor<br />

SoE State of Environment Report<br />

STC Senior Technical Coordinator<br />

WDCC Written down current cost. The current replacement cost less the accumulated<br />

depreciation to date.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 9


1 Introduction<br />

1.1 This <strong>Strategic</strong> <strong>Business</strong> Plan<br />

The strategic business plan sets out Coffs Harbour <strong>Water</strong>'s (CHW) long term plans <strong>for</strong> the<br />

operation, management, maintenance <strong>and</strong> development of the water supply <strong>and</strong> sewerage<br />

schemes.<br />

This document covers both the water supply <strong>and</strong> the sewerage systems, reflecting the way these<br />

businesses are managed by CHW. The document has been kept brief in order to make it<br />

relevant <strong>and</strong> easy to read, underst<strong>and</strong> <strong>and</strong> update. The direction <strong>and</strong> targets contained in this<br />

document were discussed in a workshop in Coffs Harbour on 19 July 2011.<br />

This <strong>Strategic</strong> <strong>Business</strong> Plan satisfies the requirements set out in the best-practice management<br />

guidelines (2007) <strong>and</strong> strategic business plan guidelines (2011) by the NSW Office of <strong>Water</strong>.<br />

1.2 Context<br />

<strong>Strategic</strong> business plans <strong>for</strong> water supply <strong>and</strong> sewerage have<br />

been prepared by local water utilities in NSW <strong>for</strong> nearly 20 years.<br />

Having an up to date strategic business plan is one of the six<br />

criteria that need to be met in order to achieve best-practice<br />

compliance, as defined in Best-Practice Management of <strong>Water</strong><br />

<strong>Supply</strong> <strong>and</strong> <strong>Sewerage</strong>, Guidelines, August 2007.<br />

Best-Practice Criteria:<br />

1. <strong>Strategic</strong> <strong>Business</strong> Planning<br />

2. Pricing<br />

3. <strong>Water</strong> Conservation<br />

4. Drought Management<br />

5. Per<strong>for</strong>mance Reporting<br />

6. Integrated <strong>Water</strong> Cycle Management<br />

1.3 Benefits of <strong>Strategic</strong> <strong>Business</strong> <strong>Plans</strong><br />

The benefit to Coffs Harbour City Council <strong>and</strong> its community are:<br />

<br />

<br />

<br />

<br />

Improve management per<strong>for</strong>mance<br />

Improve financial per<strong>for</strong>mance<br />

Avoid or minimize increases to Typical Residential Bills<br />

Increase accountability to customers<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 10


1.4 The <strong>Strategic</strong> <strong>Business</strong> Planning Process<br />

The strategic business planning process is described by the following flow chart <strong>and</strong> narrative<br />

below.<br />

The water supply <strong>and</strong> sewerage businesses aim to deliver agreed levels of service using assets<br />

<strong>and</strong> staff. These are funded through a combination of capital investment <strong>and</strong> recurrent<br />

expenditures.<br />

The financial plan converts funding requirements into annual charges to be levied on customers,<br />

making allowance <strong>for</strong> other sources of funds, in particular developer charges.<br />

If the annual charges are considered unaf<strong>for</strong>dable, the levels of service need to be modified,<br />

<strong>and</strong> the process repeated until the charges are acceptable.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 11


2 Existing Facilities<br />

The delivery of water supply <strong>and</strong> sewerage services is the responsibility of the Coffs Harbour<br />

<strong>Water</strong>, which is the <strong>Water</strong> Branch of Coffs Harbour City Council.<br />

2.1 <strong>Water</strong> <strong>Supply</strong><br />

Coffs Harbour <strong>Water</strong> has three water supply systems supplying treated water to the whole city.<br />

The biggest system, Coffs Harbour <strong>Water</strong> <strong>Supply</strong>, supplies water to coastal consumers from<br />

Sawtell in the south to Corindi Beach in the north. This system draws raw water from the Orara<br />

River <strong>and</strong> the Nymboida River <strong>and</strong> stores it in Shannon Creek Dam <strong>and</strong> Karangi Dam. The two<br />

smaller systems are village water supplies <strong>for</strong> Coramba <strong>and</strong> Nana Glen. Nana Glen draws water<br />

from the Orara River downstream from the Coffs Harbour water supply intake. Coramba draws<br />

water from the Regional <strong>Water</strong> <strong>Supply</strong> System (RWSS) pipeline which is fed from the Nymboida<br />

River, or is back-fed from Karangi Dam, when water quality from Nymboida River, or Shannon<br />

Creek Dam deteriorates after heavy rain or <strong>for</strong> other reasons.<br />

2.1.1 <strong>Water</strong> Resources<br />

The Orara River is subject to seasonal fluctuations in flow rates. Whilst up to 61 megalitres per<br />

day (ML/d) is capable of being pumped from the river, the normal pumping rate is 34.5 ML/d.<br />

Actual abstractions are dependent on river levels <strong>and</strong> dem<strong>and</strong>, <strong>and</strong> are subject to the<br />

conditions attached to the licence issued by the NSW Office of <strong>Water</strong>. These conditions include<br />

low river flow protection requirements (environmental flow requirements). During periods of<br />

drought when the river is low, no pumping is possible <strong>and</strong> stored water in the Dam must be used.<br />

Raw water is pumped from the Orara River to fill Karangi Dam at Cochranes Pool, when the<br />

quality is good. When the water quality is poor no pumping occurs.<br />

Karangi Dam has a storage capacity of 5,600 ML. Under the normal drought security criteria, the<br />

dam has a secure yield of 4,000 ML/year. With the existing low flow protection on the Orara<br />

River, the system is unable to meet the current <strong>and</strong> future annual water dem<strong>and</strong>s without<br />

frequent water restrictions. In view of the <strong>Water</strong> Re<strong>for</strong>ms <strong>and</strong> the Orara River’s high rating under<br />

the stressed rivers criteria (being habitat <strong>for</strong> the Eastern Freshwater Cod), a greater level of flow<br />

protection is proposed. For these reasons the Regional <strong>Water</strong> <strong>Supply</strong> System including Shannon<br />

Creek Dam was constructed.<br />

The RWSS’s pipeline linking the Nymboida River to Karangi Dam was constructed in December<br />

2002, Council began taking raw water from the Nymboida River to fill the Karangi Dam, as part of<br />

the Clarence Valley <strong>and</strong> Coffs Harbour Regional <strong>Water</strong> <strong>Supply</strong> Scheme. <strong>Supply</strong> can also be<br />

taken from the recently constructed Shannon Creek Dam, a 30,000 ML off-stream storage at<br />

Shannon Creek.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 12


2.1.2 Coffs Harbour<br />

Coffs Harbour's water supply serves approximately 29,230 households, between Corindi in the<br />

north, Sawtell/Toormina in the south.<br />

To ensure the best quality water is delivered to its water customers Coffs Harbour <strong>Water</strong> takes the<br />

multi-barrier approach which comprises 7 steps:<br />

1. Catchment Management<br />

2. Controlled Abstraction of raw water at Cochranes Pool from the Orara River <strong>and</strong> from<br />

the Nymboida River at Nymboida Weir<br />

3. Aeration in Karangi <strong>and</strong> Shannon Creek Dams<br />

4. Raising ph <strong>and</strong> alkalinity<br />

5. Karangi <strong>Water</strong> Treatment Plant using dissolved air floatation (DAF) <strong>and</strong> filtration<br />

6. Fluoridation<br />

7. Chlorine <strong>and</strong> UV disinfection<br />

(Source: http://www.coffsharbour.nsw.gov.au/places-<strong>for</strong>-living/drinking-water-supply/watertreatment/Pages/drinking-water-treatment.aspx,<br />

accessed 19 Oct 2011).<br />

The <strong>Water</strong> Filtration Plant at Karangi was officially opened on 9 June 2009. The DAFF Plant is<br />

located on Upper Orara Road, Karangi. The location of the plant was chosen following an<br />

extensive selection process that covers social, environmental <strong>and</strong> financial issues. Detail<br />

in<strong>for</strong>mation about the plant is in Council’s website (http://www.coffsharbour.nsw.gov.au/places<strong>for</strong>-living/drinking-water-supply/water-treatment/Pages/DAFF-plant.aspx,<br />

accessed 19 Oct 2011).<br />

2.1.3 Coramba<br />

About 240 households in Coramba are supplied with water from a high level reservoir located<br />

above the village. <strong>Water</strong> from the Regional <strong>Water</strong> <strong>Supply</strong> Pipeline is disinfected <strong>and</strong> then<br />

pumped to the reservoir, which stores about 0.45 megalitres of water.<br />

The water from the Regional <strong>Water</strong> <strong>Supply</strong> Pipeline is sourced from the Nymboida River, or is<br />

back-fed from Karangi Dam, when water quality from Nymboida system deteriorates.<br />

Coffs Harbour <strong>Water</strong> plans to connect the village of Coramba to the water supply from the<br />

<strong>Water</strong> Treatment Plant at Karangi, which also supplies all the drinking water <strong>for</strong> Coffs Harbour, by<br />

the end of 2014.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 13


2.1.4 Nana Glen<br />

To supply the residents of Nana Glen <strong>and</strong> Nana Glen Rail, water is pumped from the Orara River,<br />

clarified, filtered, disinfected <strong>and</strong> conditioned at the Nana Glen <strong>Water</strong> Treatment Plant. The<br />

treated water is stored in two 0.5 megalitres reservoirs on site. It is then reticulated to<br />

approximately 145 households.<br />

A schematic plan of the CHW water supply area is shown in Figure 5.<br />

2.1.5 Bulk Regional <strong>Water</strong> <strong>Supply</strong> Scheme (RWSS)<br />

The RWSS was constructed in order to provide a secure safe <strong>and</strong> reliable bulk raw water supply<br />

<strong>for</strong> the existing <strong>and</strong> future population of the region during drought periods. Coffs Harbour <strong>Water</strong><br />

is involved in the bulk raw water Regional <strong>Water</strong> <strong>Supply</strong> Scheme. The scheme also involves the<br />

non-build part of the Strategy, the Regional <strong>Water</strong> Efficiency Plan. This has had the immediate<br />

effect of extending the full operational life of the scheme. The scheme includes 87 km of<br />

underground pipeline distribution system linking the Nymboida River to the Reservoirs at South<br />

Grafton, Karangi Dam at Coffs Harbour <strong>and</strong> an off-stream storage of 30,000 ML at Shannon<br />

Creek. The storage at Shannon Creek provides a reliable supply during droughts <strong>and</strong> periods of<br />

low flow in the Nymboida River. The RWSS ensures that improved environmental flows are<br />

maintained in both the Orara <strong>and</strong> Nymboida Rivers.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 14


Figure 3: Regional <strong>Water</strong> <strong>Supply</strong> Scheme Map<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 15


Figure 4: Regional <strong>Water</strong> <strong>Supply</strong> Scheme Schematic Layout<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 16


Figure 5: CHCC <strong>Water</strong> Distribution Mains <strong>and</strong> Reservoirs<br />

Source: CHCC staff<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 17


2.2 <strong>Sewerage</strong><br />

Coffs Harbour <strong>Water</strong> operates five sewerage schemes. Each scheme has a water reclamation<br />

plant, treating the wastewater be<strong>for</strong>e returning the treated effluent to the environment. The<br />

general layout of the schemes is shown in Figure 3.<br />

Coffs Harbour sewerage scheme serves Coffs Harbour, Korora <strong>and</strong> Sapphire. The scheme<br />

comprises a water reclamation plant (WRP) with a capacity to provide tertiary treatment to<br />

wastewater from 72,000 equivalent persons (EP), a deep sea release (DSR) at Boambee Beach, a<br />

network of pipes <strong>and</strong> 60 pumping stations to transport the wastewater to the treatment plant.<br />

The DSR discharges excess reclaimed water 1.5kms offshore. The reclaimed water is used on<br />

sports fields, golf courses <strong>and</strong> nurseries etc.<br />

Sawtell sewerage scheme serves Sawtell, Boambee <strong>and</strong> Toormina. The scheme comprises a<br />

sewage treatment plant with a capacity to provide tertiary treatment to waste water from<br />

18,000 EP, an ocean outfall near Boambee Headl<strong>and</strong>, a network of pipes <strong>and</strong> 18 pumping<br />

stations to transport the wastewater to the treatment plant. A portion of the reclaimed water is<br />

used on the local golf club <strong>and</strong> bowling greens. The Sawtell plant will be decommissioned by<br />

mid 2013 <strong>and</strong> the raw sewage pumped to the Coffs Harbour WRP <strong>for</strong> treatment.<br />

Woolgoolga sewerage scheme serves Woolgoolga, S<strong>and</strong>y Beach, Safety Beach, Mullaway <strong>and</strong><br />

Arrawarra. The scheme comprises a tertiary sewage treatment plant with 18,000 EP capacity, a<br />

network of pipes <strong>and</strong> 25 pumping stations to transport the wastewater to the treatment plant.<br />

Reclaimed water from the treatment plant is discharged to the reclaimed main <strong>and</strong> reservoir<br />

which serves consumers in the area, the excess is then discharged to the Coffs Harbour deep sea<br />

release.<br />

Moonee sewerage scheme serves the Moonee <strong>and</strong> Emerald Beach areas. The scheme<br />

comprises a tertiary sewage treatment plant with a capacity of 7,000 EP <strong>and</strong> discharges<br />

reclaimed water to the reclaimed water system with excess going to the deep sea release in<br />

Coffs Harbour. The scheme also has a network of pipelines <strong>and</strong> 7 pump stations.<br />

Corindi sewerage scheme serves the Corindi area <strong>and</strong> consists of a 1,500 EP tertiary treatment<br />

plant, a network of pipes <strong>and</strong> 4 pump stations. The plant currently discharges reclaimed water to<br />

adjoining properties <strong>for</strong> irrigation with excess being diverted to the Woolgoolga <strong>Sewerage</strong><br />

Scheme.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 18


3 Operating Environment Review<br />

Be<strong>for</strong>e establishing a long term strategic plan it is essential to underst<strong>and</strong> the external <strong>and</strong><br />

internal environment within which Coffs Harbour <strong>Water</strong> expect to operate in the future.<br />

This section provides an overall assessment of CHW’s existing <strong>and</strong> future situation <strong>and</strong> of the<br />

services provided. It will identify areas where problems or constraints exist, which could affect the<br />

provision of water supply <strong>and</strong> sewerage services.<br />

3.1 Institutional Arrangements<br />

3.1.1 <strong>Water</strong> <strong>Supply</strong> Agreements<br />

CHW delivers water supply <strong>and</strong> sewerage services as a local water utility (LWU) under the<br />

provisions of the Local Government Act 1993. The water supply <strong>and</strong> sewerage operations are a<br />

unit within Coffs Harbour <strong>Water</strong> Operational Section.<br />

In regards to the major extractions from the Nymboida River, water sharing is structured along the<br />

following arrangements. Essential Energy holds a water licence under the <strong>Water</strong> Act 1912 used<br />

<strong>for</strong> extraction of water from the Nymboida Weir. Clarence Valley Council (CVC) obtains bulk raw<br />

water supply from Essential Energy on the basis of a negotiated service agreement with Essential<br />

Energy. In turn Coffs Harbour <strong>Water</strong> (CHW) has a service agreement with CVC <strong>for</strong> the provision<br />

of bulk water supply. Each of the licences <strong>and</strong> agreements incorporates provisions to protect<br />

low flows. (Source: CHW IWCM Concept Study, Feb 2010).<br />

CHW staff has advised that Essential Energy agreement with CVC will be reviewed in 2012. CVC<br />

should consult with CHW.<br />

3.1.2 <strong>Sewerage</strong> Agreements<br />

CHW has a biosolids management contract with Biomass. Biomass is currently responsible to<br />

management collection <strong>and</strong> appropriate disposal of biosolids. CHW does not have a biosolids<br />

management emergency plan should Biomass terminate the contract.<br />

NSW Office of Environment <strong>and</strong> Heritage (OEH) requires audit <strong>and</strong> risk assessment of farm<br />

irrigation systems using reclaimed water. CHW is currently preparing a recycle water<br />

management plan which is aimed to comply with OEH requirements. CHW recycled water<br />

agreements are due to be updated <strong>and</strong> extended.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 19


3.2 Legislative Framework<br />

The key acts that impact CHW water supply <strong>and</strong> sewerage business are listed in Table 1.<br />

Table 1: Legislation<br />

Act<br />

Main implications <strong>for</strong> CHW water <strong>and</strong> sewerage business<br />

Local Government Act 1993 • Power <strong>and</strong> obligation of Council as local water utility<br />

• Requirements <strong>for</strong> financial management <strong>and</strong> regulatory<br />

approvals<br />

• Power to levy charges <strong>and</strong> enter property<br />

• Requires approvals (section 60) to construct <strong>and</strong> operate works<br />

Environmental Planning <strong>and</strong><br />

Assessment Act 1979<br />

Protection of the Environment<br />

Operations Act 1997<br />

• Requirement <strong>for</strong> environmental assessment of new works<br />

• Requirement <strong>for</strong> LEP <strong>and</strong> DCP’s<br />

• Control of Industrial Development<br />

• Control of contaminants<br />

• Licensing of sewerage treatment plant discharges<br />

• Penalties <strong>for</strong> polluting the environment<br />

• Requirement to exercise due diligence<br />

<strong>Water</strong> Management Act 2000 • <strong>Water</strong> allocations, extraction licences <strong>and</strong> sharing plans<br />

• Levying developer charges<br />

Occupational Health <strong>and</strong><br />

Safety Act (1983)<br />

• Identification <strong>and</strong> management of risks to personnel <strong>and</strong> others<br />

Dams Safety Act 1978 • Maintain a surveillance of prescribed dams<br />

• Formulate measures to ensure the safety of dams<br />

The above is not an exhaustive list. Many other acts <strong>and</strong> regulations impact on the operation of<br />

water supply <strong>and</strong> sewerage business.<br />

3.3 Situation Analyses<br />

This section provides analyses of CHW strengths, weaknesses, opportunities, threats <strong>and</strong> emerging<br />

issues related to Council’s water <strong>and</strong> sewerage businesses.<br />

3.3.1 Best-Practice Management<br />

Table 2 <strong>and</strong> Table 3 provide CHCC’s compliance with NSW Office of <strong>Water</strong> Best-Practice<br />

management requirements.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 20


Table 2: Compliance with Best-Practice Requirements <strong>for</strong> <strong>Water</strong> <strong>Supply</strong><br />

Best-Practice Requirement<br />

Status<br />

1. <strong>Strategic</strong> <strong>Business</strong> Planning This document<br />

2. Pricing<br />

Full cost recovery without significant cross subsidies<br />

Comply<br />

Complying residential charges with pay-<strong>for</strong>-use water<br />

pricing, independent of l<strong>and</strong> value<br />

Comply<br />

Complying non-residential charges<br />

Comply<br />

Development servicing plan, commercial developer<br />

charges<br />

Comply: DSP 2010<br />

At least 75% of residential revenue from usage charges<br />

Comply<br />

Bill quarterly<br />

Comply<br />

3. <strong>Water</strong> Conservation <strong>and</strong> Dem<strong>and</strong> Management Dem<strong>and</strong> Management Plan,<br />

2006.Dem<strong>and</strong> management measures<br />

need to be updated every 2 years.<br />

4. Drought Management Comply<br />

5. Per<strong>for</strong>mance Reporting Comply annually<br />

6. Integrated <strong>Water</strong> Cycle Management (IWCM) Council has adopted addendum to 2006<br />

IWCM Concept Study, February 2010.<br />

Table 3: Compliance with Best-Practice Requirements <strong>for</strong> <strong>Sewerage</strong><br />

Best-Practice Requirement<br />

Status<br />

1. <strong>Strategic</strong> <strong>Business</strong> Planning This document<br />

2. Pricing<br />

Full cost recovery without significant cross subsidies<br />

Comply<br />

Complying residential charges, independent of l<strong>and</strong> value<br />

Comply<br />

Complying non-residential charges<br />

Comply<br />

Development servicing plan, commercial developer<br />

charges<br />

Comply: Development Servicing Plan<br />

2010 <strong>and</strong> Trade Waste Policy 2007<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 21


Best-Practice Requirement<br />

Complying trade waste fees <strong>and</strong> charges<br />

Status<br />

Comply<br />

Complying trade waste policy <strong>and</strong> approval <strong>for</strong> all<br />

dischargers<br />

Comply<br />

5. Per<strong>for</strong>mance Reporting Comply annually<br />

6. Integrated <strong>Water</strong> Cycle Management (IWCM) Council has adopted addendum to 2006<br />

IWCM Concept Study, February 2010.<br />

3.3.2 Key Result Areas<br />

KEY RESULT AREA CURRENT POSITION FUTURE POSITION<br />

LEVELS OF SERVICE<br />

The current LOS are documented in<br />

section 5<br />

There are no pressures <strong>for</strong> an increase<br />

or reduction in levels of service.<br />

SERVICE DELIVERY<br />

Council has adopted resource<br />

sharing as a means of reducing costs<br />

of operating the water supply <strong>and</strong><br />

sewerage systems.<br />

Management of major water supply<br />

<strong>and</strong> sewerage projects, design,<br />

constructions <strong>and</strong> specialist services<br />

are managed by Council staff using a<br />

variety of procurement options.<br />

Council will continue to review<br />

options <strong>for</strong> resource sharing both with<br />

other business areas within Council<br />

<strong>and</strong> with external organisations. Refer<br />

to Section 6.<br />

CUSTOMER SERVICE<br />

• Areas Serviced<br />

The majority of Coffs Harbour's urban<br />

areas are serviced.<br />

Some towns <strong>and</strong> villages (mainly rural)<br />

are not feasible to service <strong>and</strong> others<br />

have community opposition to<br />

service. Refer to Section 7.2.<br />

• Dem<strong>and</strong><br />

Management<br />

CHW average annual residential<br />

water dem<strong>and</strong> per property is similar<br />

to other coastal areas. See section 7.3<br />

<strong>for</strong> details.<br />

CHW has a dem<strong>and</strong> management<br />

plan in place. It is expected that<br />

continuing dem<strong>and</strong> management<br />

implementation will maintain the<br />

dem<strong>and</strong> per residential property at a<br />

reasonable level. Regional <strong>Water</strong><br />

<strong>Supply</strong> <strong>Water</strong> Efficiency Program<br />

updated 2011.<br />

• Infiltration<br />

Management<br />

High inflow <strong>and</strong> infiltration of<br />

stormwater into the sewerage system<br />

is an issue <strong>for</strong> CHW.<br />

CHW is investigating the problem <strong>and</strong><br />

reducing inflow <strong>and</strong> infiltration in the<br />

sewerage systems. Refer to Section<br />

7.4.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 22


KEY RESULT AREA CURRENT POSITION FUTURE POSITION<br />

• Reclaimed <strong>Water</strong><br />

Coffs Harbour <strong>Water</strong> Reclamation<br />

Plant provides up to 21 megalitres of<br />

reclaimed water daily<br />

Maximise reuse through reclaimed<br />

water where feasible. CHW is in the<br />

process of completing the Reclaimed<br />

<strong>Water</strong> Management Plan. Refer to<br />

Section 7.5.<br />

• Pricing <strong>and</strong><br />

Regulation of<br />

Services<br />

CHW complies with all pricing bestpractice<br />

requirements as stated in<br />

section 3.3.1<br />

CHW intends to meet 100% of bestpractice<br />

pricing requirements<br />

annually. Refer to Section 0.<br />

• Customer<br />

Satisfaction/<br />

Community<br />

Consultation<br />

CHW Community Engagement<br />

Strategy 2030.<br />

CHW’s target is to comply 100% with<br />

Community Engagement Policy<br />

ENVIRONMENT<br />

PROTECTION<br />

CHCC has been working on a<br />

remediation of hydrocarboncontaminated<br />

groundwater affecting<br />

an area in Coramba.<br />

In 2009 Council got a Project<br />

Approval from NSW Minister <strong>for</strong><br />

Planning to construct <strong>and</strong> operate a<br />

groundwater remediation technology<br />

in Martin Street, Coramba.<br />

CHW is developing water <strong>and</strong><br />

sewerage Environmental<br />

Management System<br />

CHW plans to develop <strong>and</strong> maintain<br />

a Due Diligence Program<br />

TOTAL ASSET MANAGEMENT<br />

• Assets<br />

Detail asset condition analyses is not<br />

available<br />

CHW plans to develop assets<br />

condition assessment. Refer to<br />

Section 9.2<br />

• Operation<br />

CHW currently operates the schemes<br />

in accordance with documented<br />

operational procedures<br />

CHW will continue to operate the<br />

schemes in accordance with<br />

documented operational procedures<br />

• Maintenance<br />

CHW maintain the systems in<br />

accordance with maintenance<br />

schedules.<br />

CHW will continue to maintain the<br />

systems in accordance with<br />

maintenance schedules <strong>and</strong><br />

implement asset management<br />

system/plan. Refer to Section 0<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 23


KEY RESULT AREA CURRENT POSITION FUTURE POSITION<br />

• Capital Works<br />

<strong>Water</strong> <strong>Supply</strong><br />

<strong>Water</strong> supply 30 years capital works<br />

plan is up to date.<br />

The 30 year anticipated capital works<br />

investment is estimated at $106 M.<br />

About 60% of the works is <strong>for</strong> growth,<br />

25% is <strong>for</strong> renewals <strong>and</strong> 15% is <strong>for</strong><br />

backlog or improvement of LOS.<br />

Refer to Appendix B.<br />

<strong>Sewerage</strong><br />

<strong>Sewerage</strong> 30 years capital works plan<br />

is up to date.<br />

The 30 year anticipated capital works<br />

investment is estimated at $151 M.<br />

About 55% of the works is <strong>for</strong> growth,<br />

35% is <strong>for</strong> renewals <strong>and</strong> 10% is <strong>for</strong><br />

backlog or improve LOS. Refer to<br />

Appendix B.<br />

WORK FORCE<br />

Council has the appropriate organization structure <strong>and</strong> staff with the skills<br />

necessary <strong>for</strong> the operation <strong>and</strong> management of the current <strong>and</strong> future<br />

systems<br />

Council aims to train <strong>and</strong> recruit staff<br />

as required<br />

FINANCE<br />

The current <strong>and</strong> future financial position of CHW water supply <strong>and</strong> sewerage<br />

businesses is provided in Appendix D.<br />

3.4 Summary of Major Issues<br />

A number of issues that can improve the service to customers have been identified by CHW staff<br />

during the preparation of this strategic business plan. These issues <strong>and</strong> the proposed strategy to<br />

address them are listed throughout this report <strong>and</strong> are summarised below.<br />

Issue<br />

High number of water quality complaints<br />

Proposed Strategies<br />

Council has recently noticed a drop in these<br />

complaints following the construction of water<br />

treatment plant. This will continue to be monitored by<br />

Council.<br />

Prepare <strong>and</strong> implement Drinking <strong>Water</strong> Quality<br />

Management Plan<br />

Identify <strong>and</strong> implement remedial actions to address<br />

dirty water issues<br />

Potential water source contamination at<br />

the Nymboida <strong>and</strong> Orara Rivers from<br />

mines in the Nymboida <strong>and</strong> Orara<br />

catchments, respectively.<br />

Prepare <strong>and</strong> implement Drinking <strong>Water</strong> Quality<br />

Management Plan<br />

Ensure acceptable pH levels in the<br />

potable water<br />

Implement remedial actions such as moving lime<br />

dosing from the Karangi Dam to the Karangi WTP<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 24


Issue<br />

Dem<strong>and</strong> Management measures should<br />

be reviewed every 2 years to ensure the<br />

measures in place are appropriate<br />

Proposed Strategies<br />

Review <strong>and</strong> update dem<strong>and</strong> management plan<br />

<strong>and</strong>/or measures<br />

CHW does not have a completed<br />

reclaimed water management plan.<br />

Finalise reclaimed water management plan<br />

Recycled water agreements are out of<br />

date.<br />

Review <strong>and</strong> update recycled water agreements<br />

If the contractor resolves to terminate the<br />

water reclamation plant biosolids<br />

management contract with CHW, Council<br />

does not have a back-up plan to manage<br />

the biosolids<br />

Prepare biosolids management emergency plan<br />

Increase in water usage charges has<br />

caused reduced dem<strong>and</strong> <strong>and</strong><br />

consequently reduced sales (less income)<br />

Review budget <strong>and</strong> adjust pricing<br />

Lack of detailed asset condition<br />

assessment<br />

Develop assets condition assessment<br />

CVC <strong>and</strong> CHW agreement may be out<br />

dated given the new infrastructure<br />

situation<br />

Review the existing agreement with CVC<br />

Ageing reticulation systems needs<br />

constant maintenance<br />

Continue sewerage rehabilitation program<br />

<strong>Water</strong> mains ageing<br />

Continue water mains renewals program<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 25


4 Mission Statement<br />

CHW mission statement <strong>for</strong> water supply <strong>and</strong> sewerage services is:<br />

“To provide a long term sustainable <strong>and</strong> reliable water supply <strong>and</strong> sewerage services to the<br />

community which meets legislative, statutory <strong>and</strong> best-practice management requirements.<br />

These services will protect community, health <strong>and</strong> the environment.”<br />

This mission statement states concisely the CHW role in the provision of water supply <strong>and</strong><br />

sewerage services to the customers <strong>and</strong> the key factors that should guide CHW’s actions.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 26


5 Levels of Service<br />

Levels of service are an expansion of the Mission Statement. The levels of service define the<br />

st<strong>and</strong>ard required that CHW aims to provide to its water supply <strong>and</strong> sewerage customers.<br />

Below are CHW long term LOS targets adopted <strong>for</strong> provision of water supply <strong>and</strong> sewerage<br />

services <strong>and</strong> their current per<strong>for</strong>mance.<br />

The levels of service below were reviewed <strong>and</strong> finalised in a workshop with Council staff in<br />

July 2011.<br />

Table 4: Levels of Service <strong>for</strong> <strong>Water</strong> <strong>Supply</strong><br />

Description Unit LOS<br />

per<strong>for</strong>mance<br />

Long Term<br />

Target<br />

Service Provided<br />

Time to provide an individual connection to<br />

water supply in serviced area<br />

Working Days 10 10<br />

Availability of <strong>Supply</strong><br />

Normal Quantity Available<br />

Domestic peak day dem<strong>and</strong> (from reservoirs) L/tenement/d 2300 2300<br />

Domestic annual dem<strong>and</strong> kL/tenement/a 200 200<br />

Pressure<br />

Building site with 12 metres minimum head % of service area 99% 99%<br />

Building site with 20 metres minimum head % of service area 90% 95%<br />

Maximum static pressure Meters head 100 100<br />

Consumption Restrictions in Droughts (5:10:10 Rule)<br />

Average duration<br />

No. months in 10 year<br />

period<br />

0 5<br />

Average frequency<br />

No. times in<br />

10 year period<br />

1 1<br />

Levels of restrictions % of normal usage 90%* 90%<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 27


Description Unit LOS<br />

per<strong>for</strong>mance<br />

Long Term<br />

Target<br />

<strong>Supply</strong> Interruptions<br />

Planned:<br />

Notice to industrial customers Minimum Number of days 1 3<br />

Maximum duration Hours 8 8<br />

Unplanned:<br />

Maximum duration Hours 8 8<br />

Total frequency of interruptions No./year/ 1000<br />

connections<br />

20 30<br />

Fire Fighting<br />

Compliance with Building Code of Australia<br />

<strong>and</strong> NSW Fire Brigade requirements - TBA<br />

% area 100% 100%<br />

<strong>Water</strong> Quality<br />

Compliance with health related criteria of<br />

ADWG guidelines 2004<br />

% compliance 100% 100%<br />

<strong>Water</strong> Quality complaints Complaints / 1000<br />

customers<br />

4 2<br />

Average Response Times<br />

(Time to have staff on site or answer inquiry)<br />

System Failure Hours 1 2<br />

Other problems<br />

Respond to 95% of verbal inquiry Working days 1 1<br />

Respond to 95% of written inquiry Working days 10 10<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 28


