In-Service Inspection of Nuclear Power Plants - gnssn - International ...
In-Service Inspection of Nuclear Power Plants - gnssn - International ...
In-Service Inspection of Nuclear Power Plants - gnssn - International ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
This publication is no longer valid<br />
Please see http://www-ns.iaea.org/standards/<br />
Doc<br />
no.<br />
KKC-Q-KPOOl<br />
NUCLEAR POWER PLANT<br />
GOESGEN-DAENIKEN LTD Page : 3<br />
Of : 6<br />
1.<br />
1.1<br />
1.2<br />
Component data<br />
Name and address <strong>of</strong> operator :<br />
Kernkraftwerk GBsgen-Daniken AC<br />
46S8 Daniken<br />
Commission date <strong>of</strong> nuclear facility :<br />
1979<br />
1.3<br />
1.3 .1<br />
1.3 .2<br />
1.3 .3<br />
1.3 .4<br />
1.3 .5<br />
1.3 .6<br />
Components :<br />
System :<br />
Component designation<br />
Boiler number (SVDB) :<br />
Manufacturer :<br />
Serial number :<br />
Year <strong>of</strong> manufacture :<br />
PresBurizer<br />
YP<br />
YP10 B001<br />
-<br />
Oebriider Sulzer AC<br />
8401 Winterthur<br />
15'4O1<br />
1976<br />
1.3 .7. Location :<br />
A0312. A0422, AO522, A0622<br />
(Boon No.)<br />
1.3 .8<br />
Component design data :<br />
1.3.8.1 Safety catesory : 1<br />
1.3.8.2 Design temperature : 362°C<br />
1.3.8.3 Design pressure : 175 bar<br />
1.3.8.4 Capacity :<br />
Appro*. 42 m3<br />
1.3.8.S Ksdlun :<br />
Water/steam<br />
1.3.8.6 Steam/heat capacity : 15.12 kW<br />
1.3.8.7 Activity :<br />
57 (sal) Ci/m 3<br />
11 (primary coolant water) Ci/n3<br />
1.3.8.8 Materials :<br />
20 Hn Ni 55, plated with<br />
X 10 Cr Ni Tl 18 9<br />
90