This publication is no longer valid<br />

Please see http://www-ns.iaea.org/standards/<br />

Doc no<br />

'<br />

KKG-Q-KPOOO<br />

NUCLEAR POWER PLANT GOESGEN-DAENIKEN LTD<br />

Page : 2<br />

o£<br />

Organization <strong>of</strong> in-service inspections <strong>of</strong> mechanical components at the<br />

Gosnen-Danllcen <strong>Nuclear</strong> <strong>Power</strong> Plant<br />

<strong>In</strong>-service inspections are long-term recurrent inspections with<br />

the aim <strong>of</strong> detecting and evaluating defects or changes in mechanical<br />

components resulting from operation. Since in-service inspections are<br />

compared with one another, maximum reproducibllity is requested.<br />

<strong>In</strong>-service inspections are in principle planned and conducted on<br />

the basis <strong>of</strong> SVDB regulation NE14 "Plan for re-testing and operational<br />

supervision <strong>of</strong> components belonging to safety class 1-4".<br />

<strong>In</strong> order to cover all the components coming under the NE14<br />

regulation KKG-Q has made provision for a division <strong>In</strong>to 2 sections (see<br />

Annex 1)<br />

1. Systems examination programme (overall programme <strong>of</strong> a system)<br />

2. Component examination programme (detailed programme for relevant<br />

components)<br />

Re:<br />

1 Systems examination programme<br />

Systems examination programme should <strong>of</strong>fer in tabular form an<br />

overview <strong>of</strong> those sections which are to be recurrently tested in •<br />

given system. <strong>In</strong> principle, all components subject to acceptance<br />

are also subject to obligatory re-testing.<br />

These components are :<br />

Piping<br />

Containment penetrations<br />

Valves<br />

Pumps<br />

Vessels/heat exchangers<br />

Pipe supports<br />

Snubbles<br />