Table 5: Levels of Service <strong>for</strong> <strong>Sewerage</strong><br />

Description Unit LOS<br />

per<strong>for</strong>mance<br />

Long Term<br />

Target<br />

Availability of Service<br />

Time to provide an individual connection to<br />

sewerage in serviced area<br />

working days 10 10<br />

Industrial connections licensed under<br />

Council's Trade Waste Policy<br />

% licensed 98 100<br />

Systems Failures<br />

Frequency of Failures<br />

Reportable dry weather system overflows to<br />

environment<br />

Number per year 4 4<br />

Sewer main blockages <strong>and</strong> chokes<br />

All systems<br />

Number per year per<br />

100km<br />

37 40<br />

Average Time to Rectify Failure<br />

Service restored<br />

All systems Hours 2 2<br />

Clean Up Spills<br />

All systems Hours 2 2<br />

Average Response Times (Time to have staff on site or answer inquiry)<br />

System Failures<br />

Major failure with significant consequences or<br />

affecting multiple properties<br />

Hours 1 2<br />

Minor failure affecting only a single property Hours 1 2<br />

Other Problems<br />

Verbal inquiry Working days 1 1<br />

Written inquiry Working days 10 10<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 29


Description Unit LOS<br />

per<strong>for</strong>mance<br />

Long Term<br />

Target<br />

Odours<br />

All systems<br />

Complaints No./year/1000 properties 2 1<br />

Effluent Discharge<br />

All systems<br />

Compliance with license conditions % compliance 98 100<br />

Hydraulic Loadings (Peak Wet Weather Flow/Average Dry Weather Flow - individual catchment)<br />

All systems - 5.5 7<br />

Effluent Reuse<br />

Reclaimed water quality compliance with<br />

National Guidelines <strong>for</strong> irrigated Food Crops<br />

% compliance 100 100<br />

Effluent Volume Re-used % of total volume 16 20<br />

Note: the Levels of Service are the targets which Council aims to meet, they are not intended as a <strong>for</strong>mal<br />

customer contract.<br />

The LOS listed above are the primary driving <strong>for</strong>ce <strong>for</strong> the water supply <strong>and</strong> sewerage authority.<br />

These LOS will largely shape the objectives <strong>and</strong> requirements <strong>for</strong> operation, maintenance <strong>and</strong><br />

provision of capital works within CHW’s water supply <strong>and</strong> sewerage schemes. Achievement of<br />

target levels of service is the primary objective of the system.<br />

<strong>Water</strong> <strong>Supply</strong><br />

CHW has been receiving an average of 4 complaints about water quality per 1000 properties.<br />

Council's target is to get a maximum of 2 complaints per 1000 properties. Council has recently<br />

noticed a drop in these complaints following the construction of water treatment plant. This will<br />

continue to be monitored by Council. Below are some further actions to address this issue.<br />

CHW needs to move the lime dosing from the Karangi Dam to the Karangi <strong>Water</strong> Treatment Plant<br />

to ensure the pH levels remain within the ADWG acceptable values.<br />

CHW advised that there is a potential <strong>for</strong> new mines in the Nymboida <strong>and</strong> Orara Catchments<br />

which may affect the water quality on the rivers. If the mines are commissioned, CHW may have<br />

to take further actions to ensure the potable water quality is not affected or remains within the<br />

ADWG guidelines requirements. This potential issue <strong>and</strong> preventative actions to avoid any water<br />

contamination from the mines could be included in the Drinking <strong>Water</strong> Quality Management<br />

Plan.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 30


<strong>Sewerage</strong><br />

Sawtell STP will be decommissioned by mid 2013. CHW has advised that planning <strong>and</strong><br />

construction of the pump station <strong>and</strong> rising main to achieve this is underway.<br />

OBJECTIVE 1 – LEVELS OF SERVICE<br />

Meet Levels of Service<br />

PERFORMANCE TARGET<br />

Meet all levels of service targets 100% of the time<br />

STRATEGIES<br />

1. Monitor per<strong>for</strong>mance against levels of service<br />

2. Identify deficiencies <strong>and</strong> implement remedial actions<br />

ACTIONS Responsible Target date Cost ($’000)<br />

1. Improve the existing monitoring system STC Dec 11 In budget<br />

2. Review per<strong>for</strong>mance <strong>and</strong> prepare<br />

report<br />

STC<br />

Annually<br />

October<br />

In budget<br />

Starting 2012<br />

3. Identify the remedial actions, allocate<br />

in budget<br />

EMO Annually by 30<br />

June<br />

Starting in 2012<br />

In budget<br />

4. Implement remedial actions in<br />

accordance with budget<br />

EMO/MSI<br />

Annually<br />

in July<br />

In budget<br />

Starting 2012<br />

5. Prepare Drinking <strong>Water</strong> Quality<br />

Management Plan<br />

MSI<br />

By December<br />

2012<br />

50<br />

Legend:<br />

STC<br />

EMO<br />

MSI<br />

MULP<br />

MWT<br />

MD<br />

MSP<br />

DCS<br />

Senior Technical Co-ordinator<br />

Executive Manger Operations<br />

Manager <strong>Strategic</strong> Infrastructure<br />

Manager L<strong>and</strong> Use Planning<br />

Manager <strong>Water</strong> Treatment<br />

Manager Distribution<br />

Manager Special Projects<br />

Director City Services<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 31


6 Service Delivery<br />

This section looks at Council’s current service delivery methods <strong>and</strong> how Council plans to deliver<br />

these services in the future.<br />

The delivery of water supply <strong>and</strong> sewerage services is the responsibility of the Coffs Harbour<br />

<strong>Water</strong>, part of CHCC’s Engineering Department.<br />

The majority of operations <strong>and</strong> maintenance tasks are carried out by Council staff. Some<br />

maintenance is already contracted out. Council has adopted resource sharing as a means of<br />

reducing operation costs. Management of major projects, design, construction <strong>and</strong> specialist<br />

services are managed by Council staff using a variety of procurement options<br />

The following are some current <strong>and</strong> future service delivery options which are considered by<br />

Council.<br />

6.1 Private Sector Resources<br />

6.1.1 Contracting Out<br />

Council will consider contracting out some services, where it can be demonstrated that they are<br />

cost effective <strong>and</strong> appropriate.<br />

6.1.2 Private Sector Involvement in Scheme Development<br />

Council would consider private sector involvement <strong>for</strong> large capital development. Several<br />

methods used <strong>for</strong> private involvement are considered by CHW. These are listed below.<br />

Model<br />

Main points<br />

Design <strong>and</strong> Construct • Traditional method.<br />

• Council bears most of the risk.<br />

• Council finances construction.<br />

• Council operates <strong>and</strong> maintains.<br />

Contracting out<br />

operations <strong>and</strong><br />

maintenance<br />

Design, build <strong>and</strong><br />

operate (DBO)<br />

• Some minor maintenance is already contracted by Council.<br />

• Contractor is responsible <strong>for</strong> defined functions.<br />

• Level of risk transfer is dependent on type of contract.<br />

• Council owns the assets, <strong>and</strong> maintains a fair degree of risk.<br />

• Council finances construction.<br />

• Contractor designs, builds <strong>and</strong> operates <strong>for</strong> a long term (typically 25<br />

years).<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 32


Model<br />

Build, own operate<br />

<strong>and</strong> transfer (BOOT)<br />

Delegated<br />

management<br />

Concession<br />

(franchise)<br />

Main points<br />

• Contractor builds, owns <strong>and</strong> operates <strong>for</strong> a long term (typically 25 years).<br />

• Most of the risk is transferred to the contractor.<br />

• Optional transfer to Council at the end of period.<br />

• Council retains ownership.<br />

• Contractor takes over operations <strong>and</strong> management<br />

• Contractor is responsible <strong>for</strong> asset management <strong>and</strong> makes<br />

recommendations <strong>for</strong> capital works.<br />

• Fair degree of risk transfer.<br />

• Council retains ownership.<br />

• Contractor takes over operations <strong>and</strong> management (including customer<br />

service <strong>and</strong> billing)<br />

• Contractor is responsible <strong>for</strong> asset management <strong>and</strong> capital works.<br />

• Payment is a single tariff, increasing with inflation.<br />

• High degree of risk transfer.<br />

At this stage, Council has identified the following advantages <strong>and</strong> disadvantages of private<br />

sector involvement:<br />

Advantages Council can transfer some of the risk to the private sector operator, thus<br />

increasing the certainty of the cost of service to customers. The extent of<br />

the risk transfer is dependent on the selected option.<br />

<br />

<br />

Private sector finances some of the investment.<br />

Cost reduction from efficiency gains.<br />

Disadvantages Council would lose some control over operation.<br />

<br />

<br />

<br />

Asset base may degrade through insufficient maintenance, as operator<br />

may have a short-term view.<br />

Cost of service may rise, because private sector operator would have to<br />

cover the cost of risk <strong>and</strong> allow <strong>for</strong> profit <strong>and</strong> tax.<br />

Some of the models have a long term commitment <strong>and</strong> cannot be easily<br />

reversed if unsuccessful.<br />

Corporatisation<br />

In 1995 the Council of Australian Governments (COAG) ratified the National Competition Policy,<br />

with one of the aims being to “encourage efficient public sector service provision by exposing<br />

public business functions to competition, when appropriate.” The application of this policy to<br />

Local Government has a number of implications <strong>for</strong> Council as set out in the publication; “NSW<br />

Government Policy Statement on the Application of National Competition Policy to Local<br />

Government.”<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 33


6.2 Resource Sharing<br />

Council has adopted resource sharing as a means of reducing costs of operating the water<br />

supply <strong>and</strong> sewerage systems. Following are examples of resource sharing already practiced by<br />

Council within the water supply <strong>and</strong> sewerage systems:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

CHW Mechanical/Electrical workshops <strong>and</strong> plant are shared across several Council<br />

business areas, <strong>and</strong> also with other councils.<br />

The centrifuge, used <strong>for</strong> dewatering sewage biosolids (sludge), is hired out to other<br />

Councils.<br />

The Council Environmental Laboratory is shared across several Council’s business areas,<br />

<strong>and</strong> also provides services to external customers.<br />

The Purchasing <strong>and</strong> Stores section is shared across all of Council’s business areas.<br />

The Finance <strong>and</strong> Administration section is shared across all of Council's business areas.<br />

The <strong>Water</strong> <strong>Supply</strong> <strong>and</strong> <strong>Sewerage</strong> Sections provide services to other areas of Council <strong>and</strong><br />

to other Councils in the vicinity.<br />

Coffs Harbour <strong>Water</strong> worked in partnership with Clarence Valley Council (CVC) to<br />

construct the Regional <strong>Water</strong> <strong>Supply</strong> Scheme (RWSS) to provide a safe <strong>and</strong> secure water<br />

supply into the future <strong>for</strong> the respective communities. The RWSS is based on the<br />

Nymboida River <strong>and</strong> Shannon Creek Dam, an off-stream storage facility built near the<br />

village of Coutts Crossing in the CVC area.<br />

Under the Regional <strong>Water</strong> <strong>Supply</strong> Scheme, Council will share a water source, a dam <strong>and</strong><br />

associated facilities with CVC, as well as participating in a Regional <strong>Water</strong> Efficiency<br />

Plan.<br />

CHCC provides trade waste inspectors & expertise to Bellingen Shire Council.<br />

Council is considering entering into a <strong>for</strong>mal regional Alliance with neighbouring Councils<br />

to facilitate skill <strong>and</strong> resource sharing. This would enhance Council's ability to address<br />

any emerging issues that are on the national water agenda.<br />

CHCC relocated water <strong>and</strong> sewer main <strong>for</strong> the RTA & Leighton Fulton Hogan to facilitate<br />

amplification of the Pacific Highway from Sapphire to Woolgoolga.<br />

Council will continue to review options <strong>for</strong> resource sharing both with other business areas within<br />

Council <strong>and</strong> with external organisations.<br />

6.3 Impact on Planning<br />

LWU's are recommended to examine their arrangements <strong>for</strong> providing services in the long term.<br />

CHW has agreements <strong>for</strong> the provision of water services with CVC <strong>and</strong> Essential Energy; there<strong>for</strong>e<br />

CHW should make provisional decisions to ensure the safe <strong>and</strong> reliable supply of services.<br />

CHW recognizes the need to review the existing agreement with CVC in order to address the<br />

new infrastructure situation.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 34


7 Customer Service Plan<br />

7.1 Review of Levels of Service<br />

The adopted Levels of Service <strong>for</strong> water supply <strong>and</strong> sewerage businesses (see section 5) are seen<br />

as reflecting local community aspirations.<br />

It should be noted that, if required, LOS can be negotiated with customers. LOS covered by<br />

statutory <strong>and</strong> licence requirements can only be negotiated if the customers require LOS higher<br />

than the regulatory requirements. CHW should advice their customers that LOS are negotiable<br />

on the basis that higher LOS will require higher Typical Residential Bills (TRBs).<br />

7.2 Areas Serviced<br />

This part of the plan looks at Council’s intentions <strong>for</strong> providing services to areas that are currently<br />

without water supply <strong>and</strong> sewerage services. Council has strategies <strong>for</strong> extending services based<br />

on planning <strong>and</strong> growth strategies.<br />

Table 6 provides a list of all CHCC towns’ current <strong>and</strong> projected population, their current services<br />

provided <strong>and</strong> whether the present facilities are satisfactory or not.<br />

New development will have water supply <strong>and</strong> sewerage services provided <strong>and</strong> financed by the<br />

developer & S64 plans.<br />

Table 6: Areas Serviced<br />

Area Population Average Annual <strong>Water</strong> <strong>Supply</strong> <strong>Sewerage</strong><br />

2011 2041 Growth Rate<br />

Coffs Harbour 25,655 38,704 1.27% Satisfactory Satisfactory<br />

Boambee East 5,468 6,445 0.33% Satisfactory Satisfactory<br />

Bonville, , Boambee 3,928 7,492 2.03% Satisfactory Satisfactory<br />

Sawtell 3,845 4,824 0.53% Satisfactory Satisfactory<br />

Toormina 6,805 8,032 0.35% Satisfactory Satisfactory<br />

North Boambee Valley 1,776 4,683 6.98% Satisfactory Satisfactory<br />

Korora – Sapphire Beach 4,347 7,254 2.42% Satisfactory Satisfactory<br />

Moonee Beach 1,419 4,931 5.17% Satisfactory Satisfactory<br />

S<strong>and</strong>y Beach - Emerald<br />

Beach<br />

4,576 6,321 0.40%<br />

Satisfactory<br />

Satisfactory<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 35


Area Population Average Annual <strong>Water</strong> <strong>Supply</strong> <strong>Sewerage</strong><br />

2011 2041 Growth Rate<br />

Woolgoolga 5,209 7,748 1.17% Satisfactory Satisfactory<br />

Northern Beaches<br />

(encompasses the<br />

localities of Arrawarra,<br />

Arrawarra Headl<strong>and</strong>,<br />

Corindi Beach, Mullaway,<br />

Red Rock <strong>and</strong> Safety<br />

Beach)<br />

3,995 6,423 2.05% Arrawarra, Corindi Beach, Mullaway<br />

<strong>and</strong> Safety Beach have satisfactory<br />

services.<br />

Red Rock – Not likely to be serviced<br />

(community opposition)<br />

Rural West 4,758 5,884 0.29%<br />

Brooklana N/A N/A<br />

Bucca N/A N/A<br />

Coramba Satisfactory N/A<br />

Karangi N/A N/A<br />

Lowanna N/A N/A<br />

Nana Glen Satisfactory N/A<br />

Ulong N/A N/A<br />

Upper Corindi N/A N/A<br />

Upper Orara N/A N/A<br />

Coffs Harbour City parts of<br />

Barcoongere, Dirty Creek,<br />

Halfway Creek <strong>and</strong> Sherwood<br />

N/A – Service not available<br />

Source: CHCC population <strong>for</strong>ecast website [accessed 19 Oct 2011]<br />

http://<strong>for</strong>ecast2.id.com.au/Default.aspxid=360&pg=5110<br />

N/A<br />

N/A<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 36


OBJECTIVE 2 – Areas Serviced<br />

Provide water/sewerage services to all urban release areas.<br />

PERFORMANCE TARGET<br />

Provide 100% of the urban release areas with water <strong>and</strong> sewerage services<br />

STRATEGIES<br />

1. Ensure appropriate plans <strong>and</strong> policies in place<br />

2. Identify future urban release areas <strong>and</strong> plan infrastructure<br />

3. Include in capital works <strong>and</strong> financial plan.<br />

ACTIONS Responsible Target date Cost ($’000)<br />

1. Prepare the local growth management<br />

strategy<br />

MLUP 5 yearly 2013 In budget<br />

2. Prepare Local Environmental <strong>Plans</strong><br />

(Planning proposals)<br />

MLUP<br />

Annually<br />

TBA (different<br />

growth areas)<br />

In budget<br />

3. Implement CHCC capital works<br />

findings of the strategies <strong>for</strong> urban<br />

release areas<br />

MSI Ongoing In budget<br />

4. Develop DCP MLUP Annually<br />

In budget<br />

TBA (different<br />

growth areas)<br />

7.3 Dem<strong>and</strong> Management<br />

CHW has implemented permanent Level One water restrictions in the Coffs Harbour Local<br />

Government Area since 19 June 2004.<br />

The main impact of Level One water restrictions is:<br />

<br />

<br />

<br />

<br />

Sprinklers <strong>and</strong> unattended hoses are banned between 8.00am <strong>and</strong> 4.00pm.<br />

Building maintenance allowed with trigger nozzle hoses or pressure cleaners.<br />

Hoses can only be used to wash driveways, paved areas <strong>and</strong> roofs <strong>for</strong> health or safety<br />

reasons. Pressure cleaners are allowed.<br />

Car washing is allowed providing, where practical, the runoff is onto a lawn <strong>and</strong> not<br />

down the drain.<br />

(Source: http://www.coffsharbour.nsw.gov.au/places-<strong>for</strong>-living/drinking-watersupply/Pages/water-restrictions.aspx,<br />

accessed 19 Oct 2011)<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 37


CHW also has a Dem<strong>and</strong> Management Plan in place since 2006. This plan includes projection of<br />

the water dem<strong>and</strong>, <strong>and</strong> strategies to reduce wastage of water. A variety of water efficiency<br />

programs have been in place in the service area since 1989. These programs have acted to<br />

maintain an almost uni<strong>for</strong>m level of total consumption in the service area despite the fact that<br />

the population of the service area is growing.<br />

The NSW LWUs statewide median average annual residential water supply in 2009/10 was<br />

175kL/property; <strong>for</strong> coastal areas it was 150 kL/property. The Coffs Harbour 2010/11 average<br />

annual residential water supplied was 159 kL/property; slightly higher than the state wide median<br />

<strong>for</strong> 09/10. The CHW average annual residential dem<strong>and</strong> figures <strong>for</strong> the past 6 years are provided<br />

in table below. It should be noted that some of the coastal areas had restrictions in place, which<br />

distorts the unrestricted dem<strong>and</strong>.<br />

Table 7: Coffs Harbour <strong>Water</strong> Annual <strong>Water</strong> Supplied<br />

2005/06 2006/07 2007/08 2008/09 2009/10 2010/11<br />

Average Annual Residential<br />

<strong>Water</strong> Supplied (kL/property)<br />

184 178 169 165 186 159<br />

Source: National Per<strong>for</strong>mance Report 2009-10_Part B<br />

CHW has implemented the following measures:<br />

<br />

<br />

<br />

<br />

Implementation of best practice pricing<br />

Promotion of the BASIX framework, including alternate water sources such as rainwater<br />

tanks <strong>and</strong> water efficient appliances such as low flow showerheads<br />

School, business <strong>and</strong> community education<br />

Rebate on installing dual flush toilets <strong>and</strong> showerhead retrofit<br />

Figures in Table 7 indicate that when the Dem<strong>and</strong> Management Plan was implemented in 2006<br />

CHW had significant reduction in residential annual water consumption in the following two<br />

years. However in 2009/10 the annual water supplied per property increased. In 2010/11 the<br />

annual water supplied per property reduced significant, probably because it was a very wet<br />

year when compared to the previous years. It is recommended that CHW’s continue the<br />

implementation of dem<strong>and</strong> management actions <strong>and</strong> review the dem<strong>and</strong> management plan<br />

<strong>and</strong> or the dem<strong>and</strong> management measures in place to ensure the measures are still<br />

appropriate. The Best-Practice Management guidelines requires each LWU to review its dem<strong>and</strong><br />

management measures every 2 years to ensure that it has an appropriate balance between<br />

dem<strong>and</strong> <strong>and</strong> supply-side investment. This is considered an issue that needs to be addressed in<br />

the near future.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 38


OBJECTIVE 3 – Dem<strong>and</strong> Management (<strong>Water</strong> <strong>Supply</strong>)<br />

Maintain unrestricted per capita consumption.<br />

PERFORMANCE TARGET<br />

Unrestricted dem<strong>and</strong> is no more than 200 kL per household per year.<br />

STRATEGIES<br />

Ensure continuation of dem<strong>and</strong> management strategy.<br />

ACTIONS Responsible Target date Cost ($’000)<br />

1. Continue water efficiency measures EMO ongoing In budget<br />

2. Review <strong>and</strong> update dem<strong>and</strong><br />

management plan/measures<br />

EMO July 2012<br />

then 2 yearly<br />

10<br />

7.4 Infiltration Management<br />

Council has a problem of high inflow <strong>and</strong> infiltration of stormwater into the sewerage system.<br />

While certain amount of inflow <strong>and</strong> infiltration are considered acceptable (<strong>and</strong> facilities are<br />

designed with capacity to accommodate the extra flow), some areas are experiencing<br />

excessive inflow <strong>and</strong> infiltration, which exceed the capacity of the pipes <strong>and</strong> pumping stations<br />

<strong>and</strong> may result in overflows.<br />

Infiltration <strong>and</strong> inflow are the result of an ageing system. The stormwater enters the system<br />

through cracked or broken pipes, dislocated pipe joints (often due to tree roots), broken<br />

manholes <strong>and</strong> illegal connections. Council's rehabilitation program is addressing these problems,<br />

<strong>and</strong> is aimed at bringing the system components back to an acceptable condition.<br />

OBJECTIVE 4 – Infiltration Management (<strong>Sewerage</strong>)<br />

Eliminate uncontrolled overflows <strong>and</strong> excessive pumping due to high wet weather flows.<br />

PERFORMANCE TARGET<br />

Reduce hydraulic sewage loading to levels of services targets.<br />

STRATEGIES<br />

Implement inflow/ infiltration reduction program in accordance with investigation report<br />

ACTIONS Responsible Target date Cost ($’000)<br />

1. Investigate <strong>and</strong> eradicate inflow <strong>and</strong><br />

infiltration in sewerage system (use telemetry<br />

system)<br />

EMO<br />

December<br />

2018<br />

In budget<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 39


7.5 Reclaimed <strong>Water</strong><br />

Coffs Harbour <strong>Water</strong> Reclamation Plant provides up to 21 megalitres of reclaimed water daily <strong>for</strong><br />

irrigating crops <strong>and</strong> sporting fields <strong>and</strong> <strong>for</strong> dust suppression in the region. Coffs Harbour <strong>Sewerage</strong><br />

Strategy Environment Impact Statement was prepared in 2000. CHW obtained Section 60<br />

Approval in 2006 <strong>for</strong> the first stage of the reclaimed water project.<br />

Reclaimed water pipeline stage 2 is scheduled to be completed in 2012/13. The pipeline will<br />

provide an alternative supply of water <strong>for</strong> municipal irrigation <strong>and</strong> agricultural needs <strong>and</strong> in<br />

certain areas may reduce the dem<strong>and</strong> on the potable supply.<br />

Council is currently preparing a recycle water management plan to cover the whole scheme<br />

including the pipeline stage 2 mentioned above. NSW Office of <strong>Water</strong> requires the local water<br />

utilities to obtain Section 60 Approval <strong>for</strong> reclaimed water usage prior to commissioning of the<br />

scheme. CHW recognizes the need to update the existing Section 60 to include the extension of<br />

the recycled water scheme. Some recycled water agreements are out of date <strong>and</strong> need to be<br />

updated.<br />

Currently the biosolids from the water reclamation plant are managed by a contractor. CHW<br />

should have a biosolids management emergency plan in place in case the contractor decides<br />

to terminate the contract.<br />

OBJECTIVE 5 – Reclaimed <strong>Water</strong><br />

Maximise reclaimed water use where feasible<br />

PERFORMANCE TARGET<br />

Maximise reuse to achieve reuse of 20% of effluent in 5 years<br />

STRATEGIES<br />

Manage the reuse scheme effectively.<br />

ACTIONS Responsible Target date Cost ($’000)<br />

1. Finalize reclaimed water management<br />

plan<br />

MSI June 2012 In budget<br />

2. Investigate charging <strong>for</strong> recycled water MSI July 2014 Income - nil<br />

cost<br />

3. Review <strong>and</strong> update recycled water<br />

agreements<br />

MSI June 2012 In Budget<br />

4. Prepare biosolids management<br />

emergency plan<br />

TBA by CHCC TBA by CHCC TBA by CHCC<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 40


7.6 Pricing<br />

The primary purpose of water supply <strong>and</strong> sewerage pricing is to determine fair pricing of services<br />

which achieve full cost recovery <strong>and</strong> provide strong pricing signals to enable each customer to<br />

balance the benefits <strong>and</strong> costs of using the utility’s services.<br />

CHW complies with the 11 requirements <strong>for</strong> pricing <strong>and</strong> regulation of water supply, sewerage<br />

<strong>and</strong> trade waste, of the NSW Office of <strong>Water</strong> Best-Practice Management Guidelines.<br />

<strong>Water</strong> <strong>Supply</strong><br />

1 Full cost recovery without significant<br />

cross subsidies<br />

<strong>Sewerage</strong> <strong>and</strong> Trade Waste<br />

1 Full cost recovery without significant cross<br />

subsidies<br />

2 Complying residential charges with<br />

pay-<strong>for</strong>-use water pricing,<br />

independent of l<strong>and</strong> value<br />

2 Complying residential charges, independent<br />

of l<strong>and</strong> value<br />

3 Complying non-residential charges 3 Complying non-residential charges<br />

4 Development Servicing Plan with<br />

commercial developer charges<br />

4 Development Servicing Plan with commercial<br />

developer charges<br />

5 At least 75% of residential revenue is<br />

from water usage charges<br />

5 Complying trade waste <strong>and</strong> fees charges<br />

6 Appropriate trade waste regulation policy<br />

<strong>and</strong> approvals<br />

Assessment of <strong>Water</strong> <strong>Supply</strong> Charges<br />

The NSW Office of <strong>Water</strong> has developed best-practice guidelines <strong>for</strong> water supply <strong>and</strong><br />

sewerage. With respect to pricing of water supply services, the Office of <strong>Water</strong> is keen to send<br />

pricing signals to customers. This is achieved through:<br />

<br />

<br />

High usage charge, to empower customers to reduce their water bill by reducing<br />

consumption. For utilities of CHCC size, the requirement is that 75% of revenue from<br />

residential charges is generated from usage charges.<br />

Read the water meters 4 times a year, to capture the seasonal variation <strong>and</strong> provide<br />

customers with more accurate reading.<br />

The CHCC 2009/10 TBL <strong>Water</strong> <strong>Supply</strong> Per<strong>for</strong>mance Report states that the residential revenue from<br />

usage charges was 76% of the residential bills. CHCC tariff complies with the both requirements<br />

mentioned above.<br />

Assessment of <strong>Sewerage</strong> Charges<br />

The best-practice management guidelines require a two-part tariff <strong>for</strong> non-residential customers.<br />

CHW non-residential charges are a two-part tariff. Access charges are based on a sewer<br />

discharge factor <strong>and</strong> water meter factor. The usage charge can be estimated using the sewer<br />

discharge factor <strong>and</strong> the metered water consumption.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 41


7.6.1 <strong>Water</strong> <strong>Supply</strong> Pricing<br />

CHW water supply tariff is a two-part tariff, comprising an access charge <strong>and</strong> a usage charge:<br />

Customer Type Access charge per annum (2011/12)<br />

Residential<br />

Non-residential<br />

$131<br />

Vacant Properties<br />

Non-residential Meter Factors:<br />

Meter Size (mm) Factor Amount Meter Size<br />

(mm)<br />

Factor<br />

Amount<br />

015 1.0 $131 065 10.6 $1,388<br />

020 1.0 $131 080 16.0 $2,096<br />

025 1.6 $209 100 25.0 $3,275<br />

032 2.6 $340 150 56.3 $7,375<br />

040 4.0 $524 200 100.0 $13,100<br />

050 6.3 $825<br />

Customer Type Usage Charge (2011/12)<br />

Residential properties<br />

$2.36/kL <strong>for</strong> usage of up to 1 kL/day<br />

(365 kL/year)<br />

$3.54/kL <strong>for</strong> usage above 1 kL/day<br />

(365 kL/year)<br />

Non-residential<br />

$2.36/kL apart from fire fighting<br />

$7.08/kL non fire usage on a fire service<br />

consumption charge<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 42


7.6.2 <strong>Sewerage</strong> Pricing<br />

Customer Type Access Charge (2011/12)<br />

Residential $720<br />

Non-residential<br />

SDF x MF x AC<br />

Vacant L<strong>and</strong> $496<br />

SDF = Sewer Discharge Factor<br />

MF = Total water meter factor<br />

AC = Access Charge = $720<br />

Customer Type Usage Charge (2011/12)<br />

Non-residential By calculation = SDF x KLS x $1.85<br />

KLS = Volume of water used<br />

Trade Waste Charges<br />

CHW has adopted a trade waste policy in April 2007. Council has a Trade Waste Policy<br />

document (March 2007), which outlines criteria <strong>for</strong> approval to dispose of trade waste into<br />

Council's sewerage system <strong>and</strong> matters relating to trade waste approvals. Current charges are<br />

listed in Council's adopted fees <strong>and</strong> charges available on Council's website.<br />

OBJECTIVE 6 – Pricing<br />

Have a pricing system <strong>for</strong> water <strong>and</strong> sewerage which is sustainable <strong>and</strong> meets Best-Practice<br />

PERFORMANCE TARGET<br />

Meet 100% of best-practice pricing guidelines annually<br />

STRATEGIES<br />

Review <strong>and</strong> update pricing structure annually<br />

ACTIONS Responsible Target date Cost ($’000)<br />

1. Review <strong>and</strong> update DSPs MSI 5 yearly<br />

$50<br />

Next 2015<br />

2. Review budget <strong>and</strong> adjust pricing MSI/EMO/EMF Annually In budget<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 43


7.7 Customer Satisfaction<br />

To ensure that the customers are satisfied with CHW water supply <strong>and</strong> sewerage services, it is<br />

important to maintain good communication with customers. Council should establish effective<br />

process to manage the interaction with customers <strong>and</strong> ensure the levels of service targets are<br />

met. In general, customer satisfaction can be maintained by providing a quality service, keeping<br />

customers in<strong>for</strong>med of the LWU intentions <strong>and</strong> responding to customers <strong>and</strong> community needs.<br />

In 2009/10 Council received 10 water service complaints <strong>and</strong> 4 sewerage service complaints per<br />

1000 properties. (Source: CHCC 2009/10 TBL Per<strong>for</strong>mance Reports).<br />

