20.01.2015 Views

In-Service Inspection of Nuclear Power Plants - gnssn - International ...

In-Service Inspection of Nuclear Power Plants - gnssn - International ...

In-Service Inspection of Nuclear Power Plants - gnssn - International ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

This publication is no longer valid<br />

Please see http://www-ns.iaea.org/standards/<br />

Doc.-No.<br />

KKG-Q-PSOO5<br />

NUCLEAR POWER PLANT GOESGEN-DAENIKEN LTD<br />

Annex. 5<br />

Page- 2<br />

out <strong>of</strong>: 2<br />

Rev.<br />

With nozzle welds the fillet must always be included in the examination<br />

area, i.e. the yoke magnet is to be placed in the weld area as shown<br />

under 1.1 and in the fillet area as shown in 1.2.<br />

Since the contact area <strong>of</strong> the yoke magnet with the test surface is limited<br />

with nozzle welds, adequate field strength must be demonstrated in respect<br />

<strong>of</strong> each weld by means <strong>of</strong> a tangential field strength measuring instrument.<br />

Jf magnetization is insufficient, another test technique or method, e.g.<br />

circular magnetization or liquid penetration, must be applied.<br />

2. Basic material testing<br />

Large surfaces on vessels etc. are to be divided into squares <strong>of</strong> max. 100 mm<br />

side length.<br />

6<br />

c'<br />

D<br />

A<br />

D<br />

\E -Q D'<br />

B<br />

o<br />

\<br />

A'<br />

O<br />

4<br />

cm<br />

Test area<br />

\<br />

D<br />

O<br />

a<br />

D'<br />

a<br />

Sequence:<br />

AA-A'A 1<br />

BB-B'B 1<br />

CC-C'C<br />

DD-D'D'<br />

Check with the Berthold magnetic<br />

field indicator whether there<br />

is sufficient magnetization,<br />

and if not, select further<br />

intermediate positions.<br />

135

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!