20.01.2015 Views

In-Service Inspection of Nuclear Power Plants - gnssn - International ...

In-Service Inspection of Nuclear Power Plants - gnssn - International ...

In-Service Inspection of Nuclear Power Plants - gnssn - International ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

This publication is no longer valid<br />

Please see http://www-ns.iaea.org/standards/<br />

Doc. no.<br />

KKG-Q-PSOll<br />

N(JCLEAR powER PLANT GOESGEN-DAENIKEN LTD<br />

fage , 3<br />

f : 10<br />

1. Applicability<br />

The specification is applicable for pressure or leak testing at the KKG<br />

carried out on individual components or systems sections, in the case <strong>of</strong><br />

both installation and inservice inspection tests.<br />

Exception :<br />

Primary circuit pressure testing<br />

Leak testing with vacuum techniques<br />

Leak testing with gas using gas detection and analysis<br />

techniques<br />

Containment vessel leak rate measurement<br />

The test media must be indicated separately for each application. Pressure<br />

testing with gal instead <strong>of</strong> liquids nay be conducted only in justified cases.<br />

2. Definitions<br />

Pressure test (PT)<br />

Leak test (LT)<br />

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!