Below are CHW objective <strong>and</strong> targets to maintain good customer relations.<br />

OBJECTIVE 7 – Customer Satisfaction<br />

Customers are satisfied with the service provided.<br />

PERFORMANCE TARGET<br />

Less than 20 complaints (water supply <strong>and</strong> sewerage services) per 1000 properties per year<br />

STRATEGIES<br />

1. Enhance customer request system<br />

2. Implement remedial actions to reduce customers complaints<br />

ACTIONS Responsible Target date Cost ($’000)<br />

1. Customize customer request system to<br />

identify complaints<br />

STC By June 2012 In budget<br />

2. Review complaints <strong>and</strong> take appropriate<br />

action<br />

MWT/MD Ongoing In budget<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 44


7.8 Community Consultation<br />

Council is committed to consulting its water supply <strong>and</strong> sewerage customers regularly to keep<br />

them in<strong>for</strong>med of developments <strong>and</strong> to get feedback on major projects.<br />

The aims of community consultation are:<br />

<br />

<br />

<br />

<br />

To ensure ownership of issues by the community, to gain community agreement that<br />

Council action is required <strong>and</strong> ensure that the costs associated with such actions are<br />

understood<br />

To ensure that the concerns of the community, particularly social <strong>and</strong> environmental<br />

concerns, have been taken into account<br />

To allow the community to propose options that they want evaluate<br />

To enable the community to be satisfied that the CHCC have made a decision after a<br />

proper evaluation of the issues<br />

The community of Coffs Harbour has a vital role to play not only in planning <strong>for</strong> the future of the<br />

city, but also in partnering with government <strong>and</strong> non-government agencies to identify <strong>and</strong><br />

implement initiatives that contribute to the sustainability of Coffs Harbour's economy, lifestyle <strong>and</strong><br />

environment.<br />

Community engagement <strong>and</strong> participation is essential <strong>for</strong> the development <strong>and</strong> implementation<br />

of the Coffs Harbour 2030 Community <strong>Strategic</strong> Plan. CHCC has prepared a Community<br />

Engagement Strategy <strong>for</strong> the development <strong>and</strong> review of the 2030 Community <strong>Strategic</strong> Plan,<br />

which promotes opportunities <strong>for</strong> public participation <strong>for</strong> the ongoing review <strong>and</strong><br />

implementation of this plan. In summary this Community Engagement Strategy provides:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Objectives <strong>for</strong> Strategy<br />

Reference to International Association <strong>for</strong> Public Participation (IAP2): best practice <strong>and</strong><br />

legislative requirements<br />

NSW Government definition of social justice principles<br />

Coffs Harbour City Council’s adopted principles <strong>for</strong> the Community <strong>Strategic</strong> Plan<br />

Identification of key stakeholders<br />

Roles <strong>and</strong> responsibilities in regards to engagement<br />

A record of the community engagement techniques employed to develop the Coffs<br />

Harbour 2030 Community Vision<br />

A record of the community engagement techniques to develop the draft Coffs Harbour<br />

2030 Community <strong>Strategic</strong> Plan <strong>and</strong> to finalize the plan <strong>for</strong> adoption by Council<br />

An outline of the activities proposed <strong>for</strong> the implementation of the Community <strong>Strategic</strong><br />

Plan<br />

The proposed timeframe <strong>for</strong> the review of the Community Engagement Strategy<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 45


OBJECTIVE 8 – Community Consultation<br />

Conduct effective community consultation regarding major decisions<br />

PERFORMANCE TARGET<br />

Comply with Community Engagement Policy<br />

STRATEGIES<br />

Ensure community consultation is built into the project implementation plan.<br />

ACTIONS Responsible Target date Cost ($’000)<br />

1. See policy – actions from policy MSI Ongoing In budget<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 46


8 Environment Protection <strong>and</strong> Sustainable<br />

Development<br />

8.1 Environment Protection<br />

Council is required to undertake environmental assessment to identify direct <strong>and</strong> indirect impacts<br />

that occur from the water supply <strong>and</strong> sewerage systems. The focus should be on<br />

environmentally sensitive areas <strong>and</strong> it should consider the ecological sustainability of the<br />

operation systems.<br />

CHW has been working with the NSW Office of Environment <strong>and</strong> Heritage (OEH), other<br />

government agencies <strong>and</strong> community representatives to progress the remediation of<br />

hydrocarbon-contaminated groundwater affecting an area in Coramba.<br />

Council received grant funding from the NSW Government, via its Environmental Trust, to progress<br />

the remediation on behalf of the community. In August 2009, the NSW Minister <strong>for</strong> Planning issued<br />

Project Approval to Council's Major Project Application under Part 3A of the Environmental<br />

Planning & Assessment Act (EP&A Act), to construct <strong>and</strong> operate a groundwater remediation<br />

technology in Martin Street, Coramba.<br />

A number of reports have been written on the groundwater contamination in Coramba, the<br />

most recent is Coramba Groundwater Monitoring Report (June 2011) which describes the results<br />

of the 2011 groundwater monitoring event undertaken by WSP Environmental <strong>and</strong> Energy <strong>for</strong><br />

CHW at Coramba.<br />

The NSW Office of <strong>Water</strong> <strong>Strategic</strong> <strong>Business</strong> Plan guideline recommends Councils to prepare a<br />

Due Diligence Strategy to manage all risks to the environment.<br />

8.2 Due Diligence Requirements<br />

The NSW Protection of the Environment Operations Act 1997 (POEO) assigns substantial liability in<br />

the event of environmental harm.<br />

Due diligence implies that ef<strong>for</strong>ts should be made to anticipate hazards which may harm the<br />

environment <strong>and</strong> take all feasible steps to prevent, control <strong>and</strong> mitigate the potential of their<br />

occurrence.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 47


OBJECTIVE 9 – Environment Protection <strong>and</strong> Sustainable Development<br />

Manage the water <strong>and</strong> sewerage systems to minimize pollution, protect environmentally sensitive<br />

areas <strong>and</strong> promote ecological sustainability.<br />

PERFORMANCE TARGET<br />

Full compliance with all environmental regulatory requirements<br />

STRATEGIES<br />

1. Undertake environmental assessment of all significant <strong>and</strong> legislative activities (operational,<br />

maintenance <strong>and</strong> capital works)<br />

2. Ensure the actions comply with the determination of the environmental assessment<br />

ACTIONS Responsible Target date Cost ($’000)<br />

1. Monitor impact of existing works <strong>and</strong><br />

where the impact is not acceptable,<br />

implement works to reduce impacts.<br />

MWT/MD/MSP Ongoing In budget<br />

2. Meet all environmental licences<br />

conditions <strong>and</strong> PRP<br />

MWT/EMO/MD Ongoing In budget<br />

3. Develop water <strong>and</strong> sewerage<br />

Environmental Management System<br />

(EMS)<br />

EMO<br />

(in progress) to<br />

be completed<br />

in 2014<br />

140<br />

4. Develop <strong>and</strong> maintain a Due Diligence<br />

Program<br />

TBA by CHCC TBA by CHCC TBA by CHCC<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 48


9 Total Asset Management Plan<br />

9.1 Introduction<br />

The aim of total asset management is to provide, operate <strong>and</strong> maintain physical assets over their<br />

whole life cycle to achieve the required Levels of Service (see section 5) at the least cost, while<br />

still satisfying statutory <strong>and</strong> regulatory requirements.<br />

CHW adopted an Asset Management Policy in August 2011. The policy states that CHW is<br />

committed to:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Implementing a systematic approach to the management of its assets <strong>and</strong> ensuring that<br />

appropriate asset management practices are applied across all areas of the<br />

organization<br />

Planning, creating, operating, maintaining, renewing <strong>and</strong> disposing of assets in a manner<br />

that ensures cost effective service delivery<br />

Developing <strong>and</strong> regularly reviewing an Asset Management Strategy <strong>and</strong> Asset<br />

Management <strong>Plans</strong>, which will detail the approach taken in managing assets <strong>and</strong> which<br />

facilitate the continuous improvement of asset management practices<br />

Implementing a lifecycle approach to asset management, whereby the costs <strong>and</strong><br />

benefits of assets are considered over the asset’s life<br />

Providing the necessary resources <strong>and</strong> operational capabilities to adequately manage<br />

assets <strong>and</strong> to comply with legislative requirements<br />

Undertaking long-term planning <strong>for</strong> assets, which takes into consideration the benefits<br />

<strong>and</strong> costs to present <strong>and</strong> future generations <strong>and</strong> their ability to pay<br />

Integrating Asset Management planning with Council’s Community <strong>Strategic</strong> Plan <strong>and</strong><br />

Long Term Financial Plan<br />

The policy also states that “Council will adopt Asset Management <strong>Plans</strong> (AMPs) developed under<br />

the ‘3Rs’ framework (reason, resources <strong>and</strong> results). AMPs describe how Council will plan <strong>for</strong>,<br />

account <strong>for</strong> <strong>and</strong> manage the delivery of asset-related services. The ‘3Rs’ define the service from<br />

the perspectives of:<br />

<br />

<br />

<br />

Reason: why do we provide the service<br />

Resources: what resources are we utilizing to provide the service<br />

Results: what actual results are we achieving<br />

As described by the Integrated Planning <strong>and</strong> Reporting Framework, the process will be an<br />

ongoing one. When the ‘reason’ <strong>for</strong> <strong>and</strong> ‘resources’ available to asset management change<br />

(as a result of changes in community priorities), Council’s Asset Management <strong>Plans</strong> will be<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 49


modified to suit. The Asset Management <strong>Plans</strong> will also be reviewed over time with improved<br />

in<strong>for</strong>mation on assets (conditions <strong>and</strong> costs) <strong>and</strong> as asset condition changes over time.<br />

The underlying principle <strong>for</strong> all asset management activities will be minimisation of life cycle costs<br />

– effective, timely maintenance of assets to extend the useful life of assets <strong>and</strong> optimise renewal<br />

spending.<br />

A key driver <strong>for</strong> changes in Asset Management <strong>Plans</strong> is the improvement in Council’s asset<br />

management capability <strong>and</strong> capacity. Asset Management <strong>Plans</strong> include a ‘Gap Analysis <strong>and</strong><br />

Improvement Plan,’ that sets out priorities to improve asset management per<strong>for</strong>mance (such as<br />

targeted data collection, modelling, systems implementation).<br />

Such improvements will refine current planning <strong>and</strong> strategies, <strong>and</strong> eventually advance Council<br />

past ‘core’ asset management (prioritising work based on financial returns) into ‘advanced’<br />

asset management (prioritising work based on detailed risk analysis <strong>and</strong> optimised decision<br />

making).”<br />

9.2 Operation Plan<br />

The purpose of the Operation Plan is to ensure that the service objectives are achieved at the<br />

least cost <strong>and</strong> that the impact of any breakdowns or outages is minimised.<br />

The operation planning process begins with an operation analysis, which determines whether the<br />

existing system is capable of economically meeting its Levels of Service. Where the existing<br />

system is inadequate or where assets are found to be approaching capacity or the end of their<br />

economic life, the operation plan outputs should include a schedule of required capital works<br />

<strong>and</strong> maintenance plan.<br />

CHW has an up to date asset register which contains data such as assets description, location,<br />

size or capacity, construction year, residual life estimated <strong>and</strong> current replacement costs. This<br />

data is used <strong>for</strong> an initial overall assessment of the assets condition. However Council has<br />

identified the need <strong>for</strong> a full detailed asset condition of water supply <strong>and</strong> sewerage assets.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 50


OBJECTIVE 10 – Operations<br />

Systems operations meet adopted levels of service, regulatory requirements <strong>and</strong> achieve customer<br />

satisfaction in a sustainable manner.<br />

PERFORMANCE TARGET<br />

Systems operations deliver the specified levels of service targets.<br />

STRATEGIES<br />

1. Monitor the per<strong>for</strong>mance of the system operations<br />

2. Implement continuous improvement processes<br />

3. Operate the schemes in accordance with documented operational procedures<br />

ACTIONS Responsible Target date Cost ($’000)<br />

1. Complete the installation of the water<br />

supply <strong>and</strong> sewerage telemetry system<br />

MD/MWT July 2013 In budget<br />

2. Maintain <strong>and</strong> update the telemetry system MD/MWT Ongoing In budget<br />

3. Review <strong>and</strong> optimize sewerage quality<br />

monitoring requirements<br />

MWT<br />

Annually<br />

In June<br />

In budget<br />

4. Develop odour <strong>and</strong> septicity control<br />

strategy<br />

MD By Dec 2012 In budget<br />

5. Implement odour control action plan MD By June 2013 In budget<br />

6. Action plan (odour control) capital MD By June 2013 50<br />

7. Develop alternatives sludge management<br />

options <strong>for</strong> Coffs Harbour WRP<br />

MWT By Dec 2012 50<br />

8. Develop assets condition assessment MD/MWT By July 2014 In budget<br />

9. Prepare an Operation Plan according to<br />

the requirements of the <strong>Strategic</strong> <strong>Business</strong><br />

Planning Guidelines, May 2011<br />

EMO Dec 2012 100<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 51


9.3 Maintenance Plan<br />

The purpose of the Maintenance Plan is to support the Operation Plan by ensuring that the<br />

actual outputs, reliability <strong>and</strong> availability of the individual sub-systems, facilities <strong>and</strong> components<br />

are achieved in the most cost effective manner.<br />

As previously mentioned CHW has a service agreement with CVC <strong>for</strong> the provision of bulk water<br />

supply. CVC obtains bulk raw water supply from Essential Energy on the basis of a negotiated<br />

service agreement. According to these agreements maintenance of Essential Energy<br />

infrastructure will incur costs to CHW. CHW may consider including the conditions of these<br />

agreements in the asset management plan.<br />

OBJECTIVE 11 – Maintenance<br />

Deliver levels of service at the minimum cost.<br />

PERFORMANCE TARGET<br />

Systems maintenance delivers the specified levels of service targets.<br />

STRATEGIES<br />

Maintain the systems in accordance with maintenance schedules.<br />

ACTIONS Responsible Target date Cost ($’000)<br />

1. Develop asset criticality assessment MD/MWT By July 2013 50<br />

2. Prepare asset management plan<br />

according to <strong>Strategic</strong> <strong>Business</strong><br />

Planning Guidelines, May 2011.<br />

MSI Dec 2013 TBA by CHCC<br />

3. Implement asset management<br />

system/plan<br />

MD/MWT By July 2012 In budget<br />

9.4 Capital Works Plan<br />

The purpose of the capital works plan is to document anticipated future capital works<br />

requirements <strong>and</strong> expenditures to meet levels of service <strong>and</strong> to provide a basis <strong>for</strong> financial<br />

planning <strong>and</strong> capital budgeting.<br />

Council has recently reviewed <strong>and</strong> updated their capital works plan <strong>for</strong> water supply <strong>and</strong><br />

sewerage systems. See Appendix B.<br />

Based on an overall assessment of the sewerage assets register <strong>and</strong> on recent sewerage<br />

treatment <strong>and</strong> reticulation systems per<strong>for</strong>mance analyses, these systems appear to be<br />

inadequate. CHW has identified the need to undertake sewerage rehabilitation works to avoid<br />

EP licence penalties. CHW has allowed $1 M per year <strong>for</strong> sewerage rehabilitation works.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 52


OBJECTIVE 12 – Capital Works<br />

Capital works program provides infrastructure to deliver levels of service <strong>and</strong> satisfy growth.<br />

PERFORMANCE TARGET<br />

Infrastructure is provided as required to deliver Levels of Service <strong>and</strong> satisfy growth<br />

STRATEGIES<br />

1. Revise the capital works program with reference to the CHW <strong>Water</strong> <strong>Supply</strong> <strong>and</strong> <strong>Sewerage</strong><br />

Strategy Studies<br />

2. Construct the necessary capital works to ensure that existing <strong>and</strong> future dem<strong>and</strong>s can<br />

continue to be met at the agreed Levels of Service within financial constraints.<br />

ACTIONS Responsible Target date Cost ($’000)<br />

1. Review <strong>Water</strong> <strong>Supply</strong> <strong>and</strong> <strong>Sewerage</strong><br />

Strategy Studies<br />

MSI<br />

7 yearly<br />

Next in Dec<br />

2013<br />

600<br />

2. Finalize sewerage hydraulic models MSI By July 2013 Extra 50<br />

above<br />

budget<br />

3. Revise the capital works program utilizing<br />

the asset management system<br />

EMO/MSI/EMF Annually In budget<br />

4. Relocate lime dosing facility from Karangi<br />

Dam to Coffs Harbour Treatment Plant<br />

MSP Dec 2012 In budget<br />

5. Implement <strong>Sewerage</strong> rehabilitation<br />

program<br />

MD/MSP Ongoing In budget<br />

6. Construct reclaimed water mains as in<br />

program<br />

MSP By Dec 2014 In budget<br />

7. Decommission Sawtell STP <strong>and</strong> divert to<br />

Coffs Harbour<br />

MSP By July 2013 In Budget<br />

8. Implement water mains renewals program MSI Annually In Budget<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 53


10 Work Force Plan<br />

Coffs Harbour has a Work<strong>for</strong>ce Management Strategy (2010) which aims to <strong>for</strong>mally document<br />

strategies <strong>for</strong> ensuring a sustainable work<strong>for</strong>ce into the future. The Strategy takes into<br />

consideration the direction set by the 2030 Vision <strong>and</strong> the subsequent Operational <strong>Plans</strong> <strong>and</strong><br />

Delivery Program, <strong>and</strong> looks at strategies <strong>for</strong> the next four (4) years. Council’s staffing<br />

requirements <strong>for</strong> the Delivery Program are <strong>for</strong> well-skilled professional <strong>and</strong> other technical staff<br />

along with skilled operational <strong>and</strong> administrative staff.<br />

CHCC staff functional chart <strong>and</strong> Coffs Harbour <strong>Water</strong> Operations Organisation chart are<br />

provided in Appendix C.<br />

OBJECTIVE 13 – Work Force Planning<br />

Have the appropriate organization structure <strong>and</strong> staff with the skills necessary <strong>for</strong> the operation <strong>and</strong><br />

management of the current <strong>and</strong> future systems.<br />

PERFORMANCE TARGET<br />

Council’s obligations are met as required by levels of service, statutory requirements <strong>and</strong> the strategic<br />

business plan.<br />

All personnel have sufficient skills to carry out the tasks required by their position.<br />

STRATEGIES<br />

1. Define water <strong>and</strong> sewerage tasks <strong>and</strong> skills required to deliver LOS<br />

2. Finalize <strong>and</strong> implement organizational structure<br />

3. Train <strong>and</strong> recruit as required<br />

ACTIONS Responsible Target date Cost ($’000)<br />

1. Implement organizational structure DCS Dec 2011 In budget<br />

2. Ensure that job descriptions are kept up to<br />

date<br />

All managers Ongoing In budget<br />

3. Develop succession plans MSI/EMO/HR By 2013 In budget<br />

4. Develop <strong>and</strong> implement training plan HR/EMO/MSI Ongoing In budget<br />

5. Recruit appropriate staff HR/EMO/MSI Ongoing In budget<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 54


11 Financial Plan<br />

As part of the strategic business plan, long term financial plans have been prepared <strong>for</strong> the<br />

water supply <strong>and</strong> wastewater businesses. The financial plans are included in Appendix D.<br />

The financial plans indicate that CHW will be able to meet its significant capital works program,<br />

with moderate increase to the water supply TRB <strong>and</strong> high increases to the sewerage typical<br />

residential bill <strong>and</strong> moderate new borrowing <strong>for</strong> sewerage capital works only. The financial plans<br />

assume that the high OMA costs will continue. Should Council succeed in improving the<br />

efficiency of the operations, the increase in the sewerage TRB may be lower. Summary of the<br />

results of the financial plan is shown in Table 8.<br />

Table 8: Summary of Financial Plan (2011/12 dollars)<br />

Parameter <strong>Water</strong> <strong>Supply</strong> <strong>Sewerage</strong><br />

Current Typical Residential Bill (TRB) pa $535 $720<br />

Long Term Price Path (Future TRB) pa $550 $890<br />

30 Year Capital Works Program $106M $151M<br />

Maximum borrowing $96M $117M<br />

OBJECTIVE 15 – Finance<br />

Ensure financially sustainable water supply <strong>and</strong> sewerage businesses<br />

PERFORMANCE TARGET<br />

Fund all financial obligations in the short <strong>and</strong> long term<br />

STRATEGIES<br />

1. Undertake financial planning to support operation.<br />

2. Maximize income from grants.<br />

ACTIONS Responsible Target date Cost ($’000)<br />

1. Review <strong>and</strong> update financial plans EMF Annually In budget<br />

2. Monitor availability of grants <strong>and</strong> apply<br />

when available<br />

MSI Ongoing In budget<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 55


12 Summary of Extra Costs<br />

The actions costs, which are not included in Council’s budget or in the water supply <strong>and</strong><br />

sewerage 30 years capital works program are summarized in Table 9. These costs have been<br />

included in the financial plan modeling.<br />

Table 9: Summary of Total Extra Costs of SBP Actions<br />

ACTIONS 2012/13 2013/14 2014/15 2015/16 2016/17<br />

<strong>Water</strong> <strong>Supply</strong> ($‘000) 110 25 80 25 10<br />

<strong>Sewerage</strong> ($‘000) 150 675 70 25 0<br />

13 Summary of Other Key Activities<br />

As the strategic business plan is the LWU peak planning document, a summary of CHW other key<br />

activities <strong>and</strong> plans are provided below.<br />

13.1 Integrated <strong>Water</strong> Cycle Management<br />

Council has adopted addendum to 2006 Integrated <strong>Water</strong> Cycle Management Concept Study,<br />

February 2010. Summary of the key outcomes are provided in Appendix E<br />

13.2 Drinking <strong>Water</strong> Quality Management<br />

CHW recognises the need to have a Drinking <strong>Water</strong> Quality Management Plan. An action has<br />

been put in place to address this (see Objective 1 in section 5).<br />

13.3 Environmental Management<br />

CHW has a State of the Environment (SoE) Report (See Appendix F) which covers the Coffs<br />

Harbour Local Government Area <strong>and</strong> has been prepared by Council both as a community<br />

in<strong>for</strong>mation document <strong>and</strong> as a management tool <strong>for</strong> Council.<br />

The aim of annual SoE Reports is to document <strong>and</strong> measure the continued progress of both<br />

Council <strong>and</strong> our local community through better environmental management towards<br />

ecological sustainability. The report aims to help further progress towards this goal by providing<br />

sound in<strong>for</strong>mation as a basis <strong>for</strong> future environmental management. The report also has the role<br />

of assessing declining environmental conditions where they occur, which provides an opportunity<br />

to ensure that measures are devised <strong>and</strong> implemented to arrest these trends <strong>and</strong> to improve<br />

conditions. (Source: http://www.coffsharbour.nsw.gov.au/our-environment/Pages/state-of-theenvironment.aspx,<br />

accessed 25 Oct 2011)<br />

CHW recognises the need to have an Environmental Management System. An action has been<br />

put in place to address this (see Objective 9 in Section 8).<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 56


13.4 Dem<strong>and</strong> Management<br />

CHW Dem<strong>and</strong> Management Plan was prepared in August 2006. Council recognizes the need to<br />

update their dem<strong>and</strong> management plan <strong>and</strong> an action has been put in place to address this<br />

(see Objective 3 in Section 7.3). The executive summary of the existing plan is provided in<br />

Appendix G.<br />

13.5 Drought Management<br />

CHW has recently prepared a Drought Management Plan (March 2012). The executive summary<br />

of the plan is provided in Appendix H.<br />

Also Council has a <strong>Water</strong> Restriction Policy (September 2009) in place which provides the<br />

conditions <strong>and</strong> restrictions to be imposed during periods when the water supply system has<br />

difficulty in coping with weather conditions <strong>and</strong> consumption rates. The policy is also provided in<br />

Appendix H.<br />

13.6 Community Consultation<br />

CHW has prepared a Community Engagement Strategy <strong>for</strong> the development <strong>and</strong> review of the<br />

2030 Community <strong>Strategic</strong> Plan. Major outcomes of this strategic plan are provided in Appendix I.<br />

13.7 Occupational Health & Safety<br />

CHCC has a Health, Safety, Environment <strong>and</strong> Quality Policy (approved in May 2010) to improve<br />

Council’s health, safety, environment <strong>and</strong> quality per<strong>for</strong>mance, incorporating the establishment<br />

of an Integrated Management System. The policy is attached in Appendix J.<br />

13.8 Other Risk Management Measures<br />

Other contingency plans <strong>and</strong>/or management measures to address hazards that are currently in<br />

place in CHW are listed below.<br />

Table 10: Summary CHW Risk Management <strong>Plans</strong> <strong>for</strong> <strong>Water</strong> <strong>Supply</strong> Schemes<br />

Risk Management Measures<br />

Dam safety<br />

CHW <strong>Plans</strong><br />

Karangi Dam Safety Emergency Plan 2010; Woolgoolga Dam Safety<br />

Emergency Plan 2010<br />

Chlorination plant failure<br />

<strong>Water</strong> treatment works failure<br />

<strong>Water</strong> Treatment Plant Operations <strong>and</strong> Maintenance Manual Karangi<br />

2009; Nana Glen <strong>Water</strong> Treatment Plant Operations <strong>and</strong> Maintenance<br />

Manual 2000<br />

Major power failure<br />

Localized power failure<br />

<strong>Water</strong> Treatment Plant Operations <strong>and</strong> Maintenance Manual Karangi<br />

2009, st<strong>and</strong>by generators<br />

Raw water pump failure<br />

Karangi WTP has four raw water sources, two of which gravitate to<br />

Karangi WTP, Karangi Dam <strong>and</strong> Nymboida River. St<strong>and</strong>by pumps are<br />

installed at Coramba. Nana Glen has at least 5 days storage<br />

Revenue decline from<br />

reduced water sales<br />

Budget Management Report at Job Level <strong>for</strong> period ending 30 June<br />

2011.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 57


Table 11: Summary CHW Risk Management <strong>Plans</strong> <strong>for</strong> <strong>Sewerage</strong> Schemes<br />

Risk Management Measures<br />

Sewage treatment works<br />

failure<br />

CHW <strong>Plans</strong><br />

Corindi Beach Wastewater Treatment Plant Operations Manual 2000,<br />

Woolgoolga WRP Operation <strong>and</strong> Maintenance Manual 2005, Moonee<br />

<strong>Water</strong> Reclamation Plant Operation <strong>and</strong> Maintenance Manual 1999,<br />

Coffs Harbour <strong>Water</strong> Reclamation Plant Operating Manual 2009<br />

Major power failure<br />

Localized power failure<br />

Woolgoolga WRP Operation <strong>and</strong> Maintenance Manual 2005, Moonee<br />

<strong>Water</strong> Reclamation Plant Operation <strong>and</strong> Maintenance Manual 1999,<br />

Coffs Harbour <strong>Water</strong> Reclamation Plant Operating Manual 2009,<br />

st<strong>and</strong>by generators<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 58


14 Reporting <strong>and</strong> Monitoring<br />

CHW water supply <strong>and</strong> sewerage businesses per<strong>for</strong>mances are monitored <strong>and</strong> annually reported<br />

to NSW Office of <strong>Water</strong>.<br />

The latest TBL reports issued by the Office of <strong>Water</strong> are <strong>for</strong> the 2009-10 financial year. These<br />

reports <strong>for</strong> CHCC water supply <strong>and</strong> sewerage services including their Action <strong>Plans</strong> are provided in<br />

Appendix K. As part of this strategic business planning process, the areas where CHCC received<br />

a low ranking were assessed in this report with a view to improving the per<strong>for</strong>mance.<br />

The indicators where CHCC received a rating of 5 are discussed in the following sections.<br />

Comments <strong>and</strong> actions are also provided in the Action <strong>Plans</strong> in Appendix K. It is noted that<br />

CHCC achieved a rating of 1 (top 20%) on many indicators.<br />

14.1 <strong>Water</strong> <strong>Supply</strong> Per<strong>for</strong>mance Indicators<br />

Indicator<br />

CHCC<br />

Result<br />

Ranking<br />

>10,000 All<br />

Utilities<br />

Statewide<br />

Median<br />

Comments<br />

Renewals expenditure (%<br />

of current replacement<br />

cost of system assets)<br />

0.1 5 5 0.3 Refer to 9.4<br />

Typical residential bill per<br />

assessment ($)<br />

535 5 3 430 The high charges are required to<br />

fund the costs of the new water<br />

treatment plant <strong>and</strong> the Regional<br />

<strong>Water</strong> <strong>Supply</strong> System. Refer to 11<br />

Total days lost (%) 6.1 5 5 2.4<br />

Average annual<br />

residential water supplied<br />

per property – Coastal<br />

(kL/property)<br />

186 5 4 150 Refer to 7.3<br />

Revenue per property ($) 1340 5 5 647 See comments about TRB above.<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 59


14.2 <strong>Sewerage</strong> Per<strong>for</strong>mance Indicators<br />

Indicator<br />

CHCC<br />

Result<br />

3001-<br />

10,000<br />

Ranking<br />

All<br />

Utilities<br />

Statewide<br />

Median<br />

Comments<br />

Residential access charge<br />

per assessment ($)<br />

698 5 5 525 Required <strong>for</strong> stability, funding new<br />

<strong>Water</strong> Reclamation Plants <strong>and</strong><br />

Rehabilitation<br />

Typical residential bill per<br />

assessment ($)<br />

698 4 5 530 Refer to 11.<br />

Urban properties without<br />

reticulated sewerage<br />

service (%)<br />

16.1 5 5 3.9 Refer to 7.2.<br />

Odour complaints per<br />

1000 properties<br />

1.8 5 5 0.6 Refer to 5<br />

Total days lost (%) 6.9 5 5 2.5<br />

Energy consumption per<br />

megalitre (kilowatt hours)<br />

1,156 5 5 910 The high energy consumption is from<br />

the water reclamation plants <strong>and</strong> from<br />

the 120 sewerage pumping stations<br />

due to topography<br />

Net greenhouse gas<br />

emissions – WS <strong>and</strong> Sge<br />

(net tonnes CO2<br />

equivalents per 1000<br />

properties)<br />

450 4 5 350 High net greenhouse gas emissions is<br />

due to, <strong>for</strong> instance, spread out<br />

network <strong>and</strong> topography requiring a lot<br />

of pumping<br />

Operating cost (OMA) per<br />

100 km of main ($’000)<br />

Operating cost (OMA) per<br />

property ($’000)<br />

1,690 4 5 1,490 High operation cost due to discrete five<br />

schemes <strong>and</strong> ribbon development<br />

along the coast<br />

485 5 5 360<br />

Management cost per<br />

property ($)<br />

164 5 5 128<br />

Treatment cost per<br />

property ($)<br />

175 5 5 115 High treatment cost due to discrete five<br />

schemes<br />

Pumping cost per<br />

property ($)<br />

99 5 5 55 High pumping costs due to pumping<br />

long distances <strong>and</strong> topography.<br />

Energy cost per property<br />

($)<br />

52 5 5 26 Same comment as ‘energy<br />

consumption per megalitre’ above<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 60


15 Integrated Planning <strong>and</strong> Reporting<br />

The IPR framework has been introduced by the NSW Government in October 2009 to improve all<br />

NSW councils’ long-term community, financial <strong>and</strong> asset planning. The framework requires the<br />

development <strong>and</strong> implementation of the following components:<br />

<br />

<br />

<br />

<br />

<br />

Community <strong>Strategic</strong> Plan – developed <strong>and</strong> maintained with the assistance of a<br />

community engagement strategy <strong>and</strong> covering a timeframe of at least 10 years<br />

Resourcing Strategy (long-term Financial Plan, Asset Management Strategy <strong>and</strong><br />

