19.01.2015 Views

eu-com-schengen-coop

eu-com-schengen-coop

eu-com-schengen-coop

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. Challenges<br />

1. Response to challenges listed in previous report:<br />

Some work has been done on the facilitation of issuing more multiple-entry, long-term visa, and on<br />

the use of flexibility of the VC regarding visa fee waiver and visa fee reduction, with a<br />

<strong>com</strong>prehensive tables that includes all the practices by the LSC members, but it has not been<br />

possible to harmonise the practices yet. The same applies to the <strong>com</strong>mon criteria (art. 48(1)(b))<br />

(visa fee waiver and translation of application form).<br />

On fraud issues, several training sessions have been organised with a MS Immigration officer. This<br />

has been highly appreciated by the LSC members.<br />

2. Subjects to be addressed within the next reporting period (2014-2015):<br />

- 24(2): Facilitation of issuing multiple-entry, long-term visa<br />

- Maximal use of flexibility of the VC regarding visa fee waiver and visa fee reduction<br />

- Common criteria (art. 48(1)(b)) (visa fee waiver and translation of application form)<br />

- Implementation of the list of supporting documents (art. 14 and 48(1)a)<br />

- Harmonisation of the application of visa fee waiver (art. 16(5) and (6))<br />

Approved by MS in Minsk via silence procedure<br />

12893/14 PR/lm 26<br />

DG D 1 A<br />

EN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!