20.01.2015 Views

In-Service Inspection of Nuclear Power Plants - gnssn - International ...

In-Service Inspection of Nuclear Power Plants - gnssn - International ...

In-Service Inspection of Nuclear Power Plants - gnssn - International ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

This publication is no longer valid<br />

Please see http://www-ns.iaea.org/standards/<br />

Doc. no.<br />

KKG-Q-KPOOl<br />

NUCLEAR POWER PLANT GOESGEN-DAENIKEN LTD<br />

Page : h<br />

<strong>of</strong><br />

2. Examination regulations<br />

SVDB-NE14, Rev. 2 (18.2.1986), procedure for in-service inspection<br />

and supervision <strong>of</strong> nuclear power plant components subject to<br />

acceptance and belonging to safety categories 1-4.<br />

3. Examination time schedule<br />

3.1 The baseline inspection took place after the pressure testing <strong>of</strong><br />

the primary system. For the pressurizer, which was already pressure<br />

tested on completion <strong>of</strong> fabrication, this means that the baseline<br />

inspection followed the second component pressure test.<br />

3.2 The SVDB is invited in due course by the KKG to undertake<br />

supervision <strong>of</strong> the baseline and in-service <strong>In</strong>spection test.<br />

Announcement <strong>of</strong> the test is issued with the relevant annual or<br />

outage inspection schedules.<br />

4. Examination conditions<br />

4.1 Examination <strong>of</strong> the pressurizer proceeds in accordance with the<br />

component examination programme tables.<br />

4.2 <strong>In</strong> principle, the tests are conducted from the outside only, after<br />

removal <strong>of</strong> the insulation.<br />

Justification; After operation startup, a specific activity <strong>of</strong> 57<br />

(gas) or 11 (water) Ci/m 3 is to be expected in the<br />

interior <strong>of</strong> the pressurizer.<br />

Exception :<br />

Visual <strong>In</strong>spection <strong>of</strong> the internal plating and<br />

internal components in the area <strong>of</strong> the handhole<br />

nozzle.<br />

N.B. Owing to the built-in thermal skirt, internal<br />

inspection <strong>of</strong> the vessel wall is not possible<br />

from the manhole.<br />

4.3 The test methods and specifications together with the test<br />

programme for the individual test areas can be seen from the<br />

component examination programme table.<br />

4.4 The position and designation <strong>of</strong> the welds or examination zones can<br />

be seen from Annex 1.<br />