Work<strong>for</strong>ce Management Strategy)<br />

Delivery Program<br />

Operational Plan<br />

Annual Report<br />

Ongoing monitoring <strong>and</strong> review process<br />

After a comprehensive program of community engagement activities, the Coffs Harbour 2030<br />

Plan was adopted by Council as the city’s Community <strong>Strategic</strong> Plan on 17 December 2009. This<br />

plan is available on<br />

http://www.coffsharbour.nsw.gov.au/Coffs-And-Council/Pages/publications.aspx (Accessed on<br />

27 Oct 2011).<br />

Council is responsible <strong>for</strong> a range of activities aimed at achieving objectives identified in the<br />

Coffs Harbour 2030 Plan. To support those activities, Council has developed a Resourcing<br />

Strategy comprising a Long-Term Financial Plan, an Asset Management Strategy <strong>and</strong> a<br />

Work<strong>for</strong>ce Management Strategy. The Resourcing Strategy can be viewed on Council’s website<br />

at http://www.coffsharbour.nsw.gov.au/Coffs-And-Council/about-council/Pages/corporateplanning-reporting.aspx<br />

(Accessed on 27 Oct 2011).<br />

The Delivery Program, Operational Plan <strong>and</strong> Annual Report have been prepared by Coffs<br />

Harbour City Council under new IPR laws. These plans are available online at<br />

http://www.coffsharbour.nsw.gov.au/Coffs-And-Council/Pages/publications.aspx (Accessed on<br />

27 Oct 2011).<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 61


Appendix A<br />

Areas Serviced Maps<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 62


BARCOONGERE<br />

HALFWAY<br />

CREEK<br />

DIRTY CREEK<br />

RED ROCK<br />

CORINDI BEACH<br />

!<br />

UPPER CORINDI<br />

ARRAWARRA<br />

ARRAWARRA<br />

HEADLAND<br />

!<br />

MULLAWAY<br />

!<br />

SAFETY<br />

BEACH<br />

WOOLGOOLGA<br />

!<br />

!<br />

!<br />

BUCCA<br />

SANDY BEACH<br />

!<br />

Legend<br />

EMERALD BEACH<br />

MOONEE BEACH<br />

! <strong>Water</strong> Reservoirs<br />

<strong>Water</strong> Catchments<br />

·<br />

Localities<br />

LGA Growth Areas<br />

Road Network 1:60,000<br />

<strong>Water</strong> <strong>Supply</strong> Areas


CORAMBA<br />

MOONEE BEACH<br />

BUCCA<br />

!<br />

SAPPHIRE BEACH<br />

KARANGI<br />

!<br />

KORORA<br />

!<br />

UPPER ORARA<br />

!<br />

!<br />

!<br />

COFFS HARBOUR<br />

NORTH BOAMBEE VALLEY<br />

BOAMBEE<br />

BOAMBEE<br />

EAST<br />

!<br />

TOORMINA<br />

!<br />

SAWTELL<br />

Legend<br />

BONVILLE<br />

BUNDAGEN<br />

! <strong>Water</strong> Reservoirs<br />

<strong>Water</strong> Catchments<br />

·<br />

Localities<br />

LGA Growth Areas<br />

Road Network 1:60,000<br />

<strong>Water</strong> <strong>Supply</strong> Areas


!<br />

BUCCA<br />

NANA GLEN<br />

LOWANNA<br />

CORAMBA<br />

Legend<br />

KARANGI<br />

UPPER ORARA<br />

!<br />

! <strong>Water</strong> Reservoirs<br />

<strong>Water</strong> Catchments<br />

·<br />

Localities<br />

LGA Growth Areas<br />

Road Network 1:30,000<br />

<strong>Water</strong> <strong>Supply</strong> Areas


EMERALD<br />

BEACH<br />

CORAMBA<br />

MOONEE BEACH<br />

BUCCA<br />

SAPPHIRE BEACH<br />

KARANGI<br />

KORORA<br />

UPPER ORARA<br />

COFFS HARBOUR<br />

NORTH BOAMBEE VALLEY<br />

BOAMBEE<br />

BOAMBEE<br />

EAST<br />

TOORMINA<br />

BONVILLE<br />

BUNDAGEN<br />

SAWTELL<br />

Legend<br />

Road Network<br />

·<br />

Localities<br />

Sewer Catchments<br />

LGA Growth Areas 1:60,000<br />

Waste <strong>Water</strong> Areas


RED ROCK<br />

CORINDI BEACH<br />

ARRAWARRA<br />

Legend<br />

WOOLGOOLGA<br />

Road Network<br />

·<br />

Localities<br />

Sewer Catchments<br />

LGA Growth Areas 1:15,000<br />

Waste <strong>Water</strong> Areas


SANDY BEACH<br />

BUCCA<br />

EMERALD BEACH<br />

MOONEE BEACH<br />

SAPPHIRE BEACH<br />

Legend<br />

Road Network<br />

·<br />

Localities<br />

Sewer Catchments<br />

LGA Growth Areas 1:20,000<br />

Waste <strong>Water</strong> Areas


ARRAWARRA<br />

ARRAWARRA HEADLAND<br />

MULLAWAY<br />

SAFETY BEACH<br />

WOOLGOOLGA<br />

SANDY BEACH<br />

Legend<br />

EMERALD BEACH<br />

Road Network<br />

·<br />

Localities<br />

Sewer Catchments<br />

LGA Growth Areas 1:30,000<br />

Waste <strong>Water</strong> Areas


Appendix B<br />

Capital Works Program<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 70


COFFS HARBOUR CITY COUNCIL<br />

WATER SUPPLY CAPITAL WORKS PROGRAM<br />

CHCC 2011 SBP<br />

Project<br />

Improved<br />

LOS<br />

2009/10 2.4%<br />

2010/2011 3%<br />

Total 5.4% 1 2 3 4 5 6 7 8 9<br />

Growth Renewals Project Total 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20<br />

Lakes<br />

Halls Rd to NBV 100% 47,400 47,400 - - - - - - - -<br />

Kratz to Halls 100% 113,300 113,300 - - - - - - - -<br />

225 to 150 in Halls 100% 59,300 59,300 - - - - - - - -<br />

Moonee Bh Rd North Stage 2 100% 118,000 118,000 - - - - - - - -<br />

NBV 250 main Lakes Way 100% 158,100 - 158,100 - - - - - - -<br />

William Sharp Dr from Trunk Main 100% 29,500 29,500 - - - - - - - -<br />

Nth S<strong>and</strong>y on Graham Drive (upsize) 100% 6,300 6,300 - - - - - - - -<br />

Hearns Lake Rd 2005A to Hwy 100% 199,200 - 199,200 - - - - - - -<br />

Moonee from Shops to 450 crossing 100% 131,800 131,800 - - - - - - - -<br />

S<strong>and</strong>y Beach North to new development 100% 75,900 75,900 - - - - - - - -<br />

End 200 Will Sharp Dr to Trunk Main (half expenditure) 100% 71,100 - 71,100 - - - - - - -<br />

Safety Bch Link to Hwy (upsize) 100% 19,000 - 19,000 - - - - - - -<br />

Moonee Bh Rd North Stage 3 100% 143,900 - 143,900 - - - - - - -<br />

NBV 200 main Lakes Way 100% 217,000 - 217,000 - - - - - - -<br />

William Sharp from 300 100% 66,700 - 66,700 - - - - - - -<br />

Moonee 5ML Reservoir 100% 2,213,400 1,054,000 1,159,400 - - - - - - -<br />

William Sharp to North West 100% 104,300 - 104,300 - - - - - - -<br />

From 375 to 2006B (centre of west coffs) 100% 94,900 - 94,900 - - - - - - -<br />

Emerald Trunk to Nth Emerald (Hwy Cross) 100% 149,700 149,700 - - - - - - - -<br />

Hoys Rd to Moonee School 100% 320,200 - - 320,200 - - - - - -<br />

Willis to Hearns Lake Rd (poss. upsize) 100% 75,900 75,900 - - - - - - - -<br />

NBV 150 main Lakes Way to 750main 100% 149,900 149,900 - - - - - - - -<br />

Moonee Bh Rd North Stage 4 100% 133,300 133,300 - - - - - - - -<br />

Moonee Retic Loop (Winton) upsize 100% 156,200 - 156,200 - - - - - - -<br />

Shepards Ln West south to west coffs (retic) 100% 206,600 - - 206,600 - - - - - -<br />

Replace 600 Karangi PS to old fliter plant 100% 2,108,000 2,108,000 - - - - - - - -<br />

Monnee to Emerald Trunk main MNTL option 2 100% 2,500,600 - 2,500,600 - - - - - - -<br />

West Woopi<br />

West Woopi Palmers Rd to Newmans 100% 212,500 - - - 212,500 - - - - -<br />

west woopi 100% 78,300 - - - 78,300 - - - - -<br />

North Boambee<br />

Roberts Hill Trunk main to NB Road 100% 706,200 - - - 706,200 - - - - -<br />

Trunk Main NB Road from 450 to west 100% 324,600 - - - 324,600 - - - - -<br />

Roberts Hill Trunk main to 2005D 100% 194,200 - - - 194,200 - - - - -<br />

Connection of 375 to 2005D 100% 258,500 - - - 258,500 - - - - -<br />

Connect 450 to existing 150 NB Road 100% 43,600 - - - 43,600 - - - - -<br />

West Woolgoolga<br />

8ML Resevoir at Unwins Rd 100% 2,108,000 - - - 2,108,000 - - - - -<br />

Trunk main Unwins Rd to Crabbe St 100% 463,800 - - - 463,800 - - - - -<br />

Trunk main Existing 525 to Unwins Resevoir 100% 274,000 - - - 274,000 - - - - -<br />

60kW PS 100% 527,000 - - - 527,000 - - - - -<br />

Trunk Main from UR Res to 525 <strong>and</strong> 225 100% 376,800 - - - 376,800 - - - - -<br />

Cross Connections Unwins <strong>and</strong> Scarbourgh 100% 105,400 - - - 105,400 - - - - -<br />

Fawcett St, South st to Beach st 100% 217,400 - - - 217,400 - - - - -<br />

Demolish Reservoirs <strong>and</strong> sell l<strong>and</strong> 100% 105,400 - - - 105,400 - - - - -


Project<br />

Improved Growth Renewals Project Total 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20<br />

LOS<br />

Unwins Rd Res towards Havil<strong>and</strong> 100% 75,100 - - - 75,100 - - - - -<br />

225 (above) to Crabbe Street 100% 190,700 - - - 190,700 - - - - -<br />

North Coffs Harbour<br />

shephards lane reservoir (3ML) 100% 2,318,800 - - - - 210,800 2,108,000 - - -<br />

trunk mains 100% 527,000 - - - - 527,000 - - - -<br />

South Coffs Harbour<br />

trunk mains 100% 527,000 - - - - - - 527,000 - -<br />

West Coffs Harbour<br />

Trunk main Shephards Res to 2001A 100% 115,900 - - - 115,900 - - - - -<br />

From 375 (2009B) south on Spag Rd 100% 118,800 - - - 118,800 - - - - -<br />

Pearce Drive to Res. (Upsize) 100% 131,800 - - - 131,800 - - - - -<br />

From 150 on Spag Rd to William Sharp 100% 129,000 - - - 129,000 - - - - -<br />

Cross Connection at Argle St 100% 21,100 - - - - 21,100 - - - -<br />

From 200 (2004) west of Moonee 100% 61,700 - - - - - - 61,700 - -<br />

Duplicate Trunk Main Old Filtration to west tunnel 100% 2,192,300 - - - - - - 2,192,300 - -<br />

Newmans Rd West North to 2NRA1 100% 142,300 - - - - - - - 142,300 -<br />

upgrade treatment plant 100% 3,162,000 - - - - - - - - -<br />

Bonville<br />

bonville reservoir 6ML 100% 1,581,000 - - - - - - - - 1,581,000<br />

bonville distribution main 100% 2,276,600 - - - - - - - - 2,276,600<br />

bonville trunk main 100% 1,844,500 - - - - - - - - 1,844,500<br />

bonville other trunk mains 100% 263,500 - - - - - - - - 263,500<br />

Trunk Main to Resevoir 100% 385,500 - - - - - - - - 385,500<br />

Coramba<br />

Coramba Upgrade Keevers Cl <strong>and</strong> Thrower Av 50% 50% 53,100 - - - - - - - - -<br />

Coramba water main 75% 25% 1,686,400 105,400 790,500 790,500 - - - - - -<br />

General<br />

other s64 reticulation works 100% 17,796,800 84,300 58,000 - - - 527,000 - 527,000 -<br />

Minor capital items 50% 50% 4,584,000 152,800 152,800 152,800 152,800 152,800 152,800 152,800 152,800 152,800<br />

Renewals 20% 20% 60% 29,512,000 527,000 527,000 527,000 527,000 527,000 1,581,000 1,054,000 1,054,000 1,054,000<br />

reservoir renewals 20% 20% 60% 6,324,000 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800<br />

mains - hwy upgrade 100% 316,200 316,200 - - - - - - - -<br />

telemetry 50% 50% 980,800 368,900 21,100 21,100 21,100 21,100 21,100 21,100 21,100 21,100<br />

fibre optic 50% 50% 52,700 52,700 - - - - - - - -<br />

network analysis 20% 80% 79,100 79,100 - - - - - - - -<br />

bulk metering 50% 50% 948,600 158,100 - - - - - 158,100 - -<br />

service connections 80% 20% 9,483,900 314,100 316,200 316,200 316,200 316,200 316,200 316,200 316,200 316,200<br />

lime plant 50% 25% 25% 527,000 527,000 - - - - - - - -<br />

demolish old treatment plant 100% 316,200 316,200 - - - - - - - -<br />

boambee dosing plant 50% 50% 63,200 63,200 - - - - - - - -<br />

vehicles <strong>and</strong> plant 50% 50% 2,055,000 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500<br />

Total 106,508,800 7,596,600 7,035,300 2,613,700 8,053,400 2,055,300 4,985,400 4,762,500 2,492,700 8,174,500<br />

$'000<br />

Total Improved LOS $ 17,316<br />

1047 1004 1004 411 411 622 596 516 516<br />

Total Growth Works $ 63,892<br />

5517 5478 1056 7089 1091 3178 3297 1107 6789<br />

Total Renewals $ 25,301<br />

1033 553 553 553 553 1186 870 870 870<br />

$ 106,509


Project<br />

Lakes<br />

Halls Rd to NBV<br />

Kratz to Halls<br />

225 to 150 in Halls<br />

Moonee Bh Rd North Stage 2<br />

NBV 250 main Lakes Way<br />

William Sharp Dr from Trunk Main<br />

Nth S<strong>and</strong>y on Graham Drive (upsize)<br />

Hearns Lake Rd 2005A to Hwy<br />

Moonee from Shops to 450 crossing<br />

S<strong>and</strong>y Beach North to new development<br />

End 200 Will Sharp Dr to Trunk Main (half expenditure)<br />

Safety Bch Link to Hwy (upsize)<br />

Moonee Bh Rd North Stage 3<br />

NBV 200 main Lakes Way<br />

William Sharp from 300<br />

Moonee 5ML Reservoir<br />

William Sharp to North West<br />

From 375 to 2006B (centre of west coffs)<br />

Emerald Trunk to Nth Emerald (Hwy Cross)<br />

Hoys Rd to Moonee School<br />

Willis to Hearns Lake Rd (poss. upsize)<br />

NBV 150 main Lakes Way to 750main<br />

Moonee Bh Rd North Stage 4<br />

Moonee Retic Loop (Winton) upsize<br />

Shepards Ln West south to west coffs (retic)<br />

Replace 600 Karangi PS to old fliter plant<br />

Monnee to Emerald Trunk main MNTL option 2<br />

West Woopi<br />

West Woopi Palmers Rd to Newmans<br />

west woopi<br />

North Boambee<br />

Roberts Hill Trunk main to NB Road<br />

Trunk Main NB Road from 450 to west<br />

Roberts Hill Trunk main to 2005D<br />

Connection of 375 to 2005D<br />

Connect 450 to existing 150 NB Road<br />

West Woolgoolga<br />

8ML Resevoir at Unwins Rd<br />

Trunk main Unwins Rd to Crabbe St<br />

Trunk main Existing 525 to Unwins Resevoir<br />

60kW PS<br />

Trunk Main from UR Res to 525 <strong>and</strong> 225<br />

Cross Connections Unwins <strong>and</strong> Scarbourgh<br />

Fawcett St, South st to Beach st<br />

Demolish Reservoirs <strong>and</strong> sell l<strong>and</strong><br />

10 11 12 13 14 15 16 17 18 19 20 21<br />

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -


Project<br />

Unwins Rd Res towards Havil<strong>and</strong><br />

225 (above) to Crabbe Street<br />

North Coffs Harbour<br />

shephards lane reservoir (3ML)<br />

trunk mains<br />

South Coffs Harbour<br />

trunk mains<br />

West Coffs Harbour<br />

Trunk main Shephards Res to 2001A<br />

From 375 (2009B) south on Spag Rd<br />

Pearce Drive to Res. (Upsize)<br />

From 150 on Spag Rd to William Sharp<br />

Cross Connection at Argle St<br />

From 200 (2004) west of Moonee<br />

Duplicate Trunk Main Old Filtration to west tunnel<br />

Newmans Rd West North to 2NRA1<br />

upgrade treatment plant<br />

Bonville<br />

bonville reservoir 6ML<br />

bonville distribution main<br />

bonville trunk main<br />

bonville other trunk mains<br />

Trunk Main to Resevoir<br />

Coramba<br />

Coramba Upgrade Keevers Cl <strong>and</strong> Thrower Av<br />

Coramba water main<br />

General<br />

other s64 reticulation works<br />

Minor capital items<br />

Renewals<br />

reservoir renewals<br />

mains - hwy upgrade<br />

telemetry<br />

fibre optic<br />

network analysis<br />

bulk metering<br />

service connections<br />

lime plant<br />

demolish old treatment plant<br />

boambee dosing plant<br />

vehicles <strong>and</strong> plant<br />

Total<br />

2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - 3,162,000 -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

53,100 - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

790,500 790,500 790,500 790,500 790,500 790,500 790,500 790,500 790,500 790,500 790,500 790,500<br />

152,800 152,800 152,800 152,800 152,800 152,800 152,800 152,800 152,800 152,800 152,800 152,800<br />

1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000<br />

210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800<br />

- - - - - - - - - - - -<br />

21,100 21,100 21,100 21,100 21,100 21,100 21,100 21,100 21,100 21,100 21,100 21,100<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - 158,100 - - - - - 158,100 - - -<br />

316,200 316,200 316,200 316,200 316,200 316,200 316,200 316,200 316,200 316,200 316,200 316,200<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

- - - - - - - - - - - -<br />

68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500<br />

2,667,000 2,613,900 2,772,000 2,613,900 2,613,900 2,613,900 2,613,900 2,613,900 2,772,000 2,613,900 5,775,900 2,613,900<br />

Total Improved LOS<br />

Total Growth Works<br />

Total Renewals<br />

543 516 596 516 516 516 516 516 596 516 516 516<br />

1254 1228 1307 1228 1228 1228 1228 1228 1307 1228 4390 1228<br />

870 870 870 870 870 870 870 870 870 870 870 870


Project<br />

Lakes<br />

Halls Rd to NBV<br />

Kratz to Halls<br />

225 to 150 in Halls<br />

Moonee Bh Rd North Stage 2<br />

NBV 250 main Lakes Way<br />

William Sharp Dr from Trunk Main<br />

Nth S<strong>and</strong>y on Graham Drive (upsize)<br />

Hearns Lake Rd 2005A to Hwy<br />

Moonee from Shops to 450 crossing<br />

S<strong>and</strong>y Beach North to new development<br />

End 200 Will Sharp Dr to Trunk Main (half expenditure)<br />

Safety Bch Link to Hwy (upsize)<br />

Moonee Bh Rd North Stage 3<br />

NBV 200 main Lakes Way<br />

William Sharp from 300<br />

Moonee 5ML Reservoir<br />

William Sharp to North West<br />

From 375 to 2006B (centre of west coffs)<br />

Emerald Trunk to Nth Emerald (Hwy Cross)<br />

Hoys Rd to Moonee School<br />

Willis to Hearns Lake Rd (poss. upsize)<br />

NBV 150 main Lakes Way to 750main<br />

Moonee Bh Rd North Stage 4<br />

Moonee Retic Loop (Winton) upsize<br />

Shepards Ln West south to west coffs (retic)<br />

Replace 600 Karangi PS to old fliter plant<br />

Monnee to Emerald Trunk main MNTL option 2<br />

West Woopi<br />

West Woopi Palmers Rd to Newmans<br />

west woopi<br />

North Boambee<br />

Roberts Hill Trunk main to NB Road<br />

Trunk Main NB Road from 450 to west<br />

Roberts Hill Trunk main to 2005D<br />

Connection of 375 to 2005D<br />

Connect 450 to existing 150 NB Road<br />

West Woolgoolga<br />

8ML Resevoir at Unwins Rd<br />

Trunk main Unwins Rd to Crabbe St<br />

Trunk main Existing 525 to Unwins Resevoir<br />

60kW PS<br />

Trunk Main from UR Res to 525 <strong>and</strong> 225<br />

Cross Connections Unwins <strong>and</strong> Scarbourgh<br />

Fawcett St, South st to Beach st<br />

Demolish Reservoirs <strong>and</strong> sell l<strong>and</strong><br />

22 23 24 25 26 27 28 29 30<br />

2032/33 2033/34 2034/35 2035/36 2036/37 2037/38 2038/39 2039/40 2040/41<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -


Project<br />

Unwins Rd Res towards Havil<strong>and</strong><br />

225 (above) to Crabbe Street<br />

North Coffs Harbour<br />

shephards lane reservoir (3ML)<br />

trunk mains<br />

South Coffs Harbour<br />

trunk mains<br />

West Coffs Harbour<br />

Trunk main Shephards Res to 2001A<br />

From 375 (2009B) south on Spag Rd<br />

Pearce Drive to Res. (Upsize)<br />

From 150 on Spag Rd to William Sharp<br />

Cross Connection at Argle St<br />

From 200 (2004) west of Moonee<br />

Duplicate Trunk Main Old Filtration to west tunnel<br />

Newmans Rd West North to 2NRA1<br />

upgrade treatment plant<br />

Bonville<br />

bonville reservoir 6ML<br />

bonville distribution main<br />

bonville trunk main<br />

bonville other trunk mains<br />

Trunk Main to Resevoir<br />

Coramba<br />

Coramba Upgrade Keevers Cl <strong>and</strong> Thrower Av<br />

Coramba water main<br />

General<br />

other s64 reticulation works<br />

Minor capital items<br />

Renewals<br />

reservoir renewals<br />

mains - hwy upgrade<br />

telemetry<br />

fibre optic<br />

network analysis<br />

bulk metering<br />

service connections<br />

lime plant<br />

demolish old treatment plant<br />

boambee dosing plant<br />

vehicles <strong>and</strong> plant<br />

Total<br />

2032/33 2033/34 2034/35 2035/36 2036/37 2037/38 2038/39 2039/40 2040/41<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

790,500 790,500 790,500 790,500 790,500 790,500 790,500 790,500 790,500<br />

152,800 152,800 152,800 152,800 152,800 152,800 152,800 152,800 152,800<br />

1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000<br />

210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800<br />

- - - - - - - - -<br />

21,100 21,100 21,100 21,100 21,100 21,100 21,100 21,100 21,100<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - 158,100 - - - - - 158,100<br />

316,200 316,200 316,200 316,200 316,200 316,200 316,200 316,200 316,200<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

- - - - - - - - -<br />

68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500<br />

2,613,900 2,613,900 2,772,000 2,613,900 2,613,900 2,613,900 2,613,900 2,613,900 2,772,000<br />

Total Improved LOS<br />

Total Growth Works<br />

Total Renewals<br />

516 516 596 516 516 516 516 516 596<br />

1228 1228 1307 1228 1228 1228 1228 1228 1307<br />

870 870 870 870 870 870 870 870 870


COFFS HARBOUR CITY COUNCIL<br />

WATER SUPPLY CAPITAL WORKS PROGRAM<br />

CHCC 2011 SBP<br />

Project<br />

Improved<br />

LOS<br />

2009/10 2.4%<br />

2010/2011 3%<br />

Total 5.4% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

Growth Renewals Project Total 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26<br />

COFFS HARBOUR<br />

Duke St. 25% 75% 537,500 - - - 10,500 263,500 - - - - - - - - - -<br />

75% 25% 173,900 - - - 173,900 - - - - - - - - - - -<br />

Nana Lane 25% 75% 368,900 - - - - 368,900 - - - - - - - - - -<br />

75% 25% 147,600 - - - 73,800 - - - - - - - - - - -<br />

Mildura St. 25% 75% 189,700 - - - 189,700 - - - - - - - - - - -<br />

75% 25% 147,600 73,800 - - - - - - - - - - - - - -<br />

Gundagai St 25% 75% 94,900 94,900 - - - - - - - - - - - - - -<br />

75% 25% 200,300 126,500 - - - - - - - - - - - - - -<br />

Coffs WRP 25% 75% 168,700 94,900 - - - - 73,800 - - - - - - - - -<br />

75% 25% 84,300 - - - - - - - - - - - 84,300 - - -<br />

Vincent St 25% 75% 105,400 - - - 52,700 - - - - - - - - - - -<br />

Arthur St 25% 75% 94,900 - - - 94,900 - - - - - - - - - - -<br />

75% 25% 1,054,000 527,000 - - - - - - - - - - - - - -<br />

Firman Dr 25% 75% 284,500 168,600 115,900 - - - - - - - - - - - - -<br />

75% 25% 181,300 - - - - - - - - - - - - - - -<br />

Marjorie St 25% 75% 137,000 - - - - - - - - - - - - - - -<br />

Midway Hwy. 25% 75% 36,900 - 36,900 - - - - - - - - - - - - -<br />

75% 25% 274,000 - - - - - - - - - - - - 274,000 - -<br />

Boultwood St 25% 75% 474,300 - - 474,300 - - - - - - - - - - - -<br />

75% 25% 200,300 - - - - - - - 73,800 - - - - - - -<br />

Brodie Dr 25% 75% 126,500 - - - - - - - - - - - - - - -<br />

75% 25% 500,700 - - - - - - - - - - - - - 500,700 -<br />

75% 25% 52,700 - - - - - 52,700 - - - - - - - - -<br />

75% 25% 79,100 - - - - - 79,100 - - - - - - - - -<br />

75% 25% 321,500 - - - - - - 321,500 - - - - - - - -<br />

75% 25% 10,500 - - - - - - 10,500 - - - - - - - -<br />

75% 25% 632,400 - - - - - - - 316,200 - - - - - - -<br />

Columbus Crt 25% 75% 42,200 42,200 - - - - - - - - - - - - - -<br />

San Francisco 25% 75% 79,000 31,600 - - - - - - - - - - - - - -<br />

Joyce St 25% 75% 737,800 737,800 - - - - - - - - - - - - - -<br />

75% 25% 158,100 89,600 - - - - - - - - - - - - - -<br />

Reid Dr 25% 75% 310,900 105,400 205,500 - - - - - - - - - - - - -<br />

75% 25% 210,800 - 105,400 - - - - - - - - - - - - -<br />

Howard St 25% 75% 137,000 - 137,000 - - - - - - - - - - - - -<br />

Edgar St 25% 75% 31,600 15,800 - - - - - - - - - - - - - -<br />

York St 25% 75% 73,800 52,700 - - - - - - - - - - - - - -<br />

75% 25% 147,600 - - - - 73,800 - - - - - - - - - -<br />

Ocean Pde 25% 75% 105,400 - - - - 105,400 - - - - - - - - - -<br />

Wongala Est. 25% 75% 42,200 - - - - 42,200 - - - - - - - - - -<br />

Lawson Cres 25% 75% 52,700 52,700 - - - - - - - - - - - - - -<br />

Catholic Club 25% 75% 137,000 - - - - 73,800 - - - - - - - - - -<br />

75% 25% 558,600 347,800 - - - - - - - - - - - - - -<br />

75% 25% 527,000 - - - - - - - - - 263,500 - - - - -<br />

Thompsons Rd 25% 75% 195,000 195,000 - - - - - - - - - - - - - -<br />

James Ide Pl 25% 75% 421,600 - - - - - - - - - - - 421,600 - - -<br />

75% 25% 105,400 52,700 - - - - - - - - - - - - - -<br />

Brodie Dr 25% 75% 84,300 84,300 - - - - - - - - - - - - - -<br />

75% 25% 105,400 - - - - - - 42,200 - - - - - - - -<br />

Howard St Cnr 25% 75% 63,200 - - - - - - 63,200 - - - - - - - -<br />

Fraser Dr 25% 75% 26,400 - - - - - 26,400 - - - - - - - - -<br />

75% 25% 126,400 - 63,200 - - - - - - - - - - - - -<br />

Willis St 25% 75% 105,400 - 105,400 - - - - - - - - - - - - -<br />

Coffs Surf Club 25% 75% 84,400 42,200 - - - - - - - - - - - - - -<br />

Old Airport 25% 75% 195,000 - 158,100 - - - - - - - - - - - - -<br />

New Airport 25% 75% 36,900 - - - - - - - - - - - - - - 36,900<br />

Aussie-tel 25% 75% 47,400 15,800 - - - - - - - - - - - - - -<br />

75% 25% 52,700 21,100 - - - - - - - - - - - - - -<br />

Cook Dr 25% 75% 52,700 52,700 - - - - - - - - - - - - - -<br />

York St Oval 25% 75% 210,800 - - - - - - - - - - - - - - 210,800


Project<br />

Improved Growth Renewals Project Total 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26<br />

LOS<br />

Murray Dr 25% 75% 179,200 131,800 - - - - - - - - - - - - - -<br />

75% 25% 94,900 - - 42,200 - - - - - - - - - - - -<br />

Boral Gas 25% 75% 58,000 - - 58,000 - - - - - - - - - - - -<br />

Robyn St 25% 75% 137,000 - - - 105,400 - - - - - - - - - - -<br />

Isles Estate 25% 75% 58,000 - - - - 21,100 - - - - - - - - - -<br />

Pacific Bay 25% 75% 42,200 - - - - - - - - - - - - - - 42,200<br />

75% 25% 442,700 - - - - - 210,800 - - - - - - - - -<br />

Links Ave 25% 75% 811,600 790,500 - - - - 21,100 - - - - - - - - -<br />

75% 25% 463,800 - 231,900 - - - - - - - - - - - - -<br />

S<strong>and</strong>y Bch Rd 25% 75% 63,200 - 63,200 - - - - - - - - - - - - -<br />

75% 25% 105,400 - - - - 52,700 - - - - - - - - - -<br />

James Smal Dr 25% 75% 84,300 - - - - 84,300 - - - - - - - - - -<br />

Norman Hill 25% 75% 31,600 - - - - - - - - - - - - - - -<br />

75% 25% 63,200 - - 31,600 - - - - - - - - - - - -<br />

Opal Cove 25% 75% 31,600 - - 31,600 - - - - - - - - - - - -<br />

75% 25% 126,500 73,800 - - - - - - - - - - - - - -<br />

Pelican Beach 25% 75% 26,400 26,400 - - - - - - - - - - - - - -<br />

75% 25% 210,800 105,400 - - - - - - - - - - - - - -<br />

Emerald Quary 25% 75% 73,800 73,800 - - - - - - - - - - - - - -<br />

75% 25% 68,600 - - 26,400 - - - - - - - - - - - -<br />

Sapphire Cres 25% 75% 21,100 - - 21,100 - - - - - - - - - - - -<br />

Sapphire Gardn 25% 75% 68,600 - - 26,400 - - - - - - - - - - - -<br />

75% 25% 126,400 - - - 63,200 - - - - - - - - - - -<br />

Merinda Ave 25% 75% 73,800 - - - 73,800 - - - - - - - - - - -<br />

75% 25% 105,400 - - 52,700 - - - - - - - - - - - -<br />

Lakeside Dr 25% 75% 73,800 - - 73,800 - - - - - - - - - - - -<br />

75% 25% 105,400 52,700 - - - - - - - - - - - - - -<br />

James Small Dr 25% 75% 63,200 63,200 - - - - - - - - - - - - - -<br />

75% 25% 42,200 - - - - - - - - - - - - - 42,200 -<br />

75% 25% 527,000 - - - - - - - - - 263,500 - - - - -<br />

James Small Dr 25% 75% 421,600 - - - - - - - - - 210,800 - - - - -<br />

Kingfisher Park 25% 75% 58,000 - 21,100 - - - - - - - - - - - - -<br />

40 25% 75% 95,000 - - - - - - - - - 26,400 - - - - -<br />

Opal Cove Villa 25% 75% 58,000 - 21,100 - - - - - - - - - - - - -<br />

North Boambee 25% 75% 126,500 - - - - 52,700 - - - - - - - - - -<br />

South Coffs Harbour 100% 2,635,000 - - - - 2,635,000 - - - - - - - - - -<br />

Plant <strong>and</strong> equipment 50% 50% 13,700 13,700 - - - - - - - - - - - - - -<br />

Coffs EIS 100% 15,800 15,800 - - - - - - - - - - - - - -<br />

SAWTELL<br />

23rd Ave 25% 75% 463,800 231,900 - - - - - - - - - - - - - -<br />

75% 25% 231,900 231,900 - - - - - - - - - - - - - -<br />

4th Ave 25% 75% 84,300 - - - 31,600 - - - - - - - - - - -<br />

75% 25% 52,700 - - - 52,700 - - - - - - - - - - -<br />

Bowling Club 25% 75% 42,200 - - - - - - - - - - 42,200 - - - -<br />

18th Ave 25% 75% 126,500 - - - - - - - 36,900 - - - - - - -<br />

75% 25% 105,400 - - - - - - - 52,700 - - - - - - -<br />

Walco 25% 75% 105,400 52,700 - - - - - - - - - - - - - -<br />

Tindarra Dr 25% 75% 105,400 - - 52,700 - - - - - - - - - - - -<br />

Hulberts Rd 25% 75% 316,200 210,800 - - - - - - - - - - - - - -<br />

25% 75% 579,700 105,400 - - - - - - - - - - 474,300 - - -<br />

Minorie Dr 25% 75% 126,400 63,200 - - - - - - - - - - - - - -<br />

Bonville <strong>Water</strong>s 25% 75% 247,700 179,200 - - - - - - - - - - - - - -<br />

75% 25% 400,500 84,300 - - - - - - - - - 316,200 - - - -<br />

Barcoo Crt 25% 75% 36,900 - - - - - - - - - - - 36,900 - - -<br />

Boambee Resv 25% 75% 21,100 - - - - 21,100 - - - - - - - - - -<br />

75% 25% 42,200 - - - - 42,200 - - - - - - - - - -<br />

Hamilton Dr 25% 75% 42,200 - - - - 42,200 - - - - - - - - - -<br />

Hi-Tech Dr 25% 75% 52,700 - - - - - - - - - - - 52,700 - - -<br />

Koala Pl 25% 75% 210,800 - - - - 210,800 - - - - - - - - - -<br />

75% 25% 231,900 - - - - 231,900 - - - - - - - - - -<br />

Sea Breeze Pl 25% 75% 52,700 - - - 52,700 - - - - - - - - - - -<br />

75% 25% 73,800 - - - 73,800 - - - - - - - - - - -<br />

Lyons Rd 25% 75% 906,400 843,200 - - - - - - - - - - - - - -<br />

75% 25% 84,300 84,300 - - - - - - - - - - - - - -<br />

Big 1 25% 75% 158,100 - - - - - - - - - - - - - - -<br />

Big 2 25% 75% 105,400 - - - - - - - - - - - - - - -<br />

Sawtell Rd Sth 25% 75% 189,700 - - - - 189,700 - - - - - - - - - -<br />

Sawtell Rd Sth west 25% 75% 368,900 - - - - - - - - - - - - - - 368,900<br />

EMERALD<br />

Beacon Cr 50% 50% 105,400 - - - - - - - - - - - - - - -


Project<br />

Improved Growth Renewals Project Total 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26<br />

LOS<br />

Fiddamen Rd 50% 50% 105,400 - - - - - - - - - - - - - - -<br />

Fishermans Dr 50% 50% 105,400 - - - - - - - - - - - - - - -<br />

MOONEE<br />

Moonee Bch Rd 50% 50% 105,400 - - - - - - - - - - - - - - -<br />

Moonee Bch Rd 50% 50% 105,400 - - - - - - - - - - - - - - -<br />

Rushton Ave 50% 50% 105,400 - - - - - - - - - - - - - - -<br />

Moonee Escapades 100% 527,000 421,600 - - - - - - - - - - - - - -<br />

Craw<strong>for</strong>ds 1 100% 790,500 737,800 - - - - - - - - - - - - - -<br />

Craw<strong>for</strong>ds 2 100% 790,500 - - 737,800 - - - - - - - - - - - -<br />

Craw<strong>for</strong>ds 3 100% 790,500 - - - - 737,800 - - - - - - - - - -<br />

Hills 1 100% 1,633,700 1,581,000 - - - - - - - - - - - - - -<br />

Hills 2 100% 790,500 - - 737,800 - - - - - - - - - - - -<br />

Hills 3 100% 895,900 - - - - 843,200 - - - - - - - - - -<br />

Moonee stp upgrade 100% 3,162,000 - - - - - - - - - 3,162,000 - - - - -<br />

WOOLGOOLGA<br />

G<strong>and</strong>erton 40% 60% 421,600 - 210,800 - - - - - - - - - - - - -<br />

Beach St 40% 60% 105,400 - 52,700 - - - - - - - - - - - - -<br />

Young St/ Safety 40% 60% 52,700 - - - - 52,700 - - - - - - - - - -<br />

Haines Cl/Sunset 40% 60% 42,200 - - - - - - - - - - - - - - -<br />

Nightingale St 40% 60% 84,400 42,200 - - - - - - - - - - - - - -<br />

Panorama/Safety 40% 60% 63,200 - - - - - - - - - - - - - - -<br />

Killawarra/Safety 40% 60% 68,600 - 26,400 - - - - - - - - - - - - -<br />

Ti-Tree/S<strong>and</strong>y 40% 60% 316,200 - - 158,100 - - - - - - - - - - - -<br />

Redbox/S<strong>and</strong>y 40% 60% 68,600 - - 26,400 - - - - - - - - - - - -<br />

S<strong>and</strong>y Bch/S<strong>and</strong>y 40% 60% 68,600 - - 26,400 - - - - - - - - - - - -<br />

Graham Dr/S<strong>and</strong>y 40% 60% 79,000 - - 31,600 - - - - - - - - - - - -<br />

Mahogany/S<strong>and</strong>y 40% 60% 79,000 - - 31,600 - - - - - - - - - - - -<br />

Ryan Cr 40% 60% 36,900 - - - - - - - - - - - - - - -<br />

Pac.Hwy 40% 60% 210,800 158,100 - - - - - - - - - - - - - -<br />

Newmans Hwy 40% 60% 105,400 - - - - - - - - 52,700 - - - - - -<br />

P<strong>and</strong>anus/Sunset 40% 60% 52,700 - - - - - - - - - - - - - - -<br />

Melaleuca/Sunset 40% 60% 63,200 - - - - - - - - - - - - - - -<br />

Mullaway Cara park 40% 60% 63,200 - - - - - - - - - - - - - - 63,200<br />

Darkum Rd 40% 60% 31,600 - - - - - - - - - - - - - - 31,600<br />

Mullaway Beach 40% 60% 52,700 - - - - - - - - - - - - - - 52,700<br />

Ocean View Dr 40% 60% 31,600 - - - - - - - - - - - - - - 31,600<br />

Headl<strong>and</strong> Rd 40% 60% 31,600 - - - - - - - - - - - - - - 31,600<br />

Awarrawa Rd 40% 60% 52,700 - - - - - - - - - - - - - - 52,700<br />

1st Avenue 40% 60% 94,900 - - - - - - - - - - - - - - 42,200<br />

Darlington Park 40% 60% 31,600 - - - - - - - - - - - - - - 31,600<br />

Hearns Lake 100% 1,581,000 1,581,000 - - - - - - - - - - - - - -<br />

CORINDI<br />

Pacific St 50% 50% 295,100 210,800 - - - - - - - - - - - - - -<br />

Coral St 50% 50% 31,600 - - - - - - - - - - - - - - 31,600<br />

Macdougal St divert RM to woopi 11/12 50% 50% 253,000 231,900 - - - - - - - - - - - - - -<br />

Showground 50% 50% 42,200 21,100 - - - - - - - - - - - - - -<br />

GENERAL<br />

pump overhaul general 25% 75% 6,324,000 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800<br />

minor sewer extensions 75% 25% 1,266,000 42,200 42,200 42,200 42,200 42,200 42,200 42,200 42,200 42,200 42,200 42,200 42,200 42,200 42,200 42,200<br />

sewer rehabilitation 25% 75% 31,620,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000<br />

section 64 works general 100% 28,985,000 527,000 527,000 527,000 527,000 527,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000<br />

telemetry 75% 25% 832,200 105,400 - - - - - - 31,600 31,600 31,600 31,600 31,600 31,600 31,600 31,600<br />

vehicles <strong>and</strong> plant 10% 90% 2,055,000 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500<br />

RECLAIMED WATER PIPELINES<br />

stage 2 moonee to woolgoolga 20% 80% 8,959,000 - 4,743,000 - - - 4,216,000 - - - - - - - - -<br />

re-use lines 20% 80% 695,600 - 379,400 316,200 - - - - - - - - - - - -<br />

TREATMENT WORKS<br />

woolgoolga upgrade 100% 210,800 210,800 - - - - - - - - - - - - - -<br />

sawtell pump stn 40% 30% 30% 29,195,800 7,905,000 21,080,000 210,800 - - - - - - - - - - - -<br />

minor treatment works 50% 25% 25% 1,581,000 52,700 52,700 52,700 52,700 52,700 52,700 52,700 52,700 52,700 52,700 52,700 52,700 52,700 52,700 52,700<br />

151,561,300 21,621,000 29,712,200 5,122,700 3,003,900 8,100,200 7,162,100 2,919,600 2,993,400 2,566,500 6,440,000 2,872,200 3,583,600 2,787,800 3,056,700 3,541,400<br />

$'000<br />

Total Improved LOS $ 15,973 3,299 9,514 206 58 58 901 58 82 82 82 82 82 82 82 82<br />

Total Growth Works $ 81,984 10,666 11,928 3,074 1,355 5,780 5,061 1,697 1,750 1,430 5,025 1,656 1,718 1,614 1,816 1,724<br />

Total Renewals $ 53,604 7,656 8,270 1,843 1,591 2,262 1,200 1,164 1,162 1,055 1,333 1,134 1,784 1,092 1,159 1,736<br />

$ 151,561


Project<br />

COFFS HARBOUR<br />

Duke St.<br />

Nana Lane<br />

Mildura St.<br />

Gundagai St<br />

Coffs WRP<br />

Vincent St<br />

Arthur St<br />

Firman Dr<br />

Marjorie St<br />

Midway Hwy.<br />

Boultwood St<br />

Brodie Dr<br />

Columbus Crt<br />

San Francisco<br />

Joyce St<br />

Reid Dr<br />

Howard St<br />

Edgar St<br />

York St<br />

Ocean Pde<br />

Wongala Est.<br />

Lawson Cres<br />

Catholic Club<br />

Thompsons Rd<br />

James Ide Pl<br />

Brodie Dr<br />

Howard St Cnr<br />

Fraser Dr<br />

Willis St<br />

Coffs Surf Club<br />

Old Airport<br />

New Airport<br />

Aussie-tel<br />

Cook Dr<br />

York St Oval<br />

16 17 18 19 20 21 22 23 24 25 26 27 28 29 30<br />

2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035/36 2036/37 2037/38 2038/39 2039/40 2040/41<br />

- - - - - - - - 263,500 - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - 73,800 - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - 73,800 - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - 73,800 - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - 52,700 - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - 527,000 - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - 86,400 - - - 94,900 - - - - - - -<br />

- - - 137,000 - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - 52,700 73,800 - -<br />

- - - - - - 126,500 - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - 316,200 - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - 47,400 - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - 68,500 - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - 105,400 - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - 15,800 - - - - - - - - - -<br />

- - - - 21,100 - - - - - - - - - -<br />

- - - - - - - - - 73,800 - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - 63,200 - - - - -<br />

- - - - 210,800 - - - - - - - - - -<br />

- - - - - - - - - - - - - - 263,500<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - 52,700 - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - 63,200 - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - 63,200 - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - 42,200 - - - - - - - -<br />

- - - - - - 36,900 - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - 31,600 - - - - - - - - -<br />

- - - - 31,600 - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -


Project<br />

Murray Dr<br />

Boral Gas<br />

Robyn St<br />

Isles Estate<br />

Pacific Bay<br />

Links Ave<br />

S<strong>and</strong>y Bch Rd<br />

James Smal Dr<br />

Norman Hill<br />

Opal Cove<br />

Pelican Beach<br />

Emerald Quary<br />

Sapphire Cres<br />

Sapphire Gardn<br />

Merinda Ave<br />

Lakeside Dr<br />

James Small Dr<br />

James Small Dr<br />

Kingfisher Park<br />

40<br />

Opal Cove Villa<br />

North Boambee<br />

South Coffs Harbour<br />

Plant <strong>and</strong> equipment<br />

Coffs EIS<br />

SAWTELL<br />

23rd Ave<br />

4th Ave<br />

Bowling Club<br />

18th Ave<br />

Walco<br />

Tindarra Dr<br />

Hulberts Rd<br />

Minorie Dr<br />

Bonville <strong>Water</strong>s<br />

Barcoo Crt<br />

Boambee Resv<br />

Hamilton Dr<br />

Hi-Tech Dr<br />

Koala Pl<br />

Sea Breeze Pl<br />

Lyons Rd<br />

Big 1<br />

Big 2<br />

Sawtell Rd Sth<br />

Sawtell Rd Sth west<br />

EMERALD<br />

Beacon Cr<br />

2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035/36 2036/37 2037/38 2038/39 2039/40 2040/41<br />

- - - - 47,400 - - - - - - - - - -<br />

- - - - - - 52,700 - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - 31,600 - - - - - -<br />

- - - - - - - - - 36,900 - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - 231,900 - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - 231,900 - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - 52,700 - - - - -<br />

- - - - - - - - - - - - - - -<br />

- 31,600 - - - - - - - - - - - - -<br />

- - - - - - - 31,600 - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - 52,700 - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - 105,400 - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - 42,200 - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - 42,200 - - - - - - -<br />

- - - - - - - - 63,200 - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - 52,700 - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - 52,700 - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - 263,500<br />

- - - - - - - - - - - - - - 210,800<br />

- - - - - - 36,900 - - - - - - - -<br />

- - - - - - - - 42,200 - - - - - 26,400<br />

- - - - - - 36,900 - - - - - - - -<br />

- - - - 73,800 - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - 231,900 - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - 52,700 - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - 52,700 36,900 - -<br />

- - - - - - - - - - - - 52,700 - -<br />

- - - - - 52,700 - - - - - - - - -<br />

- - - - - - - 52,700 - - - - - - -<br />

- - - - - 105,400 - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - 63,200 - - - - - - - - - -<br />

- - - - 68,500 - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - 63,200 - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - 158,100 - - - - - - - - - -<br />

- - - - 105,400 - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - 105,400 - - - - - - - - - - -


Project<br />

2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34 2034/35 2035/36 2036/37 2037/38 2038/39 2039/40 2040/41<br />

Fiddamen Rd<br />

Fishermans Dr<br />

MOONEE<br />

Moonee Bch Rd<br />

Moonee Bch Rd<br />

Rushton Ave<br />

Moonee Escapades<br />

Craw<strong>for</strong>ds 1<br />

Craw<strong>for</strong>ds 2<br />

Craw<strong>for</strong>ds 3<br />

Hills 1<br />

Hills 2<br />

Hills 3<br />

Moonee stp upgrade<br />

WOOLGOOLGA<br />

G<strong>and</strong>erton<br />

Beach St<br />

Young St/ Safety<br />

Haines Cl/Sunset<br />

Nightingale St<br />

Panorama/Safety<br />

Killawarra/Safety<br />

Ti-Tree/S<strong>and</strong>y<br />

Redbox/S<strong>and</strong>y<br />

S<strong>and</strong>y Bch/S<strong>and</strong>y<br />

Graham Dr/S<strong>and</strong>y<br />

Mahogany/S<strong>and</strong>y<br />

Ryan Cr<br />

Pac.Hwy<br />

Newmans Hwy<br />

P<strong>and</strong>anus/Sunset<br />

Melaleuca/Sunset<br />

Mullaway Cara park<br />

Darkum Rd<br />

Mullaway Beach<br />

Ocean View Dr<br />

Headl<strong>and</strong> Rd<br />

Awarrawa Rd<br />

1st Avenue<br />

Darlington Park<br />

Hearns Lake<br />

CORINDI<br />

Pacific St<br />

Coral St<br />

Macdougal St divert RM to woopi 11/12<br />

Showground<br />

GENERAL<br />

pump overhaul general<br />

minor sewer extensions<br />

sewer rehabilitation<br />

section 64 works general<br />

telemetry<br />

vehicles <strong>and</strong> plant<br />

RECLAIMED WATER PIPELINES<br />

stage 2 moonee to woolgoolga<br />

re-use lines<br />

TREATMENT WORKS<br />

woolgoolga upgrade<br />

sawtell pump stn<br />

minor treatment works<br />

- - - 105,400 - - - - - - - - - - -<br />

- - - 105,400 - - - - - - - - - - -<br />

- - - 105,400 - - - - - - - - - - -<br />

- - - 105,400 - - - - - - - - - - -<br />

- - - 105,400 - - - - - - - - - - -<br />

- - - 105,400 - - - - - - - - - - -<br />

52,700 - - - - - - - - - - - - - -<br />

- - 52,700 - - - - - - - - - - - -<br />

- - - - 52,700 - - - - - - - - - -<br />

- 52,700 - - - - - - - - - - - - -<br />

- - - 52,700 - - - - - - - - - - -<br />

- - - - - 52,700 - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - 210,800 - - - - - - - -<br />

- - - - - - 52,700 - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

42,200 - - - - - - - - - - - - - -<br />

- - 42,200 - - - - - - - - - - - -<br />

- 63,200 - - - - - - - - - - - - -<br />

- - - - - - 42,200 - - - - - - - -<br />

- - - - - - - 158,100 - - - - - - -<br />

- - - - - - - 42,200 - - - - - - -<br />

- - - - - - - 42,200 - - - - - - -<br />

- - - - - - - 47,400 - - - - - - -<br />

- - - - - - - 47,400 - - - - - - -<br />

- - - - - - - 36,900 - - - - - - -<br />

- - - - 52,700 - - - - - - - - - -<br />

- - - - - - - - - - - - - 52,700 -<br />

52,700 - - - - - - - - - - - - - -<br />

63,200 - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- 52,700 - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - 84,300 - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - 21,100 - - - - - - - - - - -<br />

- - - 21,100 - - - - - - - - - - -<br />

210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800 210,800<br />

42,200 42,200 42,200 42,200 42,200 42,200 42,200 42,200 42,200 42,200 42,200 42,200 42,200 42,200 42,200<br />

1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000<br />

1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000 1,054,000<br />

31,600 31,600 31,600 31,600 31,600 31,600 31,600 31,600 31,600 31,600 31,600 31,600 31,600 31,600 31,600<br />

68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500 68,500<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - -<br />

52,700 52,700 52,700 52,700 52,700 52,700 52,700 52,700 52,700 52,700 52,700 52,700 52,700 52,700 52,700<br />

2,724,600 2,714,000 2,608,700 3,854,500 4,210,600 3,109,300 3,372,900 3,383,500 3,093,500 2,740,400 2,745,700 2,682,400 2,993,400 2,566,500 3,278,000<br />

Total Improved LOS<br />

Total Growth Works<br />

Total Renewals<br />

82 82 82 82 82 82 82 82 82 82 82 82 82 82 82<br />

1,525 1,516 1,478 2,101 2,347 1,750 1,806 1,883 1,622 1,529 1,583 1,509 1,750 1,430 1,863<br />

1,118 1,117 1,049 1,672 1,782 1,278 1,485 1,419 1,390 1,130 1,081 1,092 1,162 1,055 1,333


Appendix C<br />

Organizational Charts<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 83


Coffs Harbour City Council<br />

July 2011<br />

COUNCILLORS<br />

GENERAL<br />

MANAGER<br />

L<strong>and</strong> Use, Health<br />

& Development<br />

City<br />

Services<br />

Corporate<br />

<strong>Business</strong><br />

Reporting to<br />

General Manager<br />

Strategy &<br />

Sustainability<br />

Health<br />

Environmental<br />

Laboratory<br />

Engineering<br />

Special Projects<br />

Economic<br />

Development<br />

Asset<br />

Systems<br />

Finance<br />

Human Resources<br />

& Organisational<br />

Development<br />

Governance<br />

& Legal<br />

Corporate<br />

Planning<br />

L<strong>and</strong> Use<br />

Planning<br />

L<strong>and</strong> Use<br />

Assessment<br />

Coffs City Works<br />

Recreational<br />

Services<br />

Coffs Harbour <strong>Water</strong><br />

Distribution<br />

Engineering Services<br />

Subdivision &<br />

Contracts<br />

Cultural & Community<br />

Development<br />

Coffs Harbour<br />

Library<br />

Integrated<br />

Management Systems<br />

Corporate<br />

In<strong>for</strong>mation<br />

Media<br />

Internal Audit<br />

L<strong>and</strong> Use<br />

Management<br />

Asset<br />

Maintenance<br />

<strong>Water</strong><br />

Treatment<br />

<strong>Strategic</strong><br />

Infrastructure<br />

Community<br />

Development<br />

Coffs Coast Tourism<br />

& Marketing<br />

Asset<br />

Construction<br />

Cultural Facilities<br />

Telecommunications<br />

& New Technology<br />

<strong>Business</strong> Units<br />

Property &<br />

Commercial<br />

Airport<br />

Caravan &<br />

State Parks<br />

Sports<br />

Unit<br />

Page 1


Appendix D<br />

Financial <strong>Plans</strong><br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 86


Coffs Harbour City Council<br />

Financial <strong>Plans</strong> <strong>for</strong><br />

<strong>Water</strong> <strong>Supply</strong> <strong>and</strong> <strong>Sewerage</strong><br />

HydroScience Consulting<br />

A.B.N. 79 120 716 887<br />

Level 5, 350 Kent Street<br />

Sydney, NSW, 2000<br />

Telephone: 02 9249 5100<br />

Facsimilie: 02 9279 2700<br />

Email: hsc@hydroscience.net.au<br />

Document Control<br />

Approved <strong>for</strong> Issue<br />

Issue Author Reviewer Name Signature Date<br />

2 ARA GAZ Gidi Azar 06 March 2012<br />

© HydroScience Consulting 2012<br />

This document shall remain the property of HydroScience Consulting.<br />

Unauthorised use of this document in any <strong>for</strong>m is prohibited.<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 1


Contents<br />

1 Introduction .......................................................................................................... 3<br />

2 Summary <strong>and</strong> Recommendations .............................................................. 3<br />

3 Summary of Data Input ................................................................................... 4<br />

3.1 Historical Financial Data ....................................................................................................... 4<br />

3.2 Base Data ................................................................................................................................ 4<br />

3.3 Assessments <strong>and</strong> Growth Projections ................................................................................. 4<br />

3.4 Typical Residential Bill <strong>for</strong> <strong>Water</strong> <strong>Supply</strong> ............................................................................. 5<br />

3.5 Typical Residential Bill <strong>for</strong> <strong>Sewerage</strong> ................................................................................... 5<br />

3.6 Typical Developer Charges ................................................................................................. 6<br />

3.7 Operation, Maintenance <strong>and</strong> Administration Cost ......................................................... 7<br />

3.8 Non-Residential Income ....................................................................................................... 7<br />

3.9 Capital Works Program ......................................................................................................... 8<br />

4 Model Outputs ..................................................................................................... 9<br />

5 <strong>Water</strong> <strong>Supply</strong> ...................................................................................................... 10<br />

5.1 Financial Data ...................................................................................................................... 10<br />

5.2 Capital Works <strong>and</strong> Growth ................................................................................................. 10<br />

5.3 <strong>Water</strong> <strong>Supply</strong> Results ............................................................................................................ 10<br />

5.4 <strong>Water</strong> <strong>Supply</strong> Sensitivity Analysis ........................................................................................ 11<br />

6 <strong>Sewerage</strong> Scheme ............................................................................................ 15<br />

6.1 Financial Data ...................................................................................................................... 15<br />

6.2 Capital Works <strong>and</strong> Growth ................................................................................................. 15<br />

6.3 <strong>Sewerage</strong> Results ................................................................................................................. 15<br />

6.4 <strong>Sewerage</strong> Sensitivity Analysis ............................................................................................. 16<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 2


1 Introduction<br />

These financial plans are part of Coffs Harbour City Council (CHCC) strategic business<br />

plans <strong>for</strong> water supply <strong>and</strong> sewerage.<br />

Two 30-year financial plans have been prepared, one <strong>for</strong> the water supply fund <strong>and</strong><br />

one <strong>for</strong> the sewerage fund. The NSW Financial Planning Model (FINMOD) has been<br />

used <strong>for</strong> preparing the plans. All the data inputs <strong>for</strong> the financial plans were provided<br />

by CHCC.<br />

The plans set out the long term price path (annual charges) CHCC will need to levy on<br />

its customers in order to fund recurrent cost <strong>and</strong> capital investment required <strong>for</strong><br />

delivering the levels of service set out in the strategic business plan. The price path is<br />

shown as typical residential bill (TRB).<br />

2 Summary <strong>and</strong> Recommendations<br />

<br />

<br />

<br />

<strong>Water</strong> supply: To meet future capital investments <strong>and</strong> to ensure positive<br />

reserves Council will need to gradually increase the TRB in the next 5 years to<br />

$550 (CPI adjusted) <strong>and</strong> then maintain it <strong>for</strong> the rest of the financial planning<br />

horizon (adjusted annually <strong>for</strong> CPI). The capital works <strong>and</strong> financial plan should<br />

be reviewed annually.<br />

<strong>Sewerage</strong>: To meet future capital investments <strong>and</strong> to ensure positive reserves<br />

Council will need to gradually increase the TRB in the next 10 years to $890 (CPI<br />

adjusted) <strong>and</strong> then maintain it <strong>for</strong> the rest of the financial planning horizon<br />

(adjusted annually <strong>for</strong> CPI). The capital works <strong>and</strong> financial plan should be<br />

reviewed annually.<br />

Council should consider the sensitivity analysis to develop a level of<br />

confidence in the results.<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 3


3 Summary of Data Input<br />

3.1 Historical Financial Data<br />

The historical data is used to document the starting position of the funds (balance<br />

sheet). FINMOD also uses the data from the operating statement as a default <strong>for</strong><br />

projecting future operation, maintenance <strong>and</strong> administration (OMA) costs.<br />

Historical data was obtained from CHCC Special Schedules 3 & 4 <strong>for</strong> <strong>Water</strong> <strong>Supply</strong> <strong>and</strong><br />

Special Schedules 5 & 6 <strong>for</strong> <strong>Sewerage</strong> <strong>for</strong> the 10/11 financial year. The Special<br />

Schedules are the accounting statements (balance sheet <strong>and</strong> income statement) <strong>for</strong><br />

the water supply <strong>and</strong> sewerage businesses.<br />

3.2 Base Data<br />

Some of the base data parameters used in the modelling is shown in Table 1. With the<br />

exception of inflation, the values are recommended by the NSW Office of <strong>Water</strong>.<br />

Inflation rate is the value estimated <strong>and</strong> used by the CHCC financial department.<br />

Table 1: Base Data<br />

Parameter<br />

Inflation 1<br />

Borrowing Interest rate<br />

Deposit Interest rate<br />

Term of new loan<br />

Average life of new system assets<br />

Value<br />

3% pa<br />

6.5% pa<br />

5.5% pa<br />

20 years<br />

70 years<br />

Note1: CHCC Financial Executive Manager advised that <strong>for</strong> the purposes of this financial analyses<br />

the inflation rate is 3%.<br />

3.3 Assessments <strong>and</strong> Growth Projections<br />

The figures used as assessment data are given in Table 2.<br />

Table 2: Number of Assessments<br />

Item <strong>Water</strong> <strong>Supply</strong> <strong>Sewerage</strong><br />

Existing assessments (June 2011) 1<br />

Residential 24,180 23,123<br />

Non-residential 1,656 1,535<br />

Growth Projections per year (30 years) 2<br />

Residential 1%<br />

Non-residential 0.5%<br />

Data sources: 1.Special Schedules<br />

2. Data provided by CHCC staff<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 4


3.4 Typical Residential Bill <strong>for</strong> <strong>Water</strong> <strong>Supply</strong><br />

The typical residential bill (TRB) on the 2009/2010 TBL report was $535.<br />

Council has recently reviewed its water supply budgets <strong>and</strong> had estimated the water<br />

supply TRB <strong>for</strong> the next 6 financial years (See Table 3).<br />

Table 3: <strong>Water</strong> <strong>Supply</strong> Budget<br />

Residential 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17<br />

<strong>Water</strong> Access<br />

Charge<br />

$3,431,938 $3,555,900 $3,735,539 $3,892,218 $4,079,720 $4,243,703<br />

<strong>Water</strong> Usage<br />

Charge<br />

$8,858,451 $9,429,885 $9,899,125 $10,454,141 $11,027,721 $11,651,545<br />

Total Income $12,290,390 $12,985,785 $13,634,664 $14,346,359 $15,107,441 $15,895,248<br />

Number of<br />

Assessments 24,422 24,666 24,913 25,162 25,414 25,668<br />

TRB inflated<br />

(3% inflation)<br />

$503 $526 $547 $570 $594 $619<br />

TRB in 2011$ $503 $511 $516 $522 $528 $534<br />

Note: Number of assessments is from CHCC’s 2009/10 Special Schedules <strong>and</strong> growth rate of 1%.<br />

CHCC’s estimated TRB in 2011$ (bottom line values from Table 3) was used in the first 6<br />

years of FINMOD’s TRB calculations.<br />

3.5 Typical Residential Bill <strong>for</strong> <strong>Sewerage</strong><br />

The 2009/2010 TBL report displays the TRB of $698. Council’s sewerage 2011/12 access<br />

charge is $720.<br />

Council has recently reviewed its sewerage budgets <strong>and</strong> had estimated the sewerage<br />

TRB <strong>for</strong> the next 6 financial years (See Table 4). The estimated TRBs are based on<br />

Council’s expected expenditure <strong>and</strong> income <strong>for</strong> each year in the next 6 years.<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 5


Table 4: <strong>Sewerage</strong> Budget<br />

Residential 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17<br />

<strong>Sewerage</strong><br />

Access Charge<br />

$17,803,584 $18,918,368 $19,971,165 $21,098,864 $22,018,853 $22,960,177<br />

Number of<br />

Assessments<br />

23,354 23,588 23,824 24,062 24,303 24,546<br />

TRB inflated<br />

(3% inflation)<br />

$762 $802 $838 $877 $906 $935<br />

TRB in 2011$ $762 $779 $790 $802 $805 $807<br />

Note: Number of assessments is from CHCC’s 2009/10 Special Schedules <strong>and</strong> growth rate of 1%.<br />

The estimated 2011/12 TRB ($762) is higher than Council’s 2011/12 access charge<br />

($720). Council advised that the number of residential assessments in the Special<br />

Schedules dot not reflect the exact number of residential bills issued by Council. i.e.<br />

multi-dwelling development could have several bills (access charge). There<strong>for</strong>e the<br />

estimated income from 2011/12 access charge ($17,803,584 - see Table 4) is higher<br />

than the income from actual access charge of $720 ($720 * 23,354 assessments =<br />

$16,814.880).<br />

The CHCC’s estimated TRB in 2011$ (bottom line values from Table 4) was used in the<br />

first 6 years of FINMOD’s TRB calculations.<br />

3.6 Typical Developer Charges<br />

Developer charges, together with the annual charges, are Council’s two sustainable<br />

sources of income. In order to project the annual charges, the income from developer<br />

charges needs to be estimated.<br />

The developer charges used <strong>for</strong> the purpose of the FINMOD calculations were the<br />

adopted charges from CHCC Development Servicing <strong>Plans</strong> <strong>for</strong> <strong>Water</strong> <strong>Supply</strong> <strong>and</strong><br />

<strong>Sewerage</strong>, 2010.<br />

For assessing the water supply developer charges <strong>for</strong> new development it was assumed<br />

that each new residential assessment will be 1 ET (Equivalent Tenement) <strong>and</strong> on<br />

average, each non-residential assessment will be 2 ET. For assessing the sewerage<br />

developer charges <strong>for</strong> the new development it was assumed that each new residential<br />

<strong>and</strong> non-residential assessment will be 1 ET. The developer charges used in FINMOD is<br />

shown in Table 5.<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 6


Table 5: Developer Charges (2011 $)<br />

Developer Charges <strong>Water</strong> <strong>Supply</strong> <strong>Sewerage</strong><br />

Residential $8,690 $8,309<br />

Non-residential $17,380 $8,309<br />

3.7 Operation, Maintenance <strong>and</strong> Administration Cost<br />

As a default, FINMOD increases the operations, maintenance <strong>and</strong> administration<br />

(OMA) costs in line with growth. These costs are adjusted annually <strong>for</strong> inflation. That is,<br />

the level of OMA costs per assessment remains constant in 2011 dollars. These default<br />

values can be overridden by estimates based on future changes to the operation or to<br />

cost variables (e.g. energy, labour).<br />

CHCC has estimated the cost increases related to maintenance, construction works,<br />

increased staff, jobs review <strong>and</strong> regrades. Based on this research Council advised that<br />

a cost escalation rate of 5.5% p.a. across all OMA expenditures should be used.<br />

There<strong>for</strong>e the FINMOD default OMA values (based on 3% inflation rate) were<br />

overridden using additional 2.5% increase on OMA costs. Population growth rate of 1%<br />

is also taken into account.<br />

The impact of the OMA costs increase on the OMA cost per assessment is provided in<br />

Table 6. The predicted high OMA cost per assessment at the end of the financial<br />

planning horizon has a major impact on the typical residential bills.<br />

Table 6: OMA Cost per Assessment<br />

2011/12 2040/41<br />

(2011$)<br />

2040/41<br />

(CPI inflated)<br />

<strong>Water</strong> <strong>Supply</strong> $275 $564 $1370<br />

<strong>Sewerage</strong> $480 $983 $2390<br />

3.8 Non-Residential Income<br />

One of the inputs to FINMOD is the proportion of income that will be provided from<br />

non-residential customers. This input variable has a significant impact on the outcomes,<br />

as typical residential bills are affected by the contribution of non-residential customers<br />

to the total annual income.<br />

The income splits calculated from the special schedules are shown in Table 7.<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 7


Table 7: Revenue Split (June 2011)<br />

Customer Group <strong>Water</strong> <strong>Supply</strong> <strong>Sewerage</strong><br />

Residential customers 77% 80%<br />

Non-residential customers 23% 20%<br />

For the financial modelling it was assumed that these ratios will continue <strong>for</strong> the next<br />

30 years.<br />

3.9 Capital Works Program<br />

<strong>Water</strong> supply <strong>and</strong> sewerage businesses are capital-intensive. The future capital works<br />

are the major factor impacting on the cost, <strong>and</strong> the charges required to fund the cost.<br />

The capital works program is divided into three categories:<br />

<br />

<br />

<br />

Improved levels of service (also referred to as subsidised scheme or backlog):<br />

Works required <strong>for</strong> improving services to existing development, such as<br />

providing reticulated sewerage to un-serviced villages, or improvements to the<br />

drinking water quality.<br />

Growth: works required to service growth.<br />

Renewals: replacement of assets that have reached their economic life.<br />

The 30 year capital works programs are included as appendices to the strategic<br />

business plan. The summary is shown in Table 8.<br />

Table 8: 30 Year Capital Works Program<br />

Group<br />

<strong>Water</strong> <strong>Supply</strong><br />

(2011 $’000)<br />

<strong>Sewerage</strong><br />

(2011 $’000)<br />

Improved Levels of Service $17,316 $15,973<br />

Growth $63,892 $81,984<br />

Renewals $25,301 $53,604<br />

Total $106,509 $151,561<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 8


4 Model Outputs<br />

The main output parameter of the financial plan is the typical residential bill (TRB) over<br />

the next 30 years. The TRB is the annual bill paid by a typical customer that is a<br />

customer who is not a pensioner <strong>and</strong> is using the average water dem<strong>and</strong>.<br />

The purpose of the modelling is to identify the lowest TRB that will enable Council to<br />

fund the operation, maintenance <strong>and</strong> development of the scheme. The TRB is used as<br />

a measure of af<strong>for</strong>dability, <strong>and</strong> it sets the price path Council needs to set in order to<br />

meet the levels of service. Further discussion about the first 6 financial years estimated<br />

TRBs is provided in sections 3.4 <strong>and</strong> 3.5.<br />

FINMOD provides full financial statements <strong>for</strong> each scheme, <strong>and</strong> <strong>for</strong> each case. The<br />

financial statements <strong>for</strong> the base case are included in this document.<br />

It is important to note that the financial outcomes (e.g. TRB, cash <strong>and</strong> investment) are<br />

shown in 2011 dollars. The figures shown here will be CPI-adjusted to reflect inflation.<br />

The financial modelling provides typical residential bill. Council needs to develop a<br />

tariff structure that will provide this income.<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 9


5 <strong>Water</strong> <strong>Supply</strong><br />

5.1 Financial Data<br />

The water supply fund had cash <strong>and</strong> investments totalling $41.8M <strong>and</strong> borrowings of<br />

$102.7M as of June 2011. According to Council’s loan repayment schedule, the existing<br />

loans will be repaid over 18 years with interest.<br />

5.2 Capital Works <strong>and</strong> Growth<br />

The capital works <strong>and</strong> growth projection are shown graphically in Figure 1.<br />

Figure 1: <strong>Water</strong> <strong>Supply</strong> Capital Works <strong>and</strong> Growth<br />

5.3 <strong>Water</strong> <strong>Supply</strong> Results<br />

The results are summarised in Figure 2. The main output parameters shown in the figure<br />

are (all in 2011/12 dollars).<br />

<br />

<br />

<br />

Typical residential bill: The financial modelling indicates that the estimated<br />

2011/12 TRB of $503 should be increased gradually <strong>for</strong> the next 5 years up to<br />

$550 (CPI adjusted). If the capital works program is not altered Council would<br />

be able to maintain the same TRB <strong>for</strong> the rest of the financial planning horizon<br />

(adjusted annually <strong>for</strong> CPI). CHCC is required to update the financial plan<br />

annually.<br />

Cash <strong>and</strong> investment: The modelling shows a significant reduction in the cash<br />

reserves in the first 10 years due to loans repayment <strong>and</strong> high capital<br />

investments; then it starts accumulating thereafter.<br />

Borrowings: Loans are required when the cash reserves are insufficient to fund<br />

the capital works. CHCC does not require new loans.<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 10


The modelling indicates that all the loans will be paid off within the 30 year planning<br />

period.<br />

Base Case 1<br />

600<br />

100000<br />

90000<br />

500<br />

80000<br />

400<br />

300<br />

70000<br />

60000<br />

50000<br />

40000<br />

200<br />

30000<br />

100<br />

0<br />

20000<br />

10000<br />

0<br />

Typical Residential Bills (2011/12$) Borrowing Outst<strong>and</strong>ing Cash <strong>and</strong> Investments<br />

Figure 2: <strong>Water</strong> <strong>Supply</strong> Base Case Results<br />

5.4 <strong>Water</strong> <strong>Supply</strong> Sensitivity Analysis<br />

A sensitivity analysis was carried out in order to assess the sensitivity of the results to the<br />

input parameters. 5 additional cases were modelled, as described below:<br />

<br />

Higher energy costs: The energy costs of operating the schemes is assumed to<br />

double in 5 years<br />

Slow growth: The growth projections were modified from the figures in Table 2,<br />

to a growth rate of 0.5% p.a. <strong>for</strong> residential <strong>and</strong> 0.25% p.a. <strong>for</strong> non-residential<br />

over the 30 year planning period<br />

<br />

<br />

<br />

High interest rates: The values given in Table 1 <strong>for</strong> borrowing interest rate <strong>and</strong><br />

deposit interest rate were increased to 10% <strong>and</strong> 9% respectively. This does not<br />

affect existing loans.<br />

High developer charges: The developer charges were changed from the<br />

values given in Table 5 to $10,000 per ET. This means a developer charge of<br />

$10,000 per new residential assessment <strong>and</strong> $20,000 <strong>for</strong> each new nonresidential<br />

assessment<br />

Low developer charges: The developer charges were changed from the<br />

values given in Table 5 to $6,000 per ET. This means a developer charge of<br />

$6,000 per new residential assessment <strong>and</strong> $12,000 <strong>for</strong> each new nonresidential<br />

assessment<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 11


The results of the sensitivity analysis are shown in Table 9.<br />

Table 9: <strong>Water</strong> <strong>Supply</strong> Sensitivity Analysis<br />

Case<br />

Long Term<br />

TRB (2011/12 $)<br />

Cash <strong>and</strong><br />

Investment in 30<br />

years (2011/12 $)<br />

Discussion<br />

1. Base Case<br />

$511, gradually increase,<br />

then $550<br />

$48.2M<br />

2. Higher<br />

Energy Cost<br />

$511, gradually increase,<br />

then $555<br />

$43M<br />

Higher energy costs result in small<br />

change in TRB <strong>and</strong> less cash<br />

than in the base case.<br />

3. Slow<br />

Growth<br />

$511, gradually increase,<br />

then $640<br />

$47M<br />

Slow growth reduces the income<br />

<strong>and</strong> less customers paying<br />

annual charges from developer<br />

charges resulting in higher bills<br />

<strong>and</strong> similar cash than in the base<br />

case.<br />

4. High<br />

Interest<br />

$511, gradually increase,<br />

then $530<br />

$45.3M<br />

Considering no new loans are<br />

required, the cash reserves will<br />

generate more interest income,<br />

resulting in reduction to the TRB.<br />

5. High<br />

Developer<br />

Charge<br />

$511, gradually increase,<br />

then $535<br />

$46.8M<br />

Higher developer charges<br />

increases the income from<br />

developer resulting in lower TRB.<br />

6. Low<br />

Developer<br />

Charge<br />

$511 gradually increase<br />

then $575<br />

$49.1M<br />

Lower developer charges<br />

reduce the income from<br />

developer resulting in higher bills.<br />

The sensitivity analysis aims to maintain similar amount of cash at the end of the<br />

financial planning. The TRB needs to be adjusted accordingly to ensure positive cash<br />

reserves throughout the 30 year planning horizon.<br />

This analysis indicates that CHCC water supply financial plan is sensitive to growth <strong>and</strong><br />

lower developer charges, mildly sensitive to higher interest rate <strong>and</strong> higher developer<br />

charge <strong>and</strong> only marginally sensitive to higher energy cost.<br />

The following figures show a comparison of the cases. In all cases the TRB at the end of<br />

the period is almost the same.<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 12


Typical Residential Bills (2011/12$)<br />

700<br />

700<br />

600<br />

600<br />

500<br />

500<br />

400<br />

400<br />

300<br />

300<br />

200<br />

200<br />

100<br />

100<br />

0<br />

0<br />

1 Base Case 1<br />

2 Case 2 - Higher Energy Cost<br />

3 Case 3 - Low Growth<br />

4 Case 4 - Higher Inflation<br />

5 Case 5 - Higher Developer Charges<br />

6 Case 6 - Lower Developer Charges<br />

Figure 3: TRB <strong>Water</strong> <strong>Supply</strong> Sensitivity Analysis<br />

Cash <strong>and</strong> Investments<br />

50000<br />

45000<br />

40000<br />

35000<br />

30000<br />

25000<br />

20000<br />

15000<br />

10000<br />

5000<br />

0<br />

50000<br />

45000<br />

40000<br />

35000<br />

30000<br />

25000<br />

20000<br />

15000<br />

10000<br />

5000<br />

0<br />

1 Base Case 1<br />

2 Case 2 - Higher Energy Cost<br />

3 Case 3 - Low Growth<br />

4 Case 4 - Higher Inflation<br />

5 Case 5 - Higher Developer Charges<br />

6 Case 6 - Lower Developer Charges<br />

Figure 4: Cash <strong>and</strong> Investment <strong>Water</strong> <strong>Supply</strong> Sensitivity Analysis<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 13


Borrowing Outst<strong>and</strong>ing<br />

100000<br />

90000<br />

80000<br />

70000<br />

60000<br />

50000<br />

40000<br />

30000<br />

20000<br />

10000<br />

0<br />

100000<br />

90000<br />

80000<br />

70000<br />

60000<br />

50000<br />

40000<br />

30000<br />

20000<br />

10000<br />

0<br />

1 Base Case 1<br />

2 Case 2 - Higher Energy Cost<br />

3 Case 3 - Low Growth<br />

4 Case 4 - Higher Inflation<br />

5 Case 5 - Higher Developer Charges<br />

6 Case 6 - Lower Developer Charges<br />

Figure 5: Borrowing <strong>Water</strong> <strong>Supply</strong> Sensitivity Analysis<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 14


6 <strong>Sewerage</strong> Scheme<br />

6.1 Financial Data<br />

The sewerage scheme had cash <strong>and</strong> investments totalling $73.2M <strong>and</strong> borrowings of<br />

$124.4M as of June 2011. According to Council’s loan repayment schedule, the existing<br />

loans will be repaid over 17 years with interest.<br />

6.2 Capital Works <strong>and</strong> Growth<br />

The capital works <strong>and</strong> growth <strong>for</strong>ecasts are shown in Figure 6.<br />

Figure 6: <strong>Sewerage</strong> Capital Works <strong>and</strong> Growth<br />

6.3 <strong>Sewerage</strong> Results<br />

The results are summarised in Figure 7. The main output parameters shown in the figure<br />

are (all in 2011/12 dollars).<br />

<br />

<br />

<br />

Typical residential bill: The financial modelling indicates that the estimated<br />

2011/12 TRB of $762 should be increased gradually <strong>for</strong> the next 10 years up to<br />

$890 (adjusted annually <strong>for</strong> CPI). CHCC is required to update the financial plan<br />

annually.<br />

Cash <strong>and</strong> investment: The modelling indicates reduction in cash reserves in the<br />

first 10 years. After that, cash starts accumulating when the existing loans are<br />

almost paid off <strong>and</strong> the capital investment is low. The cash starts dropping<br />

again on the last 3 years of the planning horizon due to predicted high OMA<br />

costs. Council will review these figures in the next financial plans to ensure the<br />

TRB are sufficient to recover Council’s expenses.<br />

Borrowings: Additional borrowing will be required from 2015 until 2021 to meet<br />

the capital works program <strong>and</strong> ensure sufficient reserves in those years.<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 15


The modelling indicates that all the loans will be paid off within the 30 year planning<br />

period.<br />

Base Case 1<br />

900<br />

120000<br />

800<br />

700<br />

600<br />

500<br />

100000<br />

80000<br />

60000<br />

400<br />

300<br />

200<br />

100<br />

40000<br />

20000<br />

0<br />

0<br />

-20000<br />

Typical Residential Bills (2011/12$) Borrowing Outst<strong>and</strong>ing Cash <strong>and</strong> Investments<br />

Figure 7: <strong>Sewerage</strong> Base Case Results<br />

6.4 <strong>Sewerage</strong> Sensitivity Analysis<br />

A sensitivity analysis was carried out in order to assess the sensitivity of the results to the<br />

input parameters. Five additional cases were modelled, as described below:<br />

<br />

Higher energy costs: The energy costs of operating the schemes is assumed to<br />

double in 5 years<br />

Slow growth: The growth projections were modified from the figures in Table 2,<br />

to a growth rate of 0.5% p.a. <strong>for</strong> residential <strong>and</strong> 0.25% p.a. <strong>for</strong> non-residential<br />

over the 30 year planning period<br />

<br />

<br />

<br />

High interest rates: The values given in Table 1 <strong>for</strong> borrowing interest rate <strong>and</strong><br />

deposit interest rate were increased to 10% <strong>and</strong> 9% respectively. This does not<br />

affect existing loans.<br />

High developer charges: The developer charges were changed from the<br />

values given in Table 5 to $10,000 per ET.<br />

Low developer charges: The developer charges were changed from the<br />

values given in Table 5 to $6,000 per ET.<br />

The results of the sensitivity analysis are shown in Table 10.<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 16


Table 10: <strong>Sewerage</strong> Sensitivity Analysis<br />

Case<br />

Long Term<br />

TRB (2011/12 $)<br />

Cash <strong>and</strong><br />

Investment in 30<br />

years (2011/12 $)<br />

Discussion<br />

1. Base Case<br />

$762, gradually increase,<br />

then $890<br />

$27.4M<br />

2. Higher<br />

Energy Cost<br />

$762, gradually increase,<br />

then $960<br />

$25.3M<br />

Higher energy costs result in<br />

higher.<br />

3. Slow<br />

Growth<br />

$762, gradually increase<br />

then $960 <strong>and</strong> increase to<br />

$1100 in the last 6 years of<br />

the planning horizon<br />

$24.6M<br />

Slow growth reduces the income<br />

from annual charges <strong>and</strong> from<br />

developer charges requiring<br />

increase in the TRB.<br />

4. High<br />

Interest<br />

$762, gradually increase,<br />

then $880<br />

$24.5M<br />

Small reduction in TRB.<br />

5. High<br />

Developer<br />

Charge<br />

$762, gradually increase,<br />

then $865<br />

$24M<br />

Higher developer charges<br />

increases the income from<br />

developer resulting in reduction<br />

of the TRB<br />

6. Low<br />

Developer<br />

Charge<br />

$762, gradually increase,<br />

then $900<br />

$25.4M<br />

Lower developer charges<br />

reduces the income from<br />

developers there<strong>for</strong>e requiring<br />

increase in the TRB<br />

The sensitivity analysis was undertaken keeping similar amount of cash at the end of the<br />

financial plan.<br />

This analysis indicates that CHCC sewerage financial plan is very sensitive to high<br />

energy cost, growth <strong>and</strong> higher developer charges <strong>and</strong> marginally sensitive to other<br />

input parameters. This notwithst<strong>and</strong>ing, a major change to any of the input parameters<br />

will have an impact on the required TRB.<br />

The following figures show a comparison of the cases.<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 17


Typical Residential Bills (2011/12$)<br />

1200<br />

1200<br />

1000<br />

1000<br />

800<br />

800<br />

600<br />

600<br />

400<br />

400<br />

200<br />

200<br />

0<br />

0<br />

1 Base Case 1<br />

2 Case 2 - Higher Energy Costs<br />

3 Case 3 - Low Growth<br />

4 Case 4 - Higher Inflation<br />

5 Case 5 - Higher Developer Charges<br />

6 Case 6 - Lower Developer Charges<br />

Figure 8: TRB <strong>Sewerage</strong> Sensitivity Analysis<br />

Cash <strong>and</strong> Investments<br />

60000<br />

60000<br />

50000<br />

50000<br />

40000<br />

40000<br />

30000<br />

30000<br />

20000<br />

20000<br />

10000<br />

10000<br />

0<br />

0<br />

1 Base Case 1<br />

2 Case 2 - Higher Energy Costs<br />

3 Case 3 - Low Growth<br />

4 Case 4 - Higher Inflation<br />

5 Case 5 - Higher Developer Charges<br />

6 Case 6 - Lower Developer Charges<br />

Figure 9: Cash <strong>and</strong> Investment <strong>Sewerage</strong> Sensitivity Analysis<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 18


Borrowing Outst<strong>and</strong>ing<br />

120000<br />

120000<br />

100000<br />

100000<br />

80000<br />

80000<br />

60000<br />

60000<br />

40000<br />

40000<br />

20000<br />

20000<br />

0<br />

0<br />

-20000<br />

-20000<br />

1 Base Case 1<br />

2 Case 2 - Higher Energy Costs<br />

3 Case 3 - Low Growth<br />

4 Case 4 - Higher Inflation<br />

5 Case 5 - Higher Developer Charges<br />

6 Case 6 - Lower Developer Charges<br />

Figure 10: Borrowing <strong>Sewerage</strong> Sensitivity Analysis<br />

March 2012<br />

HydroScience Consulting<br />

CHCC Financial Plan Page 19


Appendix E<br />

Integrated <strong>Water</strong> Cycle Management Plan<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 106


COFFS HARBOUR WATER<br />

ADDENDUM TO THE COFFS HARBOUR WATER<br />

INTEGRATED WATER CYCLE<br />

MANAGEMENT CONCEPT STUDY<br />

FEBRUARY 2010<br />

Coffs Harbour City Council<br />

2 Castle Street<br />

Coffs Harbour NSW 2450<br />

Telephone: (02) 6648 4000<br />

Fax: (02) 6648 4199<br />

Document Control<br />

Approved <strong>for</strong> Issue<br />

Revision Author Reviewer Name Signature Date<br />

0 P Sparke S Thorn S Thorn<br />

G Powter G Powter


1. INTRODUCTION<br />

Summary of the Integrated <strong>Water</strong> Cycle Management Process<br />

The Coffs Harbour <strong>Water</strong> Integrated <strong>Water</strong> Cycle Management Concept Study <strong>and</strong> this<br />

Addendum to the Coffs Harbour <strong>Water</strong> Integrated <strong>Water</strong> Cycle Management Concept<br />

Study finalises documentation in regard to the Integrated <strong>Water</strong> Cycle Management<br />

Process promoted by The Department of <strong>Water</strong> <strong>and</strong> Energy. These documents together<br />

constitute Council’s IWCM Evaluation Study. The IWCM Evaluation Study culminates<br />

from a two part process.<br />

The first part of the process involved the completion of a Integrated <strong>Water</strong> Cycle<br />

Management Concept Study, which in accordance with Department of <strong>Water</strong> <strong>and</strong> Energy<br />

(DWE) Guidelines, identifies <strong>and</strong> prioritises issues that need to be managed by Coffs<br />

Harbour City Council into the future. The Concept Study report <strong>for</strong> Coffs Harbour City<br />

Council was finalised in August 2006.<br />

The second part of the process provides an Addendum to the Concept Study that<br />

addresses those issues <strong>and</strong> priorities identified from the concept study. The Department<br />

of <strong>Water</strong> <strong>and</strong> Energy provides a number of alternatives in which the strategy<br />

documentation can be <strong>for</strong>mulated, depending on the findings of The Concept Study report.<br />

As Coffs Harbour City Council has well developed existing strategies in place, that firmly<br />

plan its future actions, <strong>and</strong> with major infrastructure construction <strong>and</strong> upgrade programs<br />

being delivered supporting these strategies, the concept study found only a narrow range<br />

of actions required to complete the IWCM Strategy process.<br />

These findings correlate to CHW taking a “<strong>Business</strong> as Usual” approach <strong>and</strong> <strong>for</strong>mulating<br />

its IWCM Evaluation Study Strategy document via the issuing of this addendum to The<br />

Concept Study Report.<br />

This addendum focuses on issues identified from The Concept Study, <strong>and</strong> examines these<br />

in detail, providing further in<strong>for</strong>mation on how these issues are being addressed. In most<br />

cases, the issues identified have been found to be addressed via existing strategies or<br />

Management <strong>Plans</strong>.<br />

The Coffs Harbour <strong>Water</strong> Cycle Management Concept Study<br />

The Integrated <strong>Water</strong> Cycle Management Concept study was completed <strong>for</strong> Coffs Harbour<br />

City Council by engineering consultants, John Wilson <strong>and</strong> Partners Pty Ltd (JWP), <strong>and</strong> a<br />

copy of this report, entitled ‘Coffs Harbour <strong>Water</strong>, Integrated <strong>Water</strong> Cycle Management<br />

Concept Study, August 2006’ is attached <strong>for</strong> reference.<br />

The concept study appears to place Coffs Harbour <strong>Water</strong> in a good situation in regard to<br />

Integrated <strong>Water</strong> Cycle Management <strong>and</strong> the executive summary of the study identifies<br />

CHW as a local water utility that ‘continually plans <strong>for</strong> the on-going provision of services<br />

<strong>and</strong> implements industry best-practice management practices’.<br />

The concept study refers to major initiatives (infrastructure works <strong>and</strong> advanced planning)<br />

to support future growth in Coffs Harbour <strong>and</strong> its surrounding region. These initiatives<br />

have involved extensive consultation phases <strong>and</strong> include:<br />

Addendum to the Coffs Harbour <strong>Water</strong> Integrated <strong>Water</strong> Cycle Management Concept Study<br />

Coffs Harbour City Council Page 1


- The implementation of the Regional <strong>Water</strong> <strong>Supply</strong> Scheme, including the construction of<br />

Shannon Creek Dam <strong>and</strong> associated major pipeline works to improve bulk raw water<br />

supply security. Construction of the Shannon Ck Dam was completed in late 2008.<br />

- The construction of a new water treatment facility to treat <strong>and</strong> improve water quality <strong>for</strong><br />

the majority of potable water provided by CHW. The water treatment facility at Karangi<br />

was opened in early 2009.<br />

- Construction, augmentation <strong>and</strong> major upgrade works to Council’s sewerage treatment<br />

plants. This includes the construction of new facilities at Coffs Harbour to upgrade its<br />

design capacity from a 42,000 equivalent population to a 72,000 equivalent population,<br />

while providing considerably improved reclaimed water <strong>and</strong> biosolid quality. The facility<br />

was opened in mid 2009.<br />

- The expansion of Council’s reclaimed water network. Trunk mains are installed that run<br />

from the Woolgoolga <strong>Sewerage</strong> Treatment Plant to the Coffs Harbour <strong>Sewerage</strong><br />

Treatment Plant. Reclaimed water reuse is a key component of the IWCM strategy.<br />

In regard to urban stormwater management, the concept study identifies that there are<br />

Urban Stormwater Management <strong>Plans</strong> in place <strong>and</strong> that a water sensitive design policy<br />

was adopted by Coffs Harbour City Council on the 25 June 2009.<br />

Although many aspects of the report were favourable to CHCC, the study identified some<br />

issues requiring further consideration <strong>and</strong> possible action by CHCC. These issues were<br />

consolidated <strong>and</strong> presented as 10 tasks within the IWCM Concept Study. They are<br />

detailed in pages 59 to 62 of the concept study report. Responses to these tasks are<br />

provided within this addendum report.<br />

To assist in prioritising the 10 tasks, the IWCM Concept Study Project Reference Group<br />

drew from a range of issues that had been raised <strong>for</strong> consideration during the Concept<br />

Study Process. The issues <strong>for</strong> consideration are summarised within Tables 25 <strong>and</strong> 26 of<br />

the Concept Study Report (pages 46 to 50).<br />

Within this Addendum to the IWCM Concept Study, reference tables are provided that<br />

respond to the issues within tables 25 <strong>and</strong> 26 that are within the scope of the IWCM<br />

process.<br />

A Conclusions section finalises The IWCM Concept Study Addendum. A brief outline of<br />

the strategies in place <strong>for</strong> key IWCM components is provided. It then identifies remaining<br />

tasks proposed <strong>for</strong> completion prior to the next IWCM review cycle.<br />

Addendum to the Coffs Harbour <strong>Water</strong> Integrated <strong>Water</strong> Cycle Management Concept Study<br />

Coffs Harbour City Council Page 2


Appendix F<br />

State of the Environment Report<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 110


Coffs Harbour<br />

State of the Environment<br />

Supplementary Report 2010<br />

Welcome to Coffs Harbour’s State of the Environment Report covering the period from 1 July<br />

2009 to 30 June 2010. This is a supplementary State of the Environment (SoE) Report which<br />

should be read in conjunction with the 2009 Comprehensive SoE Report <strong>and</strong> the previous<br />

Supplementary Reports as well as the 2009/2012 Management Plan. This SoE is an important<br />

reference <strong>for</strong> key decision-making by Council <strong>and</strong> the community.<br />

SoE reporting is part of a continuous improvement framework <strong>for</strong> the community <strong>and</strong> Council. It is<br />

designed to report on our ability as a community to look after our environment <strong>and</strong> our future.<br />

Apart from the first section (1.0), the report does not solel y reflect upo n the perfo rmance of<br />

Council, rather it reports on our per<strong>for</strong>mance as individuals <strong>and</strong> as a community.<br />

The state of the environment is ultimately the responsibility of every citizen <strong>and</strong> is impacted upon<br />

by every choice that we as individuals <strong>and</strong> collectively as a community make, every day- from the<br />

consumer <strong>and</strong> food products that we purchase through to the size of our cars <strong>and</strong> houses <strong>and</strong><br />

the kinds of lifestyles that we lead.<br />

2009/10 Context<br />

In February 2010 the Who Cares about the Envi ronment in 200 9 report was released by the<br />

Department of Environment Climate Change <strong>and</strong> <strong>Water</strong>. This shows us how people in NSW feel<br />

about the environment <strong>and</strong> how they are responding to environmental issues, now <strong>and</strong> over time.<br />

The results indicated that the environment remains a top priority <strong>for</strong> people with the environment<br />

ranking in the top five issues <strong>for</strong> government attention. <strong>Water</strong> related issues <strong>and</strong> climate change<br />

are the two top environmental concerns <strong>for</strong> the community. Who Cares about the Environment in<br />

2009 provides us with in<strong>for</strong>mation about community views. This helps us in democratically<br />

elected government to design programs that are responsive to community needs.<br />

Trends<br />

Apparent trends in relation to data collected over time are summarised in the “Trends at a<br />

Glance” tables found in the report. A √ or X denotes that the indicator trend is improving/ not<br />

improving when considering the average of the last three years of data. A indicates that<br />

in<strong>for</strong>mation is unavailable or a trend is not yet clear. Overall theme trends have been based upon<br />

an average of all of the indicators used <strong>for</strong> that theme. Overall theme trends are described in<br />

terms of the following categories:<br />

Condition<br />

improving<br />

Condition<br />

steady<br />

Condition<br />

declining<br />

Condition<br />

uncertain<br />

pressure declining pressure steady pressure increasing in<strong>for</strong>mation unavailable<br />

Action<br />

Actions have been taken from the 2009 Comprehensive State of Environment Report. A √<br />

indicates that the action is underway. An X indicates this action has not yet been addressed.<br />

How is our overall environmental per<strong>for</strong>mance<br />

In comparison to the previous reporting years (illustrated below), the majority of indicators<br />

suggest that the status quo remains unchanged, with the exception of three of the reporting<br />

areas- Sustainability <strong>and</strong> Council, Heritage <strong>and</strong> Human Settlements.<br />

2


Appendix G<br />

Dem<strong>and</strong> Management Plan<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 113


<strong>Water</strong> <strong>Supply</strong><br />

Dem<strong>and</strong><br />

Management Plan<br />

Executive Summary<br />

This dem<strong>and</strong> management plan provides Coffs Harbour <strong>Water</strong> (CHW) with an<br />

action plan to continue to improve water use efficiency within the CHW<br />

service area including the towns of:<br />

• Coffs Harbour urban area • Moonee/ Sapphire<br />

• Woolgoolga/Safety<br />

Beach/Mullaway/Arrawarra<br />

• Sawtell/ Toormina/ Boambee<br />

East<br />

• S<strong>and</strong>y Beach/ Emerald Beach • Corindi<br />

• Bonville • Korora<br />

• Boambee West<br />

• Coramba<br />

• Nana Glen<br />

The current annual dem<strong>and</strong>s <strong>for</strong> water are:<br />

• 200 kL/tenement/year across the Coffs Harbour water supply system;<br />

• 193 kL/tenement/year in Cormaba; <strong>and</strong><br />

• 146 kL/tenement/year in Nana Glen.<br />

These figures are below the state median of 215 kL/year.<br />

The low water dem<strong>and</strong>s already being experienced within CHW’s service area<br />

are a result of the utility’s active implementation of water efficiency<br />

programs. A variety of water efficiency programs have been in place in the<br />

service area since 1989. These programs have acted to maintain an almost<br />

uni<strong>for</strong>m level of total consumption in the service area despite the fact that<br />

the population of the service area has increased by 57% over this time.<br />

Population <strong>and</strong> population growth are key dem<strong>and</strong> drivers. Population in the<br />

service areas is expected to continue to increase at a rate of 1.2% per<br />

annum over the next 30 years.<br />

Due to the very efficient water use already occurring within CHW’s service<br />

area, the potential <strong>for</strong> further water savings per tenant is lower. However,<br />

maintenance of the achievements already made is an important aspect of<br />

this dem<strong>and</strong> plan. Similarly, ensuring new development is also efficient is a<br />

focus of this plan.<br />

The potential benefits of a dem<strong>and</strong> management program are not only to<br />

improve the efficiency of water resource use, but also to delay capital works<br />

costs <strong>for</strong> new infrastructure <strong>and</strong> to reduce the operational costs of providing<br />

town water services. This in turn leads to lower water supply rates <strong>for</strong> the<br />

consumer, a more secure water supply into the future <strong>and</strong> leaves more<br />

water <strong>for</strong> environmental uses. Balancing investment in dem<strong>and</strong> management<br />

initiatives with supply-side investment, such as the provision of more dam<br />

storage capacity, is a best practice management approach <strong>for</strong> a water utility.<br />

Appendix G_Coffs Harbour Dem<strong>and</strong> Management Plan REV 1 August 2006


<strong>Water</strong> <strong>Supply</strong><br />

Dem<strong>and</strong><br />

Management Plan<br />

This plan is based on an analysis of historical dem<strong>and</strong> <strong>and</strong> a series of<br />

<strong>for</strong>ecasts developed using the Department of Energy, Utilities <strong>and</strong><br />

Sustainability (DEUS) Decision Support System (DSS). The DSS is a water<br />

dem<strong>and</strong> modelling tool which allows <strong>for</strong> the assessment (on a cost-benefit<br />

basis) of the impact of different dem<strong>and</strong> management actions in reducing<br />

dem<strong>and</strong> over a period of 30 years.<br />

Cost-benefit analysis of a number of dem<strong>and</strong> management measures<br />

demonstrated that the most effective methods to reduce water dem<strong>and</strong> in<br />

the CHW service area were:<br />

• Further implementation of best practice pricing; <strong>and</strong> the<br />

• Promotion of the BASIX framework, including alternate water sources<br />

such as rainwater tanks <strong>and</strong> water efficient appliances such as low flow<br />

showerheads.<br />

Both permanent restrictions <strong>and</strong> unaccounted <strong>for</strong> water programs are<br />

expected to reduce water dem<strong>and</strong> but a lot less effectively in terms of the<br />

cost-benefit ratio.<br />

Forecast modelling of the impact of these actions on water dem<strong>and</strong>s showed<br />

that they may be effective in achieving an 11% reduction in total system<br />

average day water dem<strong>and</strong> over the next 30 years.<br />

Based on the outcomes of the modelling, this plan contains an investment<br />

program <strong>for</strong> CHW to implement in order to realise the expected water<br />

savings.<br />

This plan was determined based on the available CHW water dem<strong>and</strong> data.<br />

Generally, the existing data utilised was adequate. However, the<br />

classification of residential assessments as single dwellings or multiresidential<br />

assessments needs to be updated <strong>and</strong> recorded within the<br />

customer billing database to ensure that future analysis of dem<strong>and</strong><br />

in<strong>for</strong>mation can be achieved quickly <strong>and</strong> simply.<br />

Appendix G_Coffs Harbour Dem<strong>and</strong> Management Plan REV 1 August 2006


Appendix H<br />

Drought Management Plan<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 116


Executive Summary<br />

The recent construction of the Regional <strong>Water</strong> <strong>Supply</strong> Scheme (RWSS) has effectively<br />

ensured Coffs Harbour City Council's water security <strong>for</strong> many years to come. Thus, the<br />

impact of any future drought on Coffs Harbour's water supply is expected to be minimal.<br />

However, this plan has been developed to address any supply problems that may arise<br />

<strong>and</strong> to ensure Coffs Harbour is prepared <strong>for</strong> extreme drought.<br />

The underlying approach of this plan is to address drought in accordance with the NSW<br />

Office of <strong>Water</strong>’s Best-Practice Management Guidelines <strong>and</strong> the <strong>Water</strong> Directorate<br />

Guidelines.<br />

This plan is presented to satisfy NSW Office of <strong>Water</strong> Best-Practice Management<br />

Guidelines’ requirement <strong>and</strong> aims to regulate water supply in the events of reduced<br />

supply in Coffs Harbour City. It includes actions <strong>and</strong> responses to drought situations that<br />

may affect the Council’s water supplies.<br />

This Drought Management Plan provides a series of scenarios <strong>and</strong> actions required by<br />

CHW to respond to drought situations. These responses are in the <strong>for</strong>m of water<br />

restrictions <strong>and</strong> options <strong>for</strong> additional actions addressing both dem<strong>and</strong> <strong>and</strong> supply.<br />

CHW operates three water supply systems. The biggest system, Coffs Harbour <strong>Water</strong><br />

<strong>Supply</strong>, supplies water to coastal consumers from Sawtell in the South to Corindi Beach in<br />

the North. The system draws water from Orara River, Nymboida River <strong>and</strong> Shannon<br />

Creek Dam. Two other small systems supply water <strong>for</strong> Coramba <strong>and</strong> Nana Glen villages.<br />

When surface water supply is reduced in Coffs Harbour LGA due to such issues as<br />

drought, storage in Karangi Dam <strong>and</strong> Shannon Creek Dam become the triggers <strong>for</strong><br />

water supply restriction levels.<br />

Dem<strong>and</strong> side drought measures are particularly critical to Coffs Harbour City when<br />

available surface water is reduced. <strong>Supply</strong> side drought measures examined potential<br />

options that would provide drought security <strong>for</strong> the towns. These include:<br />

Accessing “dead” storage.<br />

Access water in Woolgoolga Dam<br />

Developing new bores<br />

<strong>Water</strong> carting.<br />

Council also needs to ensure there are appropriate documented drought<br />

communication systems in place. These are needed to implement <strong>and</strong> to monitor the<br />

effectiveness of the drought system implementation. This will ensure the community is<br />

in<strong>for</strong>med in a timely manner <strong>and</strong> comply with restriction requirements.<br />

Drought Management is subject to weather variability <strong>and</strong> consumer reaction to<br />

restrictions. This Plan provides a guide to management of drought <strong>and</strong> will need to be<br />

varied if circumstances require.<br />

March 2012<br />

Appendix H_Drought Management Plan_<br />

ExecSummary.doc<br />

HydroScience Consulting<br />

Page 2


<strong>Water</strong> Restrictions Policy<br />

Policy Statement<br />

During periods when the water supply system has difficulty in coping with weather conditions <strong>and</strong><br />

consumption rates, it is necessary to restrict water usage. This policy provides the conditions <strong>and</strong><br />

restrictions to be imposed.<br />

Related Legislation, Circulars or Guidelines (as amended)<br />

• Local Government Act 1993<br />

• Local Government (General) Regulation 2005<br />

• Coffs Harbour <strong>Water</strong> - Drought Management Plan 2006<br />

• Coffs Harbour <strong>Water</strong> - Dem<strong>and</strong> Management Plan 2006<br />

Does this Document Replace an Existing Policy, Procedure or Plan<br />

Yes, this document replaces Council's:<br />

• <strong>Water</strong> Restrictions Policy 5/12/2002 <strong>and</strong> 15/12/2005<br />

Related Council Policy or Procedure<br />

• None<br />

Application <strong>and</strong> Distribution<br />

It is m<strong>and</strong>atory <strong>for</strong> all Council officials to comply with this Policy.<br />

This Policy <strong>and</strong> Guidelines is available on Council’s website under Council Policies.<br />

Approved by:<br />

Executive Team……………………………………....<br />

[Meeting date]<br />

Signature:<br />

__________________________________<br />

General Manager<br />

Council ………………………………………………..<br />

[Meeting date & Resolution No.]<br />

24/09/2009 Resolution C52<br />

Effective: 24/09/2009<br />

Review Date:<br />

<strong>Water</strong> Restrictions Policy Sept 2009 1


Distribution :<br />

Record Number:<br />

Responsible Council Department/Officer: Coffs Harbour <strong>Water</strong><br />

Version History Table:<br />

Key Responsibilities<br />

Position Directorate Responsibility<br />

Mayor Council To lead Councillors in their underst<strong>and</strong>ing of, <strong>and</strong> compliance with, this Policy<br />

<strong>and</strong> Guidelines.<br />

General<br />

Manager<br />

Executive<br />

Manager<br />

Operations<br />

Directors<br />

Director of<br />

Corporate<br />

Services<br />

Executive<br />

Manager HR<br />

&<br />

Organisational<br />

Development<br />

Executive <strong>and</strong><br />

Managers<br />

In<strong>for</strong>mation<br />

Technology<br />

Manager<br />

All Council<br />

officials<br />

Executive<br />

All<br />

Directorates<br />

Corporate<br />

<strong>Business</strong><br />

Corporate<br />

<strong>Business</strong><br />

All<br />

Directorates<br />

Corporate<br />

<strong>Business</strong><br />

Council<br />

To lead staff (either directly or through delegated authority) in their<br />

underst<strong>and</strong>ing of, <strong>and</strong> compliance with, this Policy <strong>and</strong> Guidelines.<br />

To approve resources to develop, implement <strong>and</strong> review this Policy <strong>and</strong><br />

Guidelines.<br />

To advise the General Manager with regard to current situation of the water<br />

supply storages <strong>and</strong> the impact of current droughts or drought <strong>for</strong>ecasts.<br />

To communicate, implement <strong>and</strong> comply with this Policy <strong>and</strong> related<br />

Guidelines.<br />

To ensure (directly or through delegation) the distribution <strong>and</strong> communication<br />

of the Policy <strong>and</strong> Guidelines to specified persons.<br />

To ensure (directly or through delegation) the approved Policy <strong>and</strong> Guidelines<br />

are available in hard copy <strong>and</strong> electronically on Council’s website.<br />

Facilitate the provision of regular training to all Council officials on their role<br />

<strong>and</strong> responsibilities in relation to this Policy, Guidelines <strong>and</strong> related<br />

procedures.<br />

To implement this Policy, Guidelines <strong>and</strong> related procedures.<br />

To lead staff in their underst<strong>and</strong>ing of, <strong>and</strong> compliance with, this Policy <strong>and</strong><br />

Guidelines<br />

To assist with the development of systems to support public access to this<br />

Policy, Guidelines <strong>and</strong> related in<strong>for</strong>mation.<br />

To comply with this Policy, Guidelines <strong>and</strong> related procedures.<br />

<strong>Water</strong> Restrictions Policy Sept 2009 2


<strong>Water</strong> Restrictions<br />

Policy Guidelines<br />

1. Introduction<br />

The General Manager be delegated the authority to impose restrictions in accordance with<br />

the levels below.<br />

The restriction level option imposed may be altered at the discretion of the General Manager,<br />

after consultation with Council, dependent on dam capacity, consumption rates, Orara <strong>and</strong><br />

Nymboida River flows, weather conditions, long range <strong>for</strong>ecast <strong>and</strong> the season.<br />

RESTRICTION CONDITION TARGET<br />

LEVEL<br />

LEVEL 1 Sprinklers <strong>and</strong> fixed hoses may be used outside the<br />

CONSUMPTION<br />

REDUCTION<br />

Awareness<br />

hours of 8 am – 4 pm<br />

17/6/04 - Council introduced PERMANENT Level One<br />

<strong>Water</strong> Restrictions <strong>for</strong> the Coffs Harbour Local Government Area<br />

LEVEL 2 Sprinklers <strong>and</strong> fixed hoses are banned. 5%<br />

Micro-sprays <strong>for</strong> 15 minutes <strong>and</strong> h<strong>and</strong> held hoses <strong>for</strong> 2<br />

hours every second day, outside the hours of 8 am <strong>and</strong> 4<br />

pm, on odd or even days matching house numbering<br />

system<br />

LEVEL 3 Sprinklers <strong>and</strong> fixed hoses banned. 10%<br />

Micro-sprays <strong>for</strong> 15 minutes <strong>and</strong> h<strong>and</strong> held hoses <strong>for</strong> 1 hour<br />

every second day, outside the hours of 8 am <strong>and</strong> 4 pm, on<br />

odd or even days matching house numbering system<br />

LEVEL 4 Sprinklers <strong>and</strong> fixed hoses banned. 15%<br />

Micro-sprays <strong>for</strong> 15 minutes <strong>and</strong> h<strong>and</strong> held hoses <strong>for</strong> ½<br />

hour every second day, outside the hours of 8 am <strong>and</strong> 4<br />

pm, on odd or even days matching house numbering<br />

system<br />

LEVEL 5 Use of Sprinklers, micro-sprays, fixed <strong>and</strong> h<strong>and</strong> held hoses 20%<br />

banned. Gardens can be watered by buckets only.<br />

LEVEL 6 All external use of water banned. Gardens can be watered 25%<br />

with grey water only.<br />

LEVEL 7 Emergency <strong>Water</strong> <strong>Supply</strong> Management - as directed by Council<br />

95 litres/<br />

person/day<br />

<strong>Water</strong> Restrictions Policy Sept 2009 3


2. Definitions<br />

N/A<br />

3. Objectives<br />

The objective of Council’s <strong>Water</strong> Restrictions Policy <strong>and</strong> Guidelines is to-<br />

• Implement water restrictions when conditions call <strong>for</strong> it<br />

4. Policy Statement<br />

Council's <strong>Water</strong> Restrictions Policy <strong>and</strong> Guidelines is underpinned by the following principles-<br />

4.1 Access<br />

• Public access to in<strong>for</strong>mation about <strong>Water</strong> Restrictions Policy will be through Council's<br />

website.<br />

• Reasonable access assistance will be available to persons with special needs<br />

4.2 Responsiveness <strong>and</strong> Accountability<br />

• Where drought conditions occur <strong>and</strong> dependent on dam capacity, consumption rates,<br />

Orara <strong>and</strong> Nymboida River flows, weather conditions, long range <strong>for</strong>ecast <strong>and</strong> the<br />

season, the General Manager has the authority to impose restrictions in accordance<br />

with the levels outlined in this policy.<br />

4.3 Privacy <strong>and</strong> Confidentiality<br />

• The principles of Council's Privacy Management Plan will be applied.<br />

4.4 Integrity, Dignity <strong>and</strong> Respect<br />

• Council treats all persons with courtesy <strong>and</strong> respect.<br />

• Council will not tolerate rude or aggressive behaviour towards Council officials. In<br />

such circumstances, Council officials are entitled to terminate phone calls or meetings<br />

as appropriate. Wherever possible, Council officials will provide the person with initial<br />

warning that their conduct is inappropriate <strong>and</strong> that the meeting or conversation will be<br />

terminated.<br />

• Council officials will demonstrate fair <strong>and</strong> consistent decision-making.<br />

<strong>Water</strong> Restrictions Policy Sept 2009 4


Appendix I<br />

Community Engagement Strategy<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 122


Coffs Harbour City Council<br />

Community Engagement Strategy


Introduction<br />

The community of Coffs Harbour has a vital role to play not only in planning <strong>for</strong> the future of the city<br />

but also in partnering with government <strong>and</strong> non-government agencies to identify <strong>and</strong> implement<br />

initiatives that contribute to the sustainability of our economy, lifestyle <strong>and</strong> environment.<br />

Community engagement <strong>and</strong> participation is essential <strong>for</strong> the development <strong>and</strong> implementation of<br />

the Coffs Harbour 2030 Community <strong>Strategic</strong> Plan.<br />

This Draft Community Engagement Strategy <strong>for</strong> the development <strong>and</strong> review of the Coffs Harbour<br />

2030 Community <strong>Strategic</strong> Plan promotes opportunities <strong>for</strong> public participation <strong>for</strong> the ongoing review<br />

<strong>and</strong> implementation of the Coffs Harbour 2030 Community <strong>Strategic</strong> Plan, while documenting the<br />

community engagement activities that have contributed to the identification of the Coffs Harbour<br />

2030 Community Vision <strong>and</strong> the Community <strong>Strategic</strong> Plan.<br />

In summary this Strategy provides:<br />

• Objectives <strong>for</strong> the Community Engagement Strategy<br />

• Reference to International Association <strong>for</strong> Public Participation (IAP2)best practice <strong>and</strong> legislative<br />

requirements;<br />

• NSW Government definition of social justice principles;<br />

• Coffs Harbour City’s Council’s adopted principles <strong>for</strong> the Community <strong>Strategic</strong> Plan;<br />

• Identification of key stakeholders;<br />

• Roles <strong>and</strong> responsibilities in regards to engagement;<br />

• A record of the community engagement techniques employed to develop the Coffs Harbour<br />

2030 Community Vision;<br />

• A record of the community engagement techniques to develop the draft Coffs Harbour 2030<br />

Community <strong>Strategic</strong> Plan <strong>and</strong> to finalise the plan <strong>for</strong> adoption by Council;<br />

• An outline of the activities proposed <strong>for</strong> the implementation of the Community <strong>Strategic</strong> Plan;<br />

• The proposed timeframe <strong>for</strong> the review of the Community Engagement Strategy.<br />

Coffs Harbour City Council has received funding from the NSW Environmental Trust as part of<br />

an alliance of six NSW Councils to look at mechanisms <strong>for</strong> improved integration of community<br />

engagement <strong>and</strong> education within Council.<br />

As part of this wider project Council has received funding to investigate <strong>and</strong> develop mechanisms<br />

<strong>for</strong> ongoing stakeholder engagement in implementation of the 2030 Plan <strong>and</strong> the development of<br />

a monitoring <strong>and</strong> review framework.<br />

This project will develop a model to ensure that all stakeholders are actively involved in the ongoing<br />

implementation <strong>and</strong> review of the 2030 Plan.<br />

Stakeholders will include community groups, government agencies, business <strong>and</strong> industry <strong>and</strong> nongovernment<br />

service providers <strong>and</strong> will specifically seek to include the key target groups identified<br />

in the 2030 project, being youth <strong>and</strong> indigneous people.<br />

Initially a Community Advisory Group will be established to in<strong>for</strong>m the development of the model. An<br />

internal working group will be set up to review existing Council community engagement structures<br />

<strong>and</strong> to work on development of the model.<br />

Community Engagement Strategy <strong>for</strong> the Development & Review of Coffs Harbour Community <strong>Strategic</strong> Plan<br />

5


Appendix J<br />

Health, Safety, Environment <strong>and</strong> Quality Policy<br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 125


Appendix K<br />

TBL Per<strong>for</strong>mance Reports <strong>and</strong> Action <strong>Plans</strong><br />

May 2012<br />

HydroScience Consulting<br />

Coffs Harbour City Council <strong>Strategic</strong> <strong>Business</strong> Plan Page 130


Coffs Harbour City Council TBL <strong>Water</strong> <strong>Supply</strong> Per<strong>for</strong>mance 2009-10<br />

WATER SUPPLY SYSTEM - Coffs Harbour City Council serves a population of 66,000 (24,050 connected properties). <strong>Water</strong> is drawn from Orara River to supply Coffs Harbour, Sawtell <strong>and</strong> Woolgoolga.<br />

Council has 2 dams with a total storage capacity of 5870 ML. Coffs Harbour also receives a bulk supply from Clarence Valley's 30,000ML Shannon Creek Dam. The Coffs Harbour City Council system<br />

comprises 2 lime/CO2 dosing works (43 ML/d), 18 service reservoirs (83 ML) 7 pumping stations, 43.2 ML/d delivery capacity into the distribution system, 168 km of transfer <strong>and</strong> trunk mains <strong>and</strong> 459 km of<br />

reticulation. The water supply is unfiltered (chlorinated).<br />

PERFORMANCE - Coffs Harbour City Council achieved 100% compliance with Best Practice requirements. The typical residential bill was $535 which was above the statewide median of $430 (Indicator<br />

14). The economic real rate of return was 6.3% which was greater than the statewide median (Indicator 43). The operating cost (OMA) per property was $300 which was less than the statewide median of<br />

$350 (Indicator 49). <strong>Water</strong> quality complaints were similar to the statewide median of 4 (Indicator 25). Compliance with microbiological water quality was 100% with 3 of 3 zones compliant (Indicator 20),<br />

physical compliance was 100% (Indicator 19) <strong>and</strong> chemical compliance was 100% with 3 of 3 zones compliant (Indicator 19b). Current replacement cost of system assets was $407M ($15,900 per<br />

assessment), cash <strong>and</strong> investments were $44.6M, debt was $108.7M <strong>and</strong> revenue was $32.3M (excluding capital works grants).<br />

COMPLIANCE WITH BEST- PRACTICE MANAGEMENT GUIDELINES REQUIREMENTS<br />

(1) Complete Current <strong>Strategic</strong> <strong>Business</strong> Plan & Financial Plan YES (3) Sound water conservation implemented<br />

(2) (2a) Pricing - Full Cost Recovery, without significant cross subsidies Yes (4) Sound drought management implemented<br />

(2b) & (2c) Pricing - Complying Residential Charges Yes (5) Complete per<strong>for</strong>mance reporting (by 15 September)<br />

(2c) Pricing - Complying non-Residential Charges Yes (6) Integrated water cycle management strategy<br />

(2d) Pricing - DSP with Commercial Developer Charges Yes COMPLIANCE WITH ALL REQUIREMENTS<br />

YES<br />

YES<br />

YES<br />

YES<br />

100%<br />

TRIPLE BOTTOM LINE (TBL) PERFORMANCE INDICATORS LWU RANKING<br />

STATEWIDE<br />

RESULT >10,000 All LWUs MEDIAN<br />

NWI No.<br />

properties<br />

UTILITY<br />

SOCIAL<br />

ENVIRONMENTAL<br />

ECONOMIC<br />

CHARGES & BILLS -<br />

SERVICE LEVELS HEALTH<br />

2009-10<br />

CHARACTERISTICS<br />

NATURAL RESO URCE<br />

MANAG EMENT<br />

FINANCE<br />

C1 1 Population served: 66000 Note 1 Note 2 Note 3<br />

C4 2 Number of connected properties: 24050 Number of assessments: 25580 Col 1 Col 2 Col 3 Col 4<br />

C2 3 Residential connected properties (% of total) 94 % 91<br />

4 New residences connected to water supply (%) 1.8 % 1 1 1.0<br />

A3 5 Properties served per kilometre of water main Prop/km 39 32<br />

6 Rainfall (% of average annual rainfall) 146 % 1 1 104<br />

W11 7 Total urban water supplied at master meters (ML) 6,620 ML 6,800<br />

8 Peak week to average consumption (%) 121 % 1 1 145<br />

9 Renewals expenditure (% of current replacement cost of system assets) 0.1 % 5 5 0.3<br />

10 Employees per 1000 properties per 1,000 prop 1.5 4 3 1.4<br />

P1 Residential tariff structure: inclining block; independent of l<strong>and</strong> value<br />

12 Residential water usage charge (c/kL) <strong>for</strong> usage 10,000 properties connected properties (Col 2) is on a % of LWUs basis - relevant <strong>for</strong> comparing per<strong>for</strong>mance with similar sized LWUs - see<br />

attachment.<br />

2. The ranking compared with all LWUs (Col 3) is on a % of LWUs basis - relevant <strong>for</strong> comparing per<strong>for</strong>mance with all other LWUs - see attachment.<br />

3. The Statewide Median (Col 4) is on a % of connected properties basis. It best reveals statewide per<strong>for</strong>mance by giving due weight to larger LWUs & reducing the effect of smaller LWUssee<br />

attachment.<br />

4. Annual review of key projections <strong>and</strong> actions in LWU's <strong>Strategic</strong> <strong>Business</strong> Plan (SBP) are required, together with annual updating of LWU's financial plan. The SBP should be updated after<br />

4 years.<br />

5. Non-residential Tariff: Access Charge based on Meter Size: 40mm $508, Two Part Tariff; For all usage = 219c/kL.<br />

<strong>Water</strong> supplied to non-residential customers was 26% of potable water supplied excluding non-revenue water.<br />

Non-residential customers provided 23% of the revenue from annual charges <strong>and</strong> usage charges.<br />

6. The operating cost (OMA)/property was $300. Components were: management ($134), operation ($71), maintenance ($72), energy ($7) & chemical ($18).<br />

EFFICIENCY


Coffs Harbour City Council TBL <strong>Water</strong> <strong>Supply</strong> Per<strong>for</strong>mance (page 2) 2009-10<br />

(Results shown <strong>for</strong> 10 years together with 2009-10 Statewide Median <strong>and</strong> Top 20%)<br />

RESIDENTIAL USE/REVENUE FROM USAGE<br />

200<br />

33. Average annual residential water supplied (W12)<br />

250<br />

12. <strong>Water</strong> usage charge (P1.3)<br />

90<br />

41. Residential Revenue from Usage (F4)<br />

(kL/Property)<br />

180<br />

160<br />

140<br />

120<br />

100<br />

80<br />

60<br />

40<br />

20<br />

(Residential <strong>Water</strong> Usage Charge c/kL)<br />

200<br />

150<br />

100<br />

50<br />

(%)<br />

80<br />

70<br />

60<br />

50<br />

40<br />

30<br />

20<br />

10<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

01/02 03/04 05/06 07/08 09/10<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

COST RECOVERY<br />

1600<br />

40. Revenue per property (F5)<br />

7.0<br />

43. Economic real rate of return (F17)<br />

600<br />

14. Typical residential bill (P3)<br />

1400<br />

6.0<br />

500<br />

($/property)<br />

1200<br />

1000<br />

800<br />

600<br />

400<br />

200<br />

(%)<br />

5.0<br />

4.0<br />

3.0<br />

2.0<br />

1.0<br />

($/Assessment)<br />

400<br />

300<br />

200<br />

100<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

0.0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

01/02 03/04 05/06 07/08 09/10<br />

WATER QUALITY/CUSTOMER SERVICE<br />

100<br />

20. Microbiological water quality compliance<br />

12<br />

25. <strong>Water</strong> quality complaints (C9)<br />

45<br />

26. <strong>Water</strong> service complaints (C10)<br />

(%)<br />

80<br />

60<br />

40<br />

20<br />

(Number per 1,000 properties)<br />

10<br />

8<br />

6<br />

4<br />

2<br />

(Number per 1,000 properties)<br />

40<br />

35<br />

30<br />

25<br />

20<br />

15<br />

10<br />

5<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

RELIABILITY<br />

14<br />

30. Main breaks (A8)<br />

45<br />

27. Average frequency of unplanned interruption (C17)<br />

600<br />

28. Average duration of interruptions (C15)<br />

(Number per 100km of Main)<br />

12<br />

10<br />

8<br />

6<br />

4<br />

2<br />

(Number per 1000 properties)<br />

40<br />

35<br />

30<br />

25<br />

20<br />

15<br />

10<br />

5<br />

(min)<br />

500<br />

400<br />

300<br />

200<br />

100<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

EFFICIENCY<br />

2.5<br />

10. Employees<br />

400<br />

49. Operating cost OMA (F11)<br />

160<br />

51. Management cost<br />

(Number per 1000 properties)<br />

2.0<br />

1.5<br />

1.0<br />

0.5<br />

($/property)<br />

350<br />

300<br />

250<br />

200<br />

150<br />

100<br />

50<br />

($/property)<br />

140<br />

120<br />

100<br />

80<br />

60<br />

40<br />

20<br />

0.0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

NOTES:<br />

LEGEND<br />

1. Costs are in Jan 2010$. 2009-10 State Median<br />

2. Microbiological water quality compliance 1999-00 to 2003-04 was on the basis of 1996 NHMRC/ARMCANZ 2009-10 Top 20%<br />

Australian Drinking <strong>Water</strong> Guidelines <strong>for</strong> E. coli; from 2004-05 compliance was on the basis of the<br />

2004 NHMRC/NRMMC Australian Drinking <strong>Water</strong> Guidelines.


WS Ac tion Plan 0910 - C offs H arbour Ci ty C ouncil<br />

Coffs Harbour City Council <strong>Water</strong> <strong>Supply</strong> – Action Plan Page 1<br />

Summary<br />

In 2009-10, Coffs Harbour City Council complied with all the water supply requirements of the NSW Best-Practice Management<br />

Guidelines <strong>and</strong> its per<strong>for</strong>mance has been [to be completed by Council].<br />

Key actions from Council's <strong>Strategic</strong> <strong>Business</strong> Plan:<br />

- Insert achievements <strong>for</strong> Key Action 1 here <strong>for</strong> Coffs Harbour City Council<br />

- Insert achievements <strong>for</strong> Key Action 2 here <strong>for</strong> Coffs Harbour City Council<br />

5<br />

9<br />

INDICATOR RESULT 2 COMMENT/DRIVERS ACTION<br />

Best-Practice<br />

Management<br />

Guidelines<br />

CHARACTERISTICS<br />

Connected<br />

property density<br />

Renewals<br />

expenditure<br />

10 Employees<br />

12<br />

13<br />

14<br />

15<br />

19<br />

19<br />

a<br />

20<br />

25<br />

SOCIAL - CHARGES<br />

Residential water<br />

usage charge<br />

Residential access<br />

charges<br />

Typical residential<br />

bill 3 (TRB)<br />

Typical developer<br />

charges<br />

SOCIAL - HEALTH<br />

Physical quality<br />

compliance<br />

Chemical quality<br />

compliance<br />

Complied with all the<br />

Best Practice<br />

Requirements 1<br />

Very good<br />

Compliance demonstrates<br />

effectiveness <strong>and</strong> sustainability of<br />

water supply business. 100%<br />

compliance is required <strong>for</strong> eligibility to<br />

pay an ‘efficiency dividend’.<br />

39 per km of main A connected property density below<br />

30 can significantly increase the cost<br />

per property of providing services, as<br />

Median ranking (3, 1)<br />

will also a high number of small<br />

discrete water supply schemes.<br />

0.1%<br />

Lowest ranking (5, 5)<br />

May require<br />

review<br />

1.5 per 1,000 props May require<br />

Low ranking (4, 3) review<br />

219 c/kL<br />

Highest ranking (1, 1)<br />

$127 per assessment<br />

Median ranking (3, 1)<br />

$535 per assessment<br />

Lowest ranking (5, 3)<br />

$8760 per ET<br />

Highest ranking (1, 1)<br />

100%<br />

Highest ranking (1, 1)<br />

100%<br />

Highest ranking (1, 1)<br />

Microbiological 100%<br />

compliance 4 Highest ranking (1, 1)<br />

SOCIAL – LEVELS OF SERVICE<br />

<strong>Water</strong> quality<br />

complaints<br />

26 Service complaints<br />

27<br />

30<br />

Average frequency<br />

of unplanned<br />

interruptions<br />

Number of main<br />

breaks<br />

32 Total Days Lost<br />

Very good<br />

Satisfactory<br />

May require<br />

review<br />

Very good<br />

Very good<br />

Very good<br />

Very good<br />

4 per 1,000 props May require<br />

Low ranking (4, 4) review<br />

10 per 1,000 props<br />

Median ranking (3, 3)<br />

20 per 1,000 props<br />

Median ranking (3, 3)<br />

11 per 100km of main<br />

Median ranking (3, 3)<br />

Satisfactory<br />

Satisfactory<br />

Satisfactory<br />

6.1% May require<br />

Lowest ranking (5, 5) review<br />

Adequate funds must be<br />

programmed <strong>for</strong> works outlined in the<br />

Asset Management Plan – page 2 of<br />

Per<strong>for</strong>mance Monitoring Report.<br />

The number of employees per 1,000<br />

properties is a good indicator of<br />

operating <strong>and</strong> management costs.<br />

Benefits of strong pricing signals are<br />

shown on page 5 of the Per<strong>for</strong>mance<br />

Monitoring Report.<br />

≥ 75% of residential revenue should<br />

be generated through usage charges<br />

(≥ 50% <strong>for</strong> LWUs with < 4,000<br />

properties).<br />

TRB should be consistent with<br />

projection in the financial plan.<br />

Drivers – OMA Management Cost<br />

<strong>and</strong> Capital Expenditure.<br />

Disclose any cross subsidy in<br />

Development Servicing Plan (DSP).<br />

Critical indicator. LWUs should<br />

develop a risk based water quality<br />

management plan.<br />

Critical indicator of customer service.<br />

Can be influenced by the type of<br />

business – e.g. unfiltered supply.<br />

Key indicator of customer service.<br />

Key indicator of customer service,<br />

condition of network <strong>and</strong><br />

effectiveness of operation.<br />

Drivers – condition <strong>and</strong> age of water<br />

mains, ground conditions.<br />

FOR INDICATORS 9 to 56<br />

Where ranking is low, investigate<br />

reasons including past per<strong>for</strong>mance<br />

<strong>and</strong> trends, develop remedial action<br />

plan <strong>and</strong> summarise in this column.<br />

Monitor breaks, including past<br />

per<strong>for</strong>mance <strong>and</strong> trends.<br />

1. Review of Council's TBL Per<strong>for</strong>mance Report <strong>and</strong> Preparation of an Action Plan to Council required annually.<br />

<strong>Strategic</strong> <strong>Business</strong> Plan review <strong>and</strong> update required after 4 years. Financial Plan update <strong>and</strong> report to Council required annually.<br />

New IWCM Strategy required after 8 years. Liquid Trade Waste Regulation Policy in accordance with the 'NSW Liquid Trade Waste<br />

Regulation Guidelines, 2009' required by June 2011. Development Servicing Plan review <strong>and</strong> updating is required after 5 years.<br />

2. The ranking relative to similar size LWUs is shown first (Col. 2 of TBL Report) followed by the ranking relative to all LWUs (Col. 3 of TBL Report).<br />

3. Review <strong>and</strong> comparison of the 2010-11 Typical Residential Bill (Indicator 14) with the projection in your <strong>Strategic</strong> <strong>Business</strong> Plan is m<strong>and</strong>atory.<br />

In addition, if both indicators 43 <strong>and</strong> 44 are negative, you must report your proposed 2011-12 typical residential bill to achieve full cost recovery.<br />

4. Microbiological compliance (Indicator 20) is a high priority <strong>for</strong> each NSW LWU. Corrective action <strong>for</strong> non-compliance (≤97%), or any ‘boil water<br />

alerts’ must be reported in your Action Plan.


Coffs Harbour City Council <strong>Water</strong> <strong>Supply</strong> – Action Plan Page 2<br />

33<br />

34<br />

41<br />

43<br />

INDICATOR RESULT COMMENT/DRIVERS ACTION<br />

ENVIRONMENTAL<br />

Average annual<br />

residential water<br />

supplied<br />

Real losses<br />

(leakage)<br />

ECONOMIC<br />

Residential<br />

revenue from<br />

usage charges<br />

Economic Real<br />

Rate of Return<br />

(ERRR)<br />

44 Return on assets<br />

45 Net debt to equity<br />

46 Interest cover<br />

47 Loan payment<br />

49<br />

Operating cost<br />

(OMA)<br />

51 Management cost<br />

186 kL per prop<br />

Low ranking (4, 2)<br />

50 L/c/d<br />

High ranking (2, 1)<br />

76% of residential<br />

bills<br />

Highest ranking (1, 1)<br />

6.3%<br />

Highest ranking (1, 1)<br />

4.9%<br />

Highest ranking (1, 1)<br />

25%<br />

Highest ranking (1, 1)<br />

4.45<br />

Median ranking (3, 3)<br />

$585 per prop<br />

Highest ranking (1, 1)<br />

$300 per prop<br />

High ranking (2, 1)<br />

$134 per prop<br />

Low ranking (4, 3)<br />

May require<br />

review<br />

Good<br />

Very good See 13.<br />

Very good<br />

Very good<br />

Very good<br />

Satisfactory<br />

Very good<br />

Good<br />

May require<br />

review<br />

Drivers – available water supply,<br />

climate, location (Inl<strong>and</strong> or coastal),<br />

pricing signals (Indicator 3),<br />

restrictions.<br />

Loss reduction is important where an<br />

LWU is facing drought water<br />

restrictions or the need to augment<br />

its water supply system.<br />

Reflects the rate of return generated<br />

from operating activities (excluding<br />

interest income <strong>and</strong> grants) An<br />

ERRR or ROA of > 0% is required <strong>for</strong><br />

full cost recovery.<br />

Reflects the rate of return generated<br />

from operating activities (including<br />

interest income) An ERRR or ROA of<br />

>0% is required <strong>for</strong> full cost recovery.<br />

LWUs facing significant capital<br />

investment are encouraged to make<br />

greater use of borrowings – page 12<br />

of Per<strong>for</strong>mance Monitoring Report.<br />

Drivers – in general, an interest cover<br />

> 2 is satisfactory.<br />

The component of TRB required to<br />

meet debt payments.<br />

Drivers – expenditure on capital<br />

works, short term loans.<br />

Prime indicator of the financial<br />

per<strong>for</strong>mance of an LWU.<br />

Drivers – development density, level<br />

of treatment, management cost,<br />

topography, number of discrete<br />

schemes <strong>and</strong> economies of scale.<br />

Typically about 40% of the OMA.<br />

Drivers – No. of employees. No. of<br />

small discrete water schemes.<br />

Where ERRR is negative, investigate<br />

reasons <strong>and</strong> ensure the 2011/12<br />

charges are sufficient to achieve full<br />

cost recovery – page 11 of<br />

Per<strong>for</strong>mance Monitoring Report.<br />

Review components carefully to<br />

ensure efficient operating cost.<br />

52 Treatment cost<br />

$55 per prop<br />

Low ranking (4, 2)<br />

May require<br />

review<br />

Drivers – type <strong>and</strong> quality of water<br />

source. Size of treatment works<br />

53 Pumping cost<br />

$14 per prop<br />

High ranking (2, 1)<br />

Good<br />

Drivers – topography, development<br />

density <strong>and</strong> location of water source.<br />

55 <strong>Water</strong> main cost<br />

56<br />

Capital<br />

expenditure<br />

$54 per prop<br />

Median ranking (3, 2)<br />

$261 per prop<br />

Median ranking (3, 2)<br />

Satisfactory<br />

Satisfactory<br />

Drivers – age <strong>and</strong> condition of mains.<br />

Ground conditions. Development<br />

density.<br />

An indicator of the level of investment<br />

in the business.<br />

Drivers – age <strong>and</strong> condition of<br />

assets, asset life cycle <strong>and</strong> water<br />

source.


Coffs Harbour City Council TBL <strong>Sewerage</strong> Per<strong>for</strong>mance 2009-10<br />

SEWERAGE SYSTEM - Coffs Harbour Council has 5 sewage treatment works providing secondary, advanced secondary <strong>and</strong> tertiary treatment. The system comprises 114,500 EP treatment<br />

capacity (Intermittent Extended Aeration (Activated Sludge), Trickling Filter <strong>and</strong> Biological Nutrient Removal), 116 pumping stations , 164 km of rising mains <strong>and</strong> 489 km of gravity trunk mains <strong>and</strong><br />

reticulation. Treated effluent is discharged to l<strong>and</strong> <strong>and</strong> ocean.<br />

PERFORMANCE - Residential growth <strong>for</strong> 2009-10 was 1.5% which is higher than the statewide median. Coffs Harbour City Council achieved 100% compliance with Best Practice requirements.<br />

The typical residential bill was $698 which was above the statewide median of $530 (Indicator 12). The economic real rate of return was 2.6% which was greater than the statewide median<br />

(Indicator 46). The operating cost per property (OMA) was $485 which was well above the statewide median of $360 (Indicator 50). Sewage odour complaints were above the statewide median of<br />

0.6 (Indicator 21). Council complied with the requirements of the environmental regulator <strong>for</strong> effluent discharge. The current replacement cost of system assets was $391M ($16,000 per<br />

assessment), cash <strong>and</strong> investments were $73M, debt was $131M <strong>and</strong> revenue was $24.6M (excluding capital works grants).<br />

COMPLIANCE WITH BEST-PRACTICE MANAGEMENT GUIDELINES REQUIREMENTS<br />

(1) Complete current strategic business plan & financial plan YES (2e) Pricing - DSP with commercial developer charges<br />

(2) (2a) Pricing - Full Cost Recovery without significant cross subsidies Yes (2f) Pricing - Liquid trade waste approvals & policy<br />

(2b) Pricing - Complying Residential Charges Yes (3) Complete per<strong>for</strong>mance reporting (by 15 September)<br />

(2c) Pricing - Complying Non-Residential Charges Yes (4) Integrated water cycle management strategy<br />

(2d) Pricing - Complying Trade Waste Fees <strong>and</strong> Charges Yes COMPLIANCE WITH ALL REQUIREMENTS<br />

Yes<br />

Yes<br />

YES<br />

YES<br />

100%<br />

TRIPLE BOTTOM LINE (TBL) PERFORMANCE INDICATORS<br />

NWI No. LWU RANKING STATEWIDE<br />

C5 1 Population served: 64,800 Number of assessments: 24,400<br />

RESULT >10,000 All<br />

properties LWUs<br />

MEDIAN<br />

C8 2 Number of connected properties: 22,690 Note 1 Note 2 Note 3<br />

C6 3 Number of residential connected properties: 21,290 Col 1 Col 2 Col 3 Col 4<br />

4 New residences connected to sewerage (%) 1.5 % 1 1 0.9<br />

A6 5 Properties served per kilometre of main Prop/km 35 40<br />

W18 6 Volume of sewage collected (ML) 6,440 ML 4,900<br />

7 Renewals expenditure (% of current replacement cost of system assets) 0.7 % 1 1 0.3<br />

8 Employees per 1000 properties per 1,000 prop 1.8 3 3 1.6<br />

UTILITY<br />

SOCIAL<br />

ENVIRONMENTAL<br />

ECONOMIC<br />

CHARACTERISTICS<br />

CHARGES &<br />

BILLS - 2010-11<br />

HEALTH<br />

SERVICE<br />

LEVELS<br />

NATURAL RESOURCE<br />

MANAGEMENT<br />

ENVIRONMENTAL<br />

PERFORMANCE<br />

FINANCE<br />

P4 Description of residential tariff structure: access charge/prop; independent of l<strong>and</strong> value (Note 5)<br />

P4.1 11 Residential access charge / assessment ($) $ 698 5 5 525<br />

P6 12 Typical residential bill / assessment ($) $ 698 4 5 530<br />

13 Typical developer charge / equivalent tenement ($) $ 8,380 1 1 4,200<br />

14 Non-residential sewer usage charge (c/kL) c/kL 178 2 1 105<br />

16 Urban properties without reticulated sewerage service (%) 16.1 % 5 5 3.9<br />

E3 17 Percent of sewage treated to a tertiary level (%) 100 % 1 1 93<br />

E4 18 Percent of sewage volume treated that complied (%) 100 % 1 1 99<br />

E5 19 Sewage treatment works compliant at all times 5 of 5<br />

21 Odour complaints per 1000 properties per 1,000 prop 1.8 5 5 0.6<br />

C11 22 Service complaints per 1000 properties per 1,000 prop 4 2 2 10<br />

C16 23a Average sewerage interruption (minutes) 120 min 3 3 118<br />

25 Total days lost (%) 6.9 % 5 5 2.5<br />

W19 26 Volume of sewage collected per property (kL) 284 kL 1 2 220<br />

W26 26a Total recycled water supplied (ML) 1,030 ML 2 1 620<br />

W27 27 Recycled water (% of effluent recycled) 16 % 2 3 11<br />

E8 28 Biosolids reuse (%) 100 % 1 1 100<br />

30 Energy consumption per Megalitre (kiloWatt hours) 1,156 kwh 5 5 910<br />

31 Renewable energy consumption (% of total energy consumption) 100 % 1 1 0<br />

E12 32 Net greenhouse gas emissions - WS & Sge (net tonnes CO2 equivalents per 1000 properties) 450 4 5 350<br />

33 90 Percentile licence limits <strong>for</strong> effluent discharge:<br />

BOD 50 mg/L; SS 50 mg/L<br />

34 Compliance with BOD in licence (%) 100 % 1 1 100<br />

35 Compliance with SS in licence (%) 100 % 1 1 100<br />

A12 36 Sewer main breaks <strong>and</strong> chokes per 100 km of main per 100km main 37 3 3 39<br />

E13 37 Sewer overflows per 100 km of main per 100km main 4 2 3 15<br />

39 Non res & trade waste % of total sge volume % 18<br />

F6 42 Revenue per property - Sge ($) $ 1080 680<br />

43 Revenue from non-residential plus trade waste charges (% of total revenue) 21 % 2 3 18<br />

44 Revenue from trade waste charges (% of total revenue) 1.6 % 4 2 2.3<br />

F18 46 Economic real rate of return - Sge (%) 2.6 % 1 1 1.3<br />

46a Return on assets - Sge (%) 1.6 % 2 3 1.6<br />

F22 47 Net Debt to equity - Sge (%) 23 % 1 1 -2<br />

F23 48 Interest cover - Sge 3 4 4 3<br />

48a Loan payment per property - Sge ($) $ 690 1 1 38<br />

F24 47b Net profit after tax - WS & Sge ($'000) $'000 19,860 303<br />

49 Operating cost (OMA) per 100 km of main ($'000) $'000 1,690 4 5 1,490<br />

F12 50 Operating cost (OMA) per property ($) Note 8 $ 485 5 5 360<br />

51 Operating cost (OMA) per kilolitre (cents) c/kL 171 3 4 164<br />

52 Management cost per property ($) $ 164 5 5 128<br />

53 Treatment cost per property ($) $ 175 5 5 115<br />

54 Pumping cost per property ($) $ 99 5 5 55<br />

55 Energy cost per property ($) $ 52 5 5 26<br />

56 Sewer main cost per property ($) $ 35 2 2 40<br />

F15 57 Capital Expenditure per property ($) $ 580 2 2 252<br />

NOTES :<br />

1. Council's ranking in Col 2 is based on a comparison of its result in Col 1 with the percentiles <strong>for</strong> LWUs with >10,000 properties. This is on a % of LWUs basis - see also Note 2.<br />

2. Council's ranking in Col 3 is based on a comparison of its result in Col 1 with the percentiles <strong>for</strong> all LWUs. This is also on a % of LWUs basis as this is relevant <strong>for</strong><br />

comparing the per<strong>for</strong>mance of an LWU with all other LWUs - see attachment.<br />

3. The Statewide Median (Col 4) is on a % of connected properties basis. It best reveals statewide per<strong>for</strong>mance giving due weight to larger LWUs & reducing the effect of smaller LWUs.<br />

4. Annual review of the key projections & actions in your LWU's <strong>Strategic</strong> <strong>Business</strong> Plan (SBP) are required, together with annual updating of your LWU's Financial Plan. The SBP should be<br />

updated after 4 years.<br />

5. Non-residential: Access Charge $682*water meter factor*discharge factor, sewer usage charge - 178c/kL.<br />

6 Non-residential customers provided 21% of the revenue from annual charges, usage <strong>and</strong> trade waste charges.<br />

7 Compliance with Total N in Licence was 100%. Compliance with Total P in Licence was 100%.<br />

8 The operating cost (OMA)/property was $485. Components were: management ($164), operation ($118), maintenance ($87), energy ($52), chemical ($13) <strong>and</strong> effluent/biosolids ($50).<br />

EFFICIENCY


Coffs Harbour City Council TBL <strong>Sewerage</strong> Per<strong>for</strong>mance (page 2) 2009-10<br />

(Results shown <strong>for</strong> 10 years together with 2009/10 Statewide Median <strong>and</strong> Top 20%)<br />

COST RECOVERY<br />

($ / prop)<br />

42. Revenue per property<br />

1,400<br />

1,200<br />

1,000<br />

800<br />

600<br />

400<br />

8<br />

7<br />

6<br />

5<br />

(%)<br />

4<br />

3<br />

46. Economic real rate of return<br />

12. Typical residential bill<br />

800<br />

700<br />

600<br />

2<br />

200<br />

($/assessment)<br />

500<br />

400<br />

300<br />

200<br />

1<br />

100<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

01/02 03/04 05/06 07/08 09/10<br />

COMPLIANCE<br />

100<br />

34. Compliance with BOD in licence<br />

100<br />

35. Compliance with SS in licence<br />

100<br />

90<br />

18. % Sewage volume that complied<br />

80<br />

80<br />

80<br />

70<br />

(%)<br />

60<br />

(%)<br />

60<br />

(%)<br />

60<br />

50<br />

40<br />

40<br />

40<br />

30<br />

20<br />

20<br />

20<br />

10<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

CUSTOMER SERVICE/RELIABILITY<br />

120<br />

36. Sewer main breaks <strong>and</strong> chokes<br />

140<br />

37. Sewer overflows to environment<br />

3.5<br />

21. Odour complaints<br />

100<br />

120<br />

3.0<br />

(per 100km of main)<br />

80<br />

60<br />

40<br />

(per 100km of main)<br />

100<br />

80<br />

60<br />

40<br />

(per 1000 properties)<br />

2.5<br />

2.0<br />

1.5<br />

1.0<br />

20<br />

20<br />

0.5<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

0.0<br />

00/01 02/03 04/05 06/07 08/09<br />

ENVIRONMENT<br />

100<br />

27. Effluent recycled<br />

32. Net Greenhouse gas emissions WS & SGE<br />

100<br />

28. Biosolids reuse<br />

80<br />

489<br />

427<br />

80<br />

(%)<br />

60<br />

40<br />

(tonnes)<br />

366<br />

305<br />

244<br />

183<br />

60<br />

(%)<br />

40<br />

20<br />

122<br />

61<br />

20<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

EFFICIENCY<br />

2.5<br />

2.0<br />

8. Employees<br />

600<br />

500<br />

50. Operating cost (OMA) per property<br />

180<br />

160<br />

140<br />

52. Management cost per property<br />

(per 1000 properties)<br />

1.5<br />

1.0<br />

0.5<br />

($)<br />

400<br />

300<br />

200<br />

100<br />

($)<br />

120<br />

100<br />

80<br />

60<br />

40<br />

20<br />

0.0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

0<br />

00/01 02/03 04/05 06/07 08/09<br />

NOTES:<br />

1. Costs are in Jan 2010$. LEGEND<br />

2009-10 State Median<br />

2009-10 Top 20%


SGE Action Plan 0910 - C offs H arbour City C ouncil<br />

Coffs Harbour City Council <strong>Sewerage</strong> – Action Plan Page 1<br />

Summary<br />

In 2009-10, Coffs Harbour City Council complied with all the sewerage requirements of the NSW Best-Practice Management<br />

Guidelines <strong>and</strong> its per<strong>for</strong>mance has been [to be completed by Council].<br />

Key actions from Council's <strong>Strategic</strong> <strong>Business</strong> Plan:<br />

- Insert achievements <strong>for</strong> Key Action 1 here <strong>for</strong> Coffs Harbour City Council<br />

- Insert achievements <strong>for</strong> Key Action 2 here <strong>for</strong> Coffs Harbour City Council<br />

5<br />

7<br />

INDICATOR RESULT 2 COMMENT/DRIVERS ACTION<br />

Best-Practice<br />

Management<br />

Guidelines<br />

CHARACTERISTICS<br />

Connected<br />

property density<br />

Renewals<br />

expenditure<br />

8 Employees<br />

12<br />

13<br />

14<br />

16<br />

17<br />

18<br />

19<br />

SOCIAL – CHARGES<br />

Typical residential<br />

bill 3 (TRB)<br />

Typical Developer<br />

Charges<br />

Non-residential<br />

sewer usage<br />

charge<br />

SOCIAL - HEALTH<br />

Urban Properties<br />

without reticulated<br />

sewerage service<br />

Percent sewage<br />

treated to tertiary<br />

level<br />

Percent of sewage<br />

volume that<br />

complied<br />

Sewage treatment<br />

works compliant at<br />

all times<br />

Complied with all the<br />

Best Practice<br />

Requirements 1<br />

35 per km of main<br />

0.7%<br />

Highest ranking (1, 1)<br />

1.8 per 1,000 props<br />

Median ranking (3, 3)<br />

$698 per assessment<br />

Low ranking (4, 5)<br />

$8380 per<br />

assessment<br />

Highest ranking (1, 1)<br />

178c/kL<br />

High ranking (2, 1)<br />

16.1%<br />

Lowest ranking (5, 5)<br />

100%<br />

Highest ranking (1, 1)<br />

100%<br />

Highest ranking (1, 1)<br />

5 of 5<br />

SOCIAL – LEVELS OF SERVICE<br />

Very good<br />

Lower than<br />

the statewide<br />

median of 40<br />

Very good<br />

Satisfactory<br />

May require<br />

review<br />

Very good<br />

Good<br />

May require<br />

review<br />

Very good<br />

Very good<br />

Compliance demonstrates<br />

effectiveness <strong>and</strong> sustainability of<br />

water supply <strong>and</strong> sewerage<br />

business. 100% compliance is<br />

required <strong>for</strong> eligibility to pay an<br />

‘efficiency dividend’.<br />

A connected property density below<br />

about 30 can significantly increase<br />

the cost per property of providing<br />

services.<br />

Adequate funds must be<br />

programmed <strong>for</strong> works outlined in the<br />

Asset Management Plan – page 2 of<br />

Per<strong>for</strong>mance Monitoring Report.<br />

The number of employees per 1,000<br />

properties is a good indicator of<br />

operating <strong>and</strong> management costs.<br />

TRB should be consistent with<br />

projection in the financial plan.<br />

Drivers – OMA Management Cost<br />

<strong>and</strong> Capital Expenditure.<br />

Compare with Current Replacement<br />

Cost.<br />

Compare with operating cost per kL.<br />

Key indicator of compliance with<br />

regulator.<br />

Key indicator of compliance with<br />

regulator.<br />

FOR INDICATORS 7 to 57<br />

Where ranking is low, investigate<br />

reasons including past per<strong>for</strong>mance<br />

<strong>and</strong> trends, develop remedial action<br />

plan <strong>and</strong> summarise in this column.<br />

21 Odour Complaints<br />

22 Service complaints<br />

23<br />

a<br />

Average Duration<br />

of Interruption<br />

25 Total Days Lost<br />

1.8 per 1,000 props May require<br />

Lowest ranking (5, 5) review<br />

4 per 1,000 props<br />

High ranking (2, 2)<br />

120 minutes<br />

Median ranking (3, 3)<br />

Good<br />

Satisfactory<br />

6.9% May require<br />

Lowest ranking (5, 5) review<br />

Critical indicator of customer service<br />

<strong>and</strong> operation of treatment works.<br />

Key indicator of customer service.<br />

Key indicator of customer service,<br />

condition of network <strong>and</strong><br />

effectiveness of operation.<br />

1. Review of Council's TBL Per<strong>for</strong>mance Report <strong>and</strong> Preparation of an Action Plan to Council required annually.<br />

<strong>Strategic</strong> <strong>Business</strong> Plan review <strong>and</strong> update required after 3 years. Financial Plan update required annually.<br />

IWCM Strategy review <strong>and</strong> update required after 6 years. Liquid Trade Waste Regulation Policy in accordance with the 'NSW Liquid Trade Waste<br />

Regulation Guidelines, 2009' required by June 2011. Development Servicing Plan review <strong>and</strong> updating is required after 5 years.<br />

2. The ranking relative to similar size LWUs is shown first (Col. 2 of TBL Report) followed by the ranking relative to all LWUs (Col. 3 of TBL Report).<br />

3. Review <strong>and</strong> comparison of the 2010-11 Typical Residential Bill (Indicator 12) with the projection in your <strong>Strategic</strong> <strong>Business</strong> Plan is m<strong>and</strong>atory.<br />

In addition, if both indicators 46 <strong>and</strong> 46a are negative, you must report your proposed 2011-12 typical residential bill to achieve full cost recovery.


Coffs Harbour City Council <strong>Sewerage</strong> – Action Plan Page 2<br />

INDICATOR RESULT COMMENT/DRIVERS ACTION<br />

ENVIRONMENTAL<br />

Volume of sewage<br />

26 collected per<br />

property<br />

27<br />

Percentage<br />

effluent recycled<br />

28 Biosolids reuse<br />

32<br />

34<br />

35<br />

36<br />

37<br />

Net Greenhouse<br />

gas emissions<br />

(WS & Sge)<br />

Compliance with<br />

BOD in licence<br />

Compliance with<br />

SS in licence<br />

Sewer main<br />

breaks <strong>and</strong> chokes<br />

Sewer overflows to<br />

the environment<br />

ECONOMIC<br />

Non-residential<br />

39 percentage of<br />

sewage collected<br />

43<br />

46<br />

46<br />

a<br />

Non-residential<br />

revenue<br />

Economic Real<br />

Rate of Return<br />

(ERRR)<br />

Return on assets<br />

47 Net debt to equity<br />

48 Interest cover<br />

48<br />

a<br />

50<br />

Loan payment<br />

Operating cost<br />

(OMA)<br />

52 Management cost<br />

53 Treatment cost<br />

54 Pumping cost<br />

56 Sewer main cost<br />

57<br />

Capital<br />

expenditure<br />

284 kL<br />

Highest ranking (1, 2)<br />

16%<br />

High ranking (2, 3)<br />

100%<br />

Highest ranking (1, 1)<br />

450 t CO2/1000 props<br />

Low ranking (4, 5)<br />

100%<br />

Highest ranking (1, 1)<br />

100%<br />

Highest ranking (1, 1)<br />

37 per 100km of main<br />

Median ranking (3, 3)<br />

4 per 100km of main<br />

High ranking (2, 3)<br />

21%<br />

High ranking (2, 3)<br />

2.6%<br />

Highest ranking (1, 1)<br />

1.6%<br />

High ranking (2, 3)<br />

23%<br />

Highest ranking (1, 1)<br />

2.7<br />

Median ranking (3, 3)<br />

$690 per prop<br />

Highest ranking (1, 1)<br />

$485 per prop<br />

Lowest ranking (5, 5)<br />

$164 per prop<br />

Lowest ranking (5, 5)<br />

Good<br />

Very good<br />

May require<br />

review<br />

Very good<br />

Very good<br />

Satisfactory<br />

Good<br />

Good<br />

Very good<br />

Good<br />

Very good<br />

Satisfactory<br />

Very good<br />

May require<br />

review<br />

May require<br />

review<br />

$175 per prop May require<br />

Lowest ranking (5, 5) review<br />

$99 per prop May require<br />

Lowest ranking (5, 5) review<br />

$35 per prop<br />

High ranking (2, 2)<br />

$580 per prop<br />

High ranking (2, 2)<br />

Good<br />

Good<br />

Compare sewage collected to water<br />

supplied.<br />

Key environmental indicator.<br />

Drivers – availability of potable water,<br />

dem<strong>and</strong>, proximity to customers,<br />

environment.<br />

Key environmental indicator.<br />

Drivers – gravity vs pumped<br />

networks, topography, extent of<br />

treatment.<br />

Key indicator of compliance with<br />

regulator requirements.<br />

Drivers – algae in maturation ponds,<br />

impact of drought.<br />

Drivers – condition <strong>and</strong> age of<br />

assets, ground conditions.<br />

Drivers – condition of assets, wet<br />

weather <strong>and</strong> flooding.<br />

For non-residential, compare % of<br />

sewage collected to indicator 43<br />

(% of revenue).<br />

See 39 above.<br />

Reflects the rate of return generated<br />

from operating activities (excluding<br />

interest income <strong>and</strong> grants) An<br />

ERRR or ROA of > 0% is required <strong>for</strong><br />

full cost recovery.<br />

Reflects the rate of return generated<br />

from operating activities (including<br />

interest income) An ERRR or ROA of<br />

>0% is required <strong>for</strong> full cost recovery.<br />

LWUs facing significant capital<br />

investment are encouraged to make<br />

greater use of borrowings.<br />

Drivers – in general, an interest cover<br />

of > 2 is satisfactory.<br />

The component of TRB required to<br />

meet debt payments.<br />

Drivers – expenditure on capital<br />

works, short term loans.<br />

Prime indicator of the financial<br />

per<strong>for</strong>mance of an LWU.<br />

Drivers – development density, level<br />

of treatment, management cost,<br />

topography, number of discrete<br />

schemes <strong>and</strong> economies of scale.<br />

Drivers –number of discrete<br />

schemes, number of employees.<br />

Typically about 40% of OMA.<br />

Drivers – type <strong>and</strong> level of treatment,<br />

economies of scale.<br />

Drivers – topography, development<br />

density, effluent recycling.<br />

Drivers – topography, development<br />

density, effluent recycling.<br />

An indicator of the level of investment<br />

in the business.<br />

Drivers – age <strong>and</strong> condition of<br />

assets, asset life cycle.<br />

Where ERRR is negative, investigate<br />

reasons <strong>and</strong> ensure charges are<br />

sufficient to ensure financial viability..<br />

Review carefully to ensure efficient<br />

operating cost.


Based in Sydney <strong>and</strong> Byron Bay, HydroScience Consulting (HSc) is an Australian consultancy<br />

dedicated to serving the water industry in Australia.<br />

HSc provides planning <strong>and</strong> design services to public <strong>and</strong> private sector clients throughout<br />

Australia. We are committed to developing strong client relationships that become the<br />

foundation <strong>for</strong> underst<strong>and</strong>ing our clients’ needs <strong>and</strong> exceeding their expectations.<br />

Sydney<br />

Level 1<br />

189 Kent Street<br />

Sydney, NSW 2000<br />

Byron Bay<br />

Unit 6<br />

64 Centennial Circuit<br />

Byron Bay NSW 2481<br />

Tel: 02 9249 5100<br />

Fax: 02 9279 2700<br />

Tel: 02 6639 5600<br />

Fax: 02 6680 9319<br />

Email: hsc@hydroscience.net.au